Skip to content
wire Düsseldorf 2028
SOL Germany · Düsseldorf

Exhibition Stand Builder for wire in Düsseldorf

Stands for Messe Düsseldorf, 3–7 April 2028 — built and dry-assembled in our Frankfurt workshop, driven 230 kilometres up the A3, and installed by our own crew. Planned around what a wire stand actually has to hold up: drawing benches, spoolers and extrusion demonstrators that are heavy, powered and, in a lot of cases, running.

€4,500+From
500+Stands
15 YrsEurope
4.9Trustpilot4.9Google
Browse Designs
wire Düsseldorf stand builder — SOL Germany stand for a cable machinery exhibitor at Messe Düsseldorf
3–7 APR 2028
Düsseldorf, Germany
3–7 April 2028Show Dates
Messe DüsseldorfVenue
BiennialCycle
1,490 in 2026Exhibitors
Messe DüsseldorfOrganiser
Halls 10–17Location
Event Overview

wire Düsseldorf 2028 — Everything You Need to Know

wire is the reference exhibition for the wire and cable industry and has run in Düsseldorf since 1986. It does not run alone: Tube shares the same fairground, the same week and the same admission. That single fact changes how you should read every attendance figure published about it, and it is where most planning for this show goes wrong.

wire Düsseldorf 2028 — At a Glance

Dates
3–7 April 2028 (Monday to Friday)
Opening hours
Visitors 09:30–18:00 Monday to Thursday, 09:30–16:00 Friday. Exhibitors get in from 08:00, and until 19:00 Monday to Thursday
Venue
Messe Düsseldorf — halls 10 to 17
Entrances
North A at ground level, North B on the first floor, East and South
Cycle
Biennial. The 2026 edition ran 13–17 April 2026 and has already taken place
Runs alongside
Tube Düsseldorf 2028, on the same dates and the same fairground, on one admission
Scale (2026)
1,490 exhibitors across 66,978 m² for wire itself. The 52,074 attendance figure is the gate for wire and Tube together, not wire alone
Build-up and breakdown
Not published yet — the organiser's own page still reads that the information is to follow
Stand builder access
Am Staad, Tor 1, D-40474 Düsseldorf — the forwarder and contractor entrance, not the visitor entrances

Why Exhibitors Choose SOL Germany for wire Düsseldorf

A wire stand is usually a machinery stand with a design brief attached. Exhibitors bring drawing benches, spoolers, coilers, payoffs, extrusion demonstrators and testing rigs, and a good proportion of them intend to run those machines in front of visitors rather than stand them still under a spotlight. That changes the order in which decisions have to be made. Point loads, three-phase supply positions, guarding clearances and an access route wide enough to roll the machine in all have to be settled before anyone approves a rendering, because each of them can move a wall. We ask for the machine list — model, footprint, weight, power draw, whether it runs — before we draw anything.

The structure is built and dry-assembled on our own floor in Frankfurt, photographed while it is still standing for your approval, then dismantled and driven about 230 kilometres north up the A3 to Düsseldorf. Domestic road freight, no border, no customs file, no temporary-import paperwork sitting on the critical path. For an exhibitor bringing machinery in from outside the EU, that separation is worth more than it sounds: the machine can run on its own customs timeline without the stand being hostage to it. If the equipment is late you still have a finished stand and a problem about one exhibit, rather than a problem about whether you are exhibiting.

One point specific to the cycle. wire is biennial, so the gap between editions is twenty-four months rather than twelve, and the reuse arithmetic that works at an annual show does not simply transfer. We will tell you honestly which parts of a build are worth storing for two years and which are cheaper to remake — that conversation belongs at the design stage, not at the dismantle.

What you sign is one quote. There is no second invoice arriving three weeks after the hall is empty.

From Our Project Managers

What We Have Learned Building in Düsseldorf

Six things worth knowing before you brief anyone — operational detail that does not appear on an organiser page.

CD

The Attendance Figure on Your Board Belongs to Two Shows

This is the wire-specific one, and it is worth more than any other note here. The organiser's facts page for wire 2026 gives 52,074 visitors, 1,490 exhibitors and 66,978 square metres. Look up Tube for the same edition and you get 52,074 visitors, 1,123 exhibitors and 51,045 square metres. The visitor number is identical because wire and Tube share one gate on one ticket — it is the combined figure appearing on both shows' pages. The exhibitor and space figures are genuinely per show. So wire is 1,490 exhibitors on 66,978 square metres, and 52,074 people walked the pair. Plan your staffing rota and your lead target against your own hall and your own segment. If you brief a team of six on the basis that fifty-two thousand people are coming to see wire, you will overstaff a perfectly good show and then feel let down by it.

Heavy Goods Go In First, and That Window Is Not the Stand Window

The sequence that catches first-time machinery exhibitors is not the stand build, it is what has to happen before it. A drawing bench or an extrusion line goes into the hall while the aisle is still clear and there is still something to lift it with — which is early in build-up, not late. Mechanical handling inside the halls runs through the appointed logistics contractor, and it is booked with the freight weeks ahead rather than arranged on the morning. Turning up on the last build-up day with a machine on a low-loader and an expectation of finding a forklift is how a stand ends up finished around an empty plinth. We plan the stand build in two passes: machine in and positioned first, structure closed around it second.

A Running Machine Produces Something — Decide Where It Goes

Static machinery is a display. Running machinery is a small production process sitting in a carpeted hall, and it generates things that need somewhere to go. A drawing or spooling demonstration produces wire, offcuts and scrap. There may be lubricant, coolant or fine metallic dust. There will be noise, and on a rotating machine there will be guarding requirements and a clearance zone that visitors must not be able to reach into. None of that is difficult once it is on the table, and all of it is expensive when it surfaces during build-up. We ask early and specifically: does it run, what comes out of it, who empties it, and how loud is it at two metres.

Halls 10 to 17 Are Not One Hall

wire occupies halls 10 through 17 and they are not interchangeable. Floor loading limits, service duct positions, clear height and column spacing vary between them, and the hall you are allocated is decided by segment and by how early you applied. It is a common and expensive assumption that a figure quoted for the fairground applies to your specific stand. It does not always. Once your hall and stand number are confirmed we check the loading and the supply positions for that hall rather than working from a general number — particularly for anything on point loads, which is most wire machinery.

The 2028 Build-Up Calendar Is Not Out Yet — Plan Backwards Anyway

As things stand the organiser's own information page lists the stand construction and dismantling periods as still to be announced, and the exhibitor ordering system does not yet have a published opening date for 2028. That is normal this far ahead and it is not a reason to wait. Everything else is anchored: the show opens Monday 3 April 2028 and closes on the Friday, freight has to be scheduled, and machinery handling has to be booked with it. We work backwards from the show dates, hold the build-up assumptions loosely, and re-check the organiser's pages as the edition approaches. What we do not do is copy a build-up window from the 2026 edition and treat it as fact.

Two Years Is a Long Time to Leave a Stand in a Warehouse

At an annual show, storing a modular frame and refreshing the graphics is almost always cheaper than rebuilding. At a biennial show the sum is closer. Twenty-four months of storage costs more than twelve, and more to the point, two years is long enough for a brand refresh, a product range change or a rebrand to make the graphics obsolete anyway — and graphics are the part that gets replaced regardless. The system frame usually still earns its keep. Bespoke joinery and anything cut to a specific machine footprint often does not, because the machine you show in 2030 may not be the machine you showed in 2028. We would rather have that conversation while we are designing than hand you a storage invoice for something you will not use.

Transparent Pricing

wire Düsseldorf 2028 Stand Pricing

Real ranges, in euros, for a stand delivered to Messe Düsseldorf and taken away again afterwards. Machinery stands sit at the upper end of any size band, because reinforced flooring, three-phase distribution and a genuine access route all cost money and all get designed in from the start. We would rather say that here than discover it together at quotation stage. Floor space is bought from the organiser and is not part of any figure below.

Essential — 9–18 m²

From €4,500
Best for: die and lubricant suppliers, testing and measurement vendors, component and consumable distributors, first-time exhibitors at wire
  • Modular aluminium system frame
  • Backlit fabric back wall, full height
  • One branded reception counter
  • Standard LED top-rail lighting
  • Single-phase power and a lockable store
  • Graphics design and print (two revision rounds)
  • Frankfurt → Düsseldorf road freight
  • Installation, dismantling and organiser paperwork

Not included: three-phase supply, reinforced machine flooring, enclosed meeting room, mechanical handling of exhibits.

Premium — 60 m² and above

From €34,000
Best for: machinery manufacturers taking a hall presence, two-storey builds, exhibitors showing a full production line
  • Two-storey or open-plan headline structure
  • Static calculations and approval submission handled for you
  • Hospitality level above the demonstration floor
  • Multiple serviced machine positions with independent supply
  • Dedicated project manager from brief to dismantle
  • Storage of the structure between editions
  • On-site supervisor for the full build and show period

Not included: floor space, catering itself, venue-ordered services, machinery handling and rigging.

Recent Builds

Stands We Have Built

Recent stands from our Frankfurt workshop, delivered across German and European venues.

A Practical Guide to Exhibiting at wire Düsseldorf

wire is the international trade fair for the wire and cable industry and has been running at Messe Düsseldorf since 1986. The 2028 edition takes place from Monday 3 to Friday 7 April 2028, in halls 10 to 17. Visitor hours are 09:30 to 18:00 from Monday to Thursday and 09:30 to 16:00 on the Friday; exhibitors have access from 08:00 each morning and until 19:00 Monday to Thursday. Those extra hours before and after the public day are more useful than they look — they are when machinery gets checked, restocked and reset without visitors standing in the way.

The subject matter spans machinery for wire manufacturing and finishing, process engineering, tools and dies, materials, special wires and cables, and measurement, control and testing technology, with fibre optic technology a long-standing strand. If you make something that draws, coats, spools, tests or transmits, this is the floor where your buyers already are.

wire and Tube Run Together — and the Numbers Show It

wire does not run on its own. Tube, the international tube and pipe trade fair, occupies the same fairground on exactly the same dates, and visitors move between the two on a single admission. For a lot of exhibitors that is the reason to be there at all: a machinery buyer looking at tube-drawing equipment is frequently the same buyer looking at wire-drawing equipment, and the pairing puts both in one trip.

It also distorts the headline statistics, and this is worth being precise about. The organiser's facts page for wire 2026 lists 52,074 visitors, 1,490 exhibitors and 66,978 square metres of exhibition space. The same 52,074 visitor figure appears against Tube, whose own exhibitor count is 1,123 and whose space is 51,045 square metres. The visitor number is shared because the gate is shared — it counts everyone who came to the pair. The exhibitor and space figures, by contrast, are genuinely per show.

The practical consequence is simple. Use 1,490 exhibitors and 66,978 square metres when you are thinking about wire's competitive density, and treat 52,074 as the size of the combined audience walking past. Do not build a staffing rota, a lead forecast or a stand-size argument on the assumption that fifty-two thousand people are coming specifically to see wire, because a meaningful share of them came for tube and pipe.

The 2026 Edition Has Already Happened

wire is biennial. The 2026 edition ran from 13 to 17 April 2026 and is finished. The next one is 3 to 7 April 2028. This sounds like a trivial point and it is not: a number of stand-builder, travel and directory pages are still presenting the 2026 dates as upcoming, and some of them carry deadline advice attached to those dates. If you are working from a page that does not name the year prominently, check it.

There is a second wrinkle worth noticing while you are checking. At the time of writing, the organiser's own website is part-way through its rollover to the 2028 edition. The date and opening-hours pages have been updated to 3–7 April 2028, while the navigation, the programme pages and the exhibitor search still carry 2026 labels. That is normal housekeeping two years out, but it means the safe source for dates is the opening hours or at-a-glance page specifically, not the first thing you land on.

What a Wire Stand Has to Carry

The defining constraint at wire is not aesthetic, it is mechanical. Drawing benches, spoolers, coilers, payoffs, take-ups and extrusion demonstrators are heavy, and their weight is concentrated into small feet rather than spread across a floor. A stand that would be perfectly sound under furniture and display cases needs load spreading and, often, reinforced flooring under those feet. Floor loading needs to be checked against the specific hall you are allocated in the 10-to-17 range, not against a general figure for the fairground.

Power is the other half. Three-phase 400 V supply is routine here rather than exceptional, and supply positions are fixed to the floor plan before the hall build begins, which means the electrical layout has to be settled before the walls are drawn. Retrofitting a cable run to a machine position that moved late is the single most common cause of visible cable trays crossing a visitor route, and a demonstration stand with cables taped across an aisle reads as unfinished no matter how good the graphics are.

Then there is access. A machine has to physically get to its position, which means a route from the hall door to the plot that is wide enough, high enough and clear at the right moment. On a closed-sided stand that route has to be designed in as an opening that closes afterwards, not discovered on the day. We ask for machine footprints and weights at the brief stage precisely so that the structure can be sequenced around them.

Live Demonstrations: What We Handle and What Stays With You

Running a machine on the stand is the most persuasive thing most wire exhibitors can do, and it is entirely normal at this show. It is also the part with the most moving pieces, so it is worth being clear about where the line sits.

What we design and build: reinforced flooring and load spreading under the machine; three-phase distribution to the machine position with cable management concealed; guarding integration and a clearance zone that visitors cannot reach into; sightlines so that the demonstration is visible from the aisle without a crowd blocking your own meeting area; acoustic separation between a noisy machine and any space where you intend to have a conversation; and the structural sequencing that gets the machine in before the stand closes around it.

What stays with you or with a specialist: the machine itself, its commissioning and its operator; mechanical handling and craneage into the hall, which is booked through the appointed logistics contractor with the freight; consumables and material feed; and removal of whatever the process produces. That last one is genuinely worth planning. A demonstration that produces wire, offcuts, swarf, lubricant or fine dust needs a decision about who empties what and how often, and it is much cheaper to make that decision in February than on the second morning of build-up.

There is one more thing we would rather say plainly. If a demonstration needs compressed air, water, extraction or a load that sits well outside normal hall provision, that is a venue services conversation with its own deadline. We will flag it and tell you where to order it, but it is ordered in your name, and the deadline for it is usually earlier than exhibitors expect.

Building From Frankfurt, Showing in Düsseldorf

Our workshop is in Frankfurt. Düsseldorf is about 230 kilometres north on the A3 — a two-and-a-half hour run, domestic freight, no border and no customs file. We build and dry-assemble the complete structure on our own floor, photograph it standing for your approval, then dismantle it, load it and drive it up. Problems surface in a workshop where we have tools, spare material and time, rather than in hall 12 on a build-up deadline with a queue behind us.

Contractor and forwarder access to the fairground is at Am Staad, Tor 1, in 40474 Düsseldorf, which is a different entrance from the visitor entrances at North A, North B, East and South. It is a small detail that matters on the morning: a driver routed to a visitor entrance loses an hour he did not have.

For exhibitors importing machinery from outside the EU, the value of building domestically is that it decouples two timelines. Your machine can clear customs on its own schedule while the stand proceeds on ours. We have never regretted keeping those two things separate, and we have seen what happens when they are not.

Planning Around a Two-Year Cycle

A biennial show rewards a different plan from an annual one. With twenty-four months between editions, the case for storing a complete bespoke build weakens: storage costs run for twice as long, and two years is long enough for a rebrand, a product launch or a range change to make a fitted structure the wrong shape. Graphics get replaced either way.

What does travel well across a two-year gap is a modular system frame. It dismantles, stores flat, and comes back with new graphics and a revised layout at a fraction of a rebuild. For machinery exhibitors the sensible hybrid is usually a reusable frame plus purpose-built elements around the machine positions — the frame survives to 2030, the machine-specific joinery is made for the machine you are actually showing.

The other consequence of the cycle is that space applications open and close a long way ahead, and hall position is allocated broadly in application order. Being early is worth more here than at a show that comes round every year, because a poor position has to be lived with for two years rather than one.

For a biennial show, a reusable system frame is usually the sounder investment — it stores flat in our Frankfurt warehouse between editions and comes back for the 2030 edition needing graphics and freight rather than a rebuild. Our modular exhibition stands are built for exactly that pattern.

FAQ

wire Düsseldorf 2028 — Questions and Answers

Real answers with real numbers. Click any question to expand.

When is the next wire in Düsseldorf?

wire 2028 runs from Monday 3 to Friday 7 April 2028 at Messe Düsseldorf. The show is biennial, so this is the next edition after 2026 — there is nothing in between. Visitor hours are 09:30 to 18:00 Monday to Thursday and 09:30 to 16:00 on the Friday.

I thought wire was in April 2026 — did I miss it?

The 2026 edition ran from 13 to 17 April 2026 and has already taken place. The next edition is 3 to 7 April 2028. A number of directory and stand-builder pages still show the 2026 dates as upcoming, so it is worth checking the year on anything you are reading — including any deadlines it quotes.

Which halls does wire use?

Halls 10 to 17 at Messe Düsseldorf. Which hall you land in depends on your segment and on when you applied for space. It matters more than it sounds: floor loading, service duct positions and clear height vary between halls, so we check the figures for your specific hall once the stand number is confirmed rather than working from a general fairground number.

Is wire the same event as Tube?

No, they are two separate trade fairs that run at the same time on the same fairground under the same organiser, on one admission. wire covers wire and cable; Tube covers tube and pipe. Visitors move freely between them, which is why many machinery buyers treat it as one trip.

Are the 52,074 visitors all wire visitors?

No, and this is the single most useful thing to get right when planning. That figure is the combined gate for wire and Tube together — it appears identically on both shows' facts pages because the two share one admission. wire's own 2026 figures are 1,490 exhibitors across 66,978 square metres of exhibition space. Size your stand and your staffing rota against your own segment, not against the combined number.

When are build-up and dismantling for 2028?

Not published yet. The organiser's information page currently states that the stand construction and dismantling periods are still to be announced, and there is no published opening date for the 2028 exhibitor ordering system either. That is normal this far out. We plan backwards from the confirmed show dates and re-check the organiser's pages as the edition approaches rather than copying the 2026 windows across.

What does a stand at wire Düsseldorf 2028 cost?

Our builds start at €4,500 for a 9 m² modular stand and run to around €48,000 for an 80 m² premium or two-storey build. A 24 m² custom stand with one reinforced machine position typically lands between €11,500 and €15,000, and a 48 m² stand with three-phase distribution and two machine positions between €19,000 and €26,000. Floor space is bought separately from the organiser.

What is included in that price?

Free 3D design before you sign anything, build and inspection at our Frankfurt workshop, road freight to Messe Düsseldorf, installation and dismantling by our own crew, an on-site supervisor, organiser paperwork, and a dedicated project manager from the brief through to the empty floor after dismantle.

What is not included?

Floor space rented from the organiser, hall services ordered directly from Messe Düsseldorf such as power supply and connections, mechanical handling and craneage of your own machinery, catering, and your travel and accommodation. These sit outside the build price on every quote we issue.

Can I run a machine live on the stand?

Yes, and at wire it is normal rather than exceptional. We design the reinforced flooring, the three-phase distribution, the guarding integration and clearance zone, the sightlines and the acoustic separation, and we sequence the build so the machine goes in before the structure closes around it. The machine itself, its operator, its commissioning and the mechanical handling into the hall stay with you or with the appointed logistics contractor.

How much weight can the stand take?

That depends on the hall rather than on the stand. Floor loading limits differ across halls 10 to 17, and machinery weight arrives as point loads through small feet rather than spread across an area, so the relevant question is load per foot, not total mass. Send us machine weights and footprints at the brief stage and we will check them against your allocated hall and design load spreading or reinforced flooring accordingly.

Who moves my machine into the hall?

Mechanical handling inside the halls runs through the appointed logistics contractor, and it is booked together with your freight, weeks ahead. It is not something that can be arranged on the morning. We coordinate the stand build around the handling slot, but the handling itself is contracted in your name.

What happens to the material my demonstration produces?

That needs a decision before build-up. A running drawing or spooling demonstration produces wire, offcuts and scrap, and may involve lubricant, coolant or fine metallic dust. We design in somewhere for it to go and keep it out of the visitor route, but emptying, disposal and any special handling need to be agreed with you, and where the volume is significant it becomes a venue services order with its own deadline.

Do I need three-phase power?

For running machinery, almost always. Three-phase 400 V supply is routine at this show. The honest answer depends on your machine list, which is why we ask for model numbers, weights and power draw before we draw a wall. What is generally true is that supply positions are fixed to the floor plan and cannot be moved once the hall build starts, so the electrical layout has to be decided early rather than adjusted late.

How long does the whole process take?

Twenty-eight days from approved design to a finished stand on the show floor is a normal timeline for us. The design is faster — a first 3D concept usually comes back within 48 hours of a clear brief. What cannot be compressed is the organiser and venue deadline chain: space application, services orders, machinery handling booking and, for two-storey stands, structural approval.

Do you build in Düsseldorf or ship from Frankfurt?

We build and dry-assemble the complete structure at our Frankfurt workshop, photograph it for your approval while it is still standing, then dismantle it and drive it about 230 kilometres up the A3 to Düsseldorf. Domestic road freight, no border, no customs file. Our own crew installs it in the hall. Contractor access is at Am Staad, Tor 1, which is a different gate from the visitor entrances.

Can I reuse the stand at the 2030 edition?

A modular system frame, yes — it dismantles, stores flat in our Frankfurt warehouse and comes back needing graphics and freight rather than a rebuild. We will be straight with you about the rest. Two years of storage costs more than one, and bespoke joinery cut around a specific machine footprint often is not worth keeping, because the machine you show in 2030 may not be the one you show in 2028. The usual answer for machinery exhibitors is a reusable frame plus purpose-made elements around the machine positions.

Can we have a two-storey stand?

Yes, and at a machinery show they earn their cost, because putting hospitality above a noisy demonstration floor solves a real problem. The constraint is timing rather than engineering: static calculations and venue approval have to be submitted by a fixed deadline months ahead, and approval is not automatic. Raise it in the first conversation rather than after the concept is signed off.

Do you handle the organiser paperwork?

Yes. Stand design submission, technical drawings, height and structure declarations and the venue's own forms are part of the project. Anything that has to be ordered in your company's name — floor space, some hall services, machinery handling — we prepare and tell you exactly when to submit.

When should I book space?

As early as you can. Hall position is allocated broadly in application order, and at a biennial show a poor position has to be lived with for two years rather than one. Nine to twelve months ahead of the show is a reasonable target for space, and the stand can follow — provided it starts early enough to clear the services, handling and structural deadlines.

Do you do graphics and print as well?

Yes, with two revision rounds included in every package. For a machinery audience we usually argue for fewer words and larger type. A visitor walking two co-located fairs in a day is scanning, not reading, and a wall of specification text reads as noise at three metres. Put the specification where a conversation happens, not on the aisle-facing wall.

What size stand do I actually need?

It depends on what has to stand on it. Dies, consumables, samples and documentation fit comfortably in 9 to 18 m², and the money is better spent on graphics and lighting. One machine running, plus somewhere to sit down, means 24 m² as a floor. Two machine positions plus an enclosed meeting area means 48 m². Below those thresholds something gets squeezed, and on machinery stands it is almost always the meeting space that goes first.

Ready to Exhibit

Let's plan your wire Düsseldorf stand

Send us the space, the machine list and what you intend to run. You will have a 3D design within 48 hours and a single all-inclusive price — no second invoice after the hall is empty.

48hrFree 3D Design
€4,500+All-Inclusive
28 daysTo Show Floor
4.9Trustpilot4.9Google
WhatsApp us
WhatsApp us
Live now