Skip to content
K 2028
SOL Germany · Düsseldorf

Exhibition Stand Builder for K (Plastics & Rubber) in Düsseldorf

Stands for K 2028 at Messe Düsseldorf, 18–25 October — built in our Frankfurt workshop and installed by our own crew. Engineered around what a plastics and rubber show actually puts on the floor: machines that run live, and the process water, compressed air, three-phase load and floor strength they need to run.

€4,500+From
500+Stands
15 YrsEurope
4.9Trustpilot4.9Google
Browse Designs
SOL Germany exhibition stand for a plastics and rubber machinery exhibitor at Messe Düsseldorf for K
18–25 OCT 2028
Düsseldorf, Germany
18–25 October 2028Show Dates
Messe DüsseldorfVenue
TriennialCycle
3,200+Exhibitors
Messe DüsseldorfOrganiser
168,000+Visitors
Event Overview

K 2028 — Everything You Need to Know

K is the world's leading trade fair for plastics and rubber, and it takes over the entire Düsseldorf fairground — Halls 1 to 17 — for eight days every three years. It is the largest and most machinery-heavy show we build in Germany, and the stand engineering starts long before the styling does.

K 2028 — At a Glance

Dates
18–25 October 2028 (Wednesday to Wednesday) — eight days, daily 10:00–18:30
Venue
Messe Düsseldorf, using the full fairground, Halls 1–17
Cycle
Triennial — held every third year (2019, 2022, 2025, then 2028)
Exhibitors
Around 3,200; the 2025 edition drew 3,259 from 66 countries
Visitors
About 168,660 attended in 2025, from 157 countries — a genuinely global floor
Scale
Roughly 177,000 m² of net exhibition space in 2025 — the whole venue
Organiser
Messe Düsseldorf GmbH
Registration
Exhibitor registration for K 2028 opens in early 2027 — spaces in the prime machinery halls are spoken for early

Why Exhibitors Choose SOL Germany for K

K is a process-services build before it is a design build. The thing that defines this floor is machinery that runs: injection moulding machines, extrusion lines, blow moulders and granulators making real parts in front of the visitor. A running machine does not just want a socket. It wants three-phase power at real amperage, it usually wants process cooling water and a return, most lines want compressed air, and all of it has to be positioned before the floor build starts. Get those orders right and on time and the stand works. Leave them until the design is signed off and the deadline has already passed — this is the single most common way a first K goes wrong, and it is the part we settle first.

There is also the weight. A commercial injection moulding machine or an extrusion line is measured in tonnes, not kilograms, and it arrives crated on a truck that needs a forklift or a crane to place it. We design the floor build and the access route to the machine's real crated weight and footprint, so the unit lands and is commissioned without the structure having to be reworked around it on site. Send us the machine list early — model, crated weight, dimensions, power draw, and whether it needs cooling water — because that list shapes the stand more than any styling decision you will make.

The build itself is domestic. The stand is fabricated and assembled on our own floor in Frankfurt, photographed for your approval, then driven roughly 230 kilometres to Düsseldorf. Road freight, no customs file, no border on the stand, and a crew who have worked the Düsseldorf halls before. Any machinery you import from outside the EU is a separate customs matter that stays with you and your forwarder, but the stand you commission from us never touches a border.

What you sign is one all-inclusive quote. There is no second invoice arriving three weeks after the show closes.

From Our Project Managers

What We've Learned Building on the K Floor

Practical notes from the SOL Germany team — the things the exhibitor manual does not spell out.

CD

The Machine Decides the Stand, Not the Other Way Around

On most shows the design comes first and the technical drawings follow. K is the show where that order is reversed. Everything — the plinth, the power run, the water route, the aisle a visitor uses to walk around the machine — is driven by the unit you are running. We ask for the machine list at briefing stage and design outward from it. A stand drawn first and fitted to a machine second is how a coolant line ends up crossing the aisle-facing corner, and once the floor build has started that hose cannot be moved.

Cooling Water and Compressed Air, Not Just a Socket

This is the K-specific one and it is the most expensive thing to get wrong. Many plastics processing machines need a process cooling water supply and a return, and a lot of lines need compressed air on top of the electrical feed. Venue water, waste and compressed-air connections are ordered separately from power, they are position-dependent, and their deadlines fall well before build-up. We settle the full services layout before the design is drawn and file the orders the day a contract is signed, because a service ordered late at K usually cannot be recovered at all.

Three-Phase Load Is the Critical Number

A stand of display cabinets draws what its lighting draws. A stand running an extrusion line or a moulding machine can draw an order of magnitude more, and it is almost always three-phase at 400 volts. The venue power order is the critical path here — the connected load in kilowatts, the number of phases, and the position of each supply. Get the machine's electrical specification to us early. It is the one figure that, if it arrives late, cannot be worked around by anyone, builder or organiser.

Multi-Tonne Machines Need a Route, a Crane Window and a Real Plinth

A packaged machine can weigh several tonnes and it does not go up the way display goods do. It is craned or forklifted into position, which means the access route has to stay clear until the unit is placed, and the crane or forklift window has to be booked against the venue's build-up schedule. We engineer the plinth to the machine's actual crated weight rather than a nominal figure, and we sequence the build so the structure goes up around a machine that is already standing where it needs to stand.

Triennial Means a Three-Year Stand, Not a One-Year Stand

K runs once every three years. The stand you commission carries your brand impression for three years, not one, and the message on the wall has to still be true when the next K comes round. That long gap changes the arithmetic in your favour if you build to reuse: the structure sits in our Frankfurt warehouse between editions and the next K costs a graphics refresh rather than a rebuild. It also means storage is a three-year commitment, so it is worth deciding at the outset whether you are buying a three-year asset or a single-edition build.

Eight Days Is a Long Show, and the Whole City Fills

K runs Wednesday to Wednesday — eight days, the longest German fair we build. High-traffic surfaces take more wear than they would over a three-day show, sample and giveaway stock has to be planned to last the week, and the crew works in rotation. And because K fills the entire fairground, Düsseldorf itself books out: hotels, crew accommodation and inbound freight slots go early. Three years out is not too early to hold the freight and accommodation window — it is exactly when the sensible exhibitors do it.

Transparent Pricing

What a K Stand Actually Costs

Pricing at K follows the machinery more than the styling. A stand running a live processing line — with cooling water, compressed air, a heavy plinth and a three-phase supply — costs more to engineer than the same floor area holding a display, and that is the honest driver behind the brackets below.

Essential — 9–18 m²

From €4,500
Best for: materials, additives, mould and component suppliers, and distributors attending K for the first time
  • Modular aluminium system frame
  • Backlit fabric back wall, full height
  • One branded reception counter
  • Standard LED top-rail lighting
  • Space to state your material, grade or process clearly
  • Graphics design and print (two revision rounds)
  • Frankfurt → Düsseldorf road freight
  • Installation, dismantling and organiser paperwork

Not included: process water and compressed-air connections, running-machine plinth, enclosed meeting room.

Premium — 50–100+ m²

From €34,000
Best for: full-range machine builders, exhibitors running several lines, brands treating K as their flagship for the three-year cycle
  • Architectural custom build, optional double-decker
  • Multiple enclosed meeting rooms
  • Heavy-load flooring engineered for packaged machinery
  • Several serviced machine positions with independent power, water and air
  • Hanging sign where the hall permits
  • Full AV package and live-demonstration stations
  • Technical back-of-house and storage
  • Priority workshop build slot

Not included: floor space rental, rigging fees, AV hire beyond the package, catering.

Recent Builds

Stands We Have Built

Stands delivered across German and European industrial and machinery trade fairs, including repeat builds at Messe Düsseldorf.

Watch

How a Stand Reaches the Hall

A Guide to K for First-Time Exhibitors

K is the world's leading trade fair for the plastics and rubber industry, and the 2028 edition runs 18–25 October at Messe Düsseldorf. It is held every third year — the last edition was in 2025 — and it is organised by Messe Düsseldorf GmbH. The 2025 edition drew 3,259 exhibitors from 66 countries and about 168,660 visitors from 157 countries across roughly 177,000 square metres, filling the entire fairground from Hall 1 to Hall 17.

Two facts shape how you plan a K stand before anything else. First, it is triennial: you get one K every three years, so the stand and its message have to hold up over a three-year gap. Second, it is the most machinery-heavy floor in the German calendar — the norm here is a live processing machine running on the stand, and that reality drives the engineering, the services and the budget far more than the visual design does.

Who Exhibits at K and What Visitors Want

The floor spans the whole plastics and rubber value chain: raw materials and compounds, additives and colourants, machinery for injection moulding, extrusion, blow moulding and thermoforming, moulds and tooling, measuring and control technology, recycling and circular-economy equipment, and semi-finished and technical parts. Exhibitors range from materials houses whose product is essentially a specification through to machine builders craning multi-tonne lines onto the floor.

The visitor is a processor, a converter, a product designer, a production engineer or a buyer — people who want to see the machine cycle, understand throughput and changeover, and ask what the part costs to make. That audience is hands-on and technical, and it is international: most exhibitors and visitors come from outside Germany, so the wall is being read in a second or third language. Short, concrete, technical English does more work here than clever German wordplay, and the themes that qualify a conversation fastest are the ones the whole industry is now built around — recyclability, material circularity, energy per part, and digital and automated production.

Stand Size: Choosing Between 9, 18, 24 and 48 Square Metres

Nine square metres works for materials, additives, mould and component suppliers whose product is physically small or is a specification rather than a machine. You get a counter, a back wall and standing conversations. What you cannot do at this size is run a machine with any circulation around it.

Eighteen square metres suits distributors and specialists who need a display and a proper conversation, and it is the largest size we would attempt without a serviced machine position.

Twenty-four is the threshold at which a running machine becomes practical: enough floor for the plinth, the power, water and air runs, and a route for visitors to walk around the machine rather than past it. If you intend to demonstrate anything that runs, treat 24 m² as the working minimum.

At 48 m² you can service two machine positions and still hold a private conversation, which matters when a processor wants to discuss a project rather than a product. From 80 m² upward a double-decker adds meeting capacity without consuming the ground-floor area that serviced machinery needs — and on this floor that ground-floor area is the constraint that decides everything.

What a K Stand Costs by Size

Ranges below are all-in for design, fabrication, graphics, domestic freight, install and dismantle. They exclude the floor space rental you pay to Messe Düsseldorf, and the electrical, water, compressed-air and waste orders placed with the venue.

  • 9 m² modular: €4,100–€8,700
  • 18 m² modular: €4,800–€10,100
  • 24 m² custom with one serviced machine position: €11,500–€15,000
  • 30 m² custom with enclosed meeting room: €15,000–€19,000
  • 48 m² custom with two serviced positions: €19,000–€26,000
  • 80 m² premium or double-decker: €34,000–€48,000

Common Mistakes, in Order of Frequency

The most common is designing the stand first and working out the water, air and power afterwards, which is how a coolant line ends up crossing the most visible corner of the floor. The second is quoting a nominal machine weight rather than the real crated one, so the plinth and the access route have to be reworked on site. The third is treating the three-phase power order as a formality when it is the critical path — a late load figure cannot be recovered by anyone. The fourth is writing the back wall in idiomatic German for a floor where most exhibitors and visitors are international. The fifth is buying a single-edition stand at a show that only comes round every three years, when a reusable frame would have carried two or three editions for the cost of a graphics refresh each time. All five are settled at design stage or not at all.

Getting Started

Send your stand size, your hall and stand number if Messe Düsseldorf has issued it, and — this is the one that matters most — your machine list: model, crated weight, dimensions, connected load in kilowatts, and whether it needs cooling water or compressed air. That list changes the design more than anything else you can tell us. You get a 3D design and an itemised all-in quote, at no charge and with no obligation.

Because K is triennial, a reusable system frame is a particularly sensible purchase for the many materials, additives and component suppliers who take a smaller stand here — the structure stays in our Frankfurt warehouse between editions and the next K costs a graphics refresh rather than a rebuild. Our modular exhibition stands are built for exactly that three-year pattern.

FAQ

K 2028 — Frequently Asked Questions

Real answers with real numbers. Click any question to expand.

When is the next K, and when is K 2028?

K is triennial — it runs once every three years. The next edition is K 2028, held 18–25 October 2028 at Messe Düsseldorf. The previous edition was in 2025, and the one after 2028 is expected in 2031. Because the gap is three years, planning tends to start earlier than for an annual show.

Where is K held?

K takes over the entire Düsseldorf fairground — Messe Düsseldorf, Halls 1 to 17. It is organised by Messe Düsseldorf GmbH. The 2025 edition used roughly 177,000 square metres of net exhibition space across the whole venue.

How much does a K stand cost?

From €4,500 to around €48,000 depending on size and services. A modular 18 m² sits in the €4,800–€10,100 range. A 24 m² custom stand with one serviced machine position is typically €11,500–€15,000. A 48 m² with two serviced positions runs €19,000–€26,000. Premium and double-decker builds from 80 m² start around €34,000. A live processing machine sits toward the upper end of its bracket because of the services it needs.

What is not included in the price?

Three things. The floor space rental, which is between you and Messe Düsseldorf. The electrical, water, compressed-air and waste orders placed with the venue. And specialty add-ons — AV beyond the listed package, furniture beyond the standard set, catering, and staffing during the show.

Can the stand support a running injection moulding machine or extrusion line?

Yes, and it is the normal case at K. We engineer the plinth for the machine's real crated weight, design the process cooling water, return and compressed air into the floor build, and plan the access route and crane or forklift window so the machine is positioned before the structure closes around it.

Do I need a water connection?

If you are running a machine that needs process cooling, almost certainly yes — a supply and a return. It is ordered separately from the power feed, it is position-dependent, and the deadline falls well before build-up. Tell us at briefing stage and we specify and file it alongside the power and compressed-air orders.

What about compressed air and three-phase power?

Most processing lines need compressed air, and nearly all run on three-phase 400-volt power at a load far higher than display lighting. Both are ordered from the venue and both are position-dependent. The connected load in kilowatts is the single figure we need earliest, because it is the one thing that cannot be worked around if it arrives late.

Is there customs to pay on the stand?

No. Düsseldorf is domestic for us. We build in Frankfurt and drive roughly 230 kilometres, so there is no customs file and no border on the stand itself. Machinery you import from outside the EU is a separate matter handled by you and your forwarder.

Which hall will I be in?

Hall and stand allocation is set by Messe Düsseldorf and follows the material or machinery category you exhibit in. K uses the full fairground, Halls 1 to 17. We design to your issued stand number and the current hall plan, not to where a category sat at a previous edition.

Do you handle the organiser paperwork?

Yes — electrical, water, compressed-air and waste orders, rigging permissions, the crane or forklift booking, waste removal, daily cleaning and crew passes. We file on the day a contract is signed, because the services deadlines fall well before build-up and, at K, a service ordered late usually cannot be recovered at all.

How long does install take?

A modular 9–18 m² stand goes up in one shift. A 24–48 m² custom stand with a serviced machine takes one to two days plus commissioning time for the unit. Premium builds use the full build-up window. Every stand is pre-assembled at our workshop first, so the on-site days are assembly and machine commissioning, not first-time construction.

When do I need to lock the design?

For a mid-October show, the styling can be settled into the summer — but the services orders and the machine list bind much earlier than the design does. If your stand runs a machine, we need the machine specification well before the design is final, because the water, air and power orders cannot wait for a styling decision.

K only happens every three years. Does that change what I should buy?

It changes the arithmetic. A custom build is amortised across a three-year gap rather than an annual one, which often justifies a better stand. It also means storage between editions is a three-year commitment, so it is worth deciding at the outset whether you want a reusable system frame that carries several editions or a single-edition build.

Can I reuse the stand at the next K?

Yes, if it is built on a system frame. We store the structure in Frankfurt and refresh the graphics for the next edition. Over a three-year gap the messaging almost always needs updating anyway — material and sustainability claims move faster than the stand does — so a graphics refresh is usually wanted regardless.

Can you handle a rush build?

Usually, for the structure. What cannot be rushed is the venue services order — water, compressed air and power have fixed deadlines and no builder can move them. At K that is the single reason to start earlier than you would for an ordinary show, especially if a machine is involved.

Can I visit during pre-build?

Yes, and we encourage it, particularly where a machine is involved. The workshop is about fifteen minutes from Frankfurt Airport. You see the stand assembled, check the plinth and the service positions against your machine's real dimensions, and meet the crew before anything ships.

What graphics files do you need?

Vector files for logos and certification marks, and high-resolution raster images at roughly 150 dpi at final print size. Given the international audience, send us the technical copy in English as well as German if you have both.

How many staff should I plan for?

On 18 m², two to three. On 24 m² with a running machine, three to four — someone needs to stay with the machine while another person works the aisle. At 48 m² and above, five or more. Processors ask detailed questions about cycle, throughput and part cost, and those conversations run longer than a typical trade fair exchange.

Do you build at the other Düsseldorf shows?

Yes — Aluminium, ProWein, Interpack, wire and Tube among them. Same crew, same road from Frankfurt. If you exhibit at more than one Düsseldorf fair in a cycle we plan them together, which usually saves on both freight and design.

How do I start?

Send your stand size, your hall position if you have it, and your machine list including power, water and air needs. You get a 3D design and a full itemised quote back, at no charge.

Ready to Exhibit

Get Your K Stand Design in 48 Hours

Free 3D rendering before contract. One all-inclusive quote with no hidden line items, domestic freight and no customs — with the machine plinth, process water, compressed air and three-phase load planned before the design is drawn.

48hrFree 3D Design
€4,500+All-Inclusive
28 daysTo Show Floor
4.9Trustpilot4.9Google
WhatsApp us
WhatsApp us
Live now