Exhibition Stands
Four kinds of stand, one workshop in Frankfurt, and installation across every European hall we work in. This page is the decision, not the catalogue: what each type is for, what it costs, and how to tell which one your show actually needs.
Stands from our portfolio
Eight recent builds, custom and modular, across German, Spanish, Italian and French halls. Every one drawn, cut, shipped and installed by the same team.








What an exhibition stand costs
European brackets for a complete build — structure, graphics, lighting and catalogue furniture, installed and dismantled. Not included anywhere: the organiser’s floor space, venue electrics and rigging, or local taxes.
- One clear message and a welcome counter
- Graphics wall and lit fascia
- Storage cupboard from 18 m²
- Assembles in about one day
- Separate meeting area and storeroom
- Product display wall or demo counter
- Suspended or structure-mounted lighting
- Hospitality counter
- Multiple zones and circulation design
- Double-height branding elements
- Closed meeting room
- Full lighting and AV integration
Cost per square metre falls as footprint rises. Smaller stands carry a higher rate per square metre, because freight and crew are largely fixed regardless of footprint. The ranges cover the modular build itself. Floor space rental, venue power connection, organiser fees, taxes and travel are not included — see the scope list above. For a firm number, send the show and stand size and you will get a quote rather than a bracket.
Stands by size
Each size has its own page with the designs we build at that footprint, the full scope, and an honest European price range. Every stand is quoted from its own drawing. The brackets below are where European builds of each size actually land.
9 m²Single message, welcome counter€4,100–8,700
18 m²Adds storage and seating€4,800–10,100
20 m²Corner-friendly, two open sides€4,900–10,300
24 m²Meeting table and storeroom€5,100–10,800
27 m²Demo counter plus seating€5,200–11,000
28 m²Split display and meeting zones€5,500–11,600
30 m²Product wall and hospitality€5,600–11,800
45 m²Separate meeting area€7,600–16,000
48 m²Island layout, four approaches€7,900–16,800
50 m²Zoned circulation€8,250–17,500
54 m²Closed meeting room€8,900–18,900
60 m²Multiple zones, raised branding€9,900–21,000
80 m²Full island with double-height€13,200–28,000
Under 50 m²One architectural idea, done properly€9,000–50,000
50–80 m²Meeting zone, storeroom, hospitality€15,000–80,000
80–100 m²Zoned circulation and closed rooms€24,000–100,000
100–120 m²Behaves like a small building€30,000–120,000
120–200 m²Rigged ceilings, second storey possible€36,000–200,000
Over 200 m²Temporary architecture, demo arenas€60,000–350,000Need more than 80 m², or a layout the system cannot carry? A bespoke build is usually the better answer, and we will say so rather than stretching a system to fit.
What you are actually buying
An exhibition stand is four different purchases wearing one name. A modular stand is a reusable aluminium system you own and re-skin. A custom stand is drawn from a blank floor plan and mostly does not travel. A double-decker buys floor area you have not rented. A country pavilion houses many exhibitors under one identity. They have different lead times, different cost curves and different failure modes, and choosing between them is the single decision that most affects what you end up paying.
What does not change is the chain underneath. Somebody draws it, somebody cuts it, somebody puts it on a truck, and somebody stands in the hall at six in the morning making it fit a floor that turned out not to be level. We do all four from one workshop in Frankfurt. That is not a slogan about integration — it is the reason there is nobody to hand a problem to when a hall opens on a Tuesday and the graphics are wrong.
The variable that decides your budget is not usually square metres. It is how often you exhibit. A company doing one flagship show a year and a company doing five regional ones should not buy the same thing, even at the same footprint. The first is buying a one-off object; the second is buying an asset plus a per-show running cost. Most of the money we see wasted comes from applying the first model to the second situation.
The second variable is the stand number, not the area. A 30 m² corner with two open sides carries far more usable frontage than a 30 m² inline with one. We ask for the hall and stand number before we draw anything, because the number tells us how many sides face an aisle, and that changes the design more than adding ten square metres would.
What we do not sell is shell scheme. That is the organiser’s own partition walling, ordered from the show, and dressing it is a different trade. If your budget only reaches a dressed shell this year, say so and we will tell you honestly whether it is worth doing at all — some halls it is, some it very much is not.
What one workshop actually changes
Nobody to hand it to
The person who drew the stand and the people who cut it are in one building, and both are in the hall when it goes up. When something is wrong at six in the morning, it gets fixed rather than escalated.
One contract, one number
Drawing, structure, graphics, freight and installation are quoted together. You are not reconciling a design fee against a build invoice against a logistics bill after the show.
Built before it ships
Stands are assembled and photographed in Frankfurt before anything goes on a truck. Problems surface in the workshop, where they cost hours, not in the hall, where they cost the show.
Graphics carry the brand
Prints, lightboxes and fascia panels change per campaign at a fraction of the frame cost, so the stand looks new without being rebuilt.
Custom elements bolt in
Joinery counters, closed storage, raised platforms and suspended rings integrate with the system — the modular base does not cap the design.
Storage between shows
We hold your system in Frankfurt, inspect it after each event and refresh the graphics for the next one, which keeps every subsequent build faster.
From brief to handover

Brief
Send the show, hall, stand number and open sides. We read that venue’s technical guidelines and confirm height limits and rigging rules before a line is drawn.

3D design
A 3D concept within 48 hours, worked to your products and brand rather than dropped onto a template. Revisions until the layout is right.

Quotation
An itemised quote against the approved design — structure, graphics, lighting, furniture, transport and crew, each priced separately.

Production
Frame, joinery, graphics and lighting are built and test-assembled in our Frankfurt workshop, so faults surface on our floor and not in the hall.

Delivery & installation
We ship, build inside the organiser’s build-up window with a project manager present, support you through the show and dismantle afterwards.
Modular, custom, double-decker or pavilion
Modular is the reusable route. An aluminium system, bought once, reconfigured and re-skinned per show. It covers 9 m² up to an 80 m² island, assembles to a fixed sequence in about a day, and the recurring cost drops to graphics and freight. It is the right answer for anyone exhibiting more than twice a year, and it is the answer most exhibitors arrive at by their third season whether or not they started there.
Custom starts from nothing. No system geometry to work around, so curved fascias, unusual materials, closed meeting rooms and sculptural elements are all available. It costs more per square metre, needs a longer lead time, and most of it does not come back. That is the correct trade for a product launch, a flagship show, or a footprint over roughly 100 m² where the architecture itself is doing the persuading.
A double-decker is the answer to a specific problem: you need more room than you have rented and the floor price makes renting more unattractive. Where hall height and organiser rules allow it, a second storey turns 100 m² into roughly 160 m² of usable area, with meetings upstairs and traffic below. It brings real engineering with it — structural calculations, a stamped design, venue approval and a longer build-up — so it is worth it when meeting space is genuinely the constraint, and not otherwise.
A country pavilion is a different discipline again. You are housing a trade body, a regional cluster or a national delegation: many exhibitors, one identity, individual co-exhibitor spaces, a shared reception and back-of-house. The hard part is not the build, it is fairness — every participant needs visible frontage while the pavilion still reads as one thing from the aisle.
If you are unsure which of the four you are describing, send the show, the hall, the stand number and what you need to happen on the stand. We will tell you which one fits, including when the answer is the cheaper one.
Getting a stand right
Four things that change the outcome, learned on build-ups rather than written for a brochure.
Decide the type before the design
Most of the money that gets wasted is spent before a drawing exists, on a stand type that did not suit the calendar. Tell us how many shows you have in the next two years and at what footprints, and the choice between modular and custom usually makes itself.
Open sides matter more than square metres
A 30 m² corner with two open sides carries far more visible frontage than a 30 m² inline. We design to the sides you actually have, which is why the stand number is more useful to us than the area.
The delay is almost never fabrication
Large-format prints and backlit panels need artwork about three weeks out. Structures come together quickly; what runs late is brand or legal sign-off inside the exhibitor’s own company. Start that earlier than feels necessary.
Height and rigging belong to the ground
Messe Frankfurt and Messe Düsseldorf both scrutinise anything over 4 m, each in its own format on its own deadline. Not every hall permits roof suspension, and some charge per point. That belongs in the design, not on the build day.
Exhibition stands — common questions
How do I know whether I need a modular or a custom stand?
Count your shows. If you exhibit more than twice a year at broadly similar footprints, modular almost always wins on total cost, because you buy the structure once and pay for graphics and freight after that. If you exhibit once a year at a flagship show, or your footprint is over roughly 100 m² and the architecture is doing the selling, custom is the right call. Send us your next two years of shows and we will tell you which — including when the cheaper answer is the right one.
What does an exhibition stand cost?
A 9 m² modular build starts around €4,100 and a mid-size modular island lands between €7,600 and €18,900. Custom starts higher per square metre and rises with complexity rather than area alone. Every figure on this page includes design, fabrication, European freight and on-site labour. None of them include the floor space you rent from the organiser, venue electrics and rigging, or local taxes.
How long before the show do you need the brief?
For a modular build, six to eight weeks is comfortable and four is workable. For custom, twelve weeks is realistic and anything under eight starts removing options rather than just adding cost. The constraint is rarely fabrication — it is artwork approval inside your own organisation, which is why we ask for the show date before we ask for anything else.
Do you install, or do we arrange a local crew?
We install. The crew on site is the crew that built the stand, travelling from Frankfurt. That is the whole point of doing fabrication and installation in one company: when a floor is not level or a graphic is 40 mm out, the people fixing it are the people who made it.
Can you build at a venue you have not worked before?
Yes, and we say so plainly when it is a first time there. What changes is preparation, not capability — we read that ground's technical guidelines properly rather than assuming they match the last hall, because height limits, rigging rules and delivery windows belong to the venue, not the country.
What happens to the stand after the show?
We dismantle, return it to Frankfurt and store it between shows if it is being reused. For a modular system that is the normal cycle, and the storage cost is small against re-fabricating. For a one-off custom build, most of it does not come back, and we will tell you at quote stage which elements are worth keeping.
Do you supply shell scheme?
No. Shell scheme is the organiser's own partition walling, ordered through the show. Dressing one is a different trade and we do not sell it. If that is genuinely where your budget sits this year, we will say whether it is worth doing at that hall at all.
Can one stand work across different stand numbers and hall shapes?
That is exactly what a modular system is for. A 45 m² island regroups into a 24 m² corner from the same parts with a new graphics set. It has to be designed for that from the start though — retrofitting flexibility onto a system built for one footprint is the expensive route.
Tell us the show and the stand number
We will come back with a 3D concept and an itemised quote — and an honest view on whether modular is the right call for your calendar.