Skip to content
Tech Show Frankfurt 2027
SOL Germany · Frankfurt

Exhibition Stand Builder for Tech Show Frankfurt 2027

Stands for Hall 3 at Messe Frankfurt, 19–20 May 2027 — designed, built and dry-assembled in our own workshop on Hanauer Landstraße, then driven six kilometres to the hall. Two open days and one hall change the arithmetic of what is worth building, and we plan for that from the first sketch.

€4,500+From
500+Stands
15 YrsEurope
4.9Trustpilot4.9Google
Browse Designs
SOL Germany exhibition stand for a technology exhibitor at Messe Frankfurt
19–20 MAY 2027
Frankfurt, Germany
19–20 May 2027Show Dates
Hall 3, Messe FrankfurtVenue
AnnualCycle
330+ across four zonesExhibitors
CloserStill MediaOrganiser
8,000+ across four zonesVisitors
Event Overview

Tech Show Frankfurt 2027 — Everything You Need to Know

Tech Show Frankfurt is not one exhibition but four running side by side in a single hall, under one ticket and one exhibitor booking. That structure explains both the published figures and the way the floor behaves — and it is the thing most exhibitors get wrong when they size a stand.

Tech Show Frankfurt 2027 — At a Glance

Dates
19–20 May 2027, Wednesday and Thursday — two open days
Opening hours
09:00–17:00 on the Wednesday, 09:00–16:00 on the Thursday
Venue
Hall 3, Messe Frankfurt
Organiser
CloserStill Media
Structure
Four co-located zones — Cloud & AI Infrastructure, Cloud & Cyber Security Expo, Big Data & AI World, Data Centre World
Cycle
Annual, but the slot moves: the 2026 edition ran 6–7 May, the 2027 edition runs 19–20 May
Scale
The organiser reports 330+ exhibitors and partners, 8,000+ attendees and 130+ conference sessions from the 2026 edition — figures that cover all four zones together, not any one of them
Audience
Enterprise IT, cloud, security, data and digital-infrastructure buyers from the DACH region

Why Exhibitors Choose SOL Germany for Tech Show Frankfurt

Two open days is the single fact that should drive every decision about this stand. The floor is live for roughly fifteen hours in total, and the build and dismantle either side of it are compressed to match. A structure that takes a day and a half to assemble and half a day to strip has spent more crew time being born and buried than it has spent working. So we push exhibitors here towards reusable system frames with fast graphics changes rather than bespoke joinery — not because it is cheaper on the invoice, though it usually is, but because the ratio makes sense.

Our workshop is on Hanauer Landstraße, about six kilometres from the Messe Frankfurt gates. On a four-day show that proximity is a convenience. On a two-day show it is the economics. There is no overnight freight leg, no crew accommodation, no staging warehouse near the venue, and a part that turns out to be wrong at 07:00 on build day is a twenty-minute round trip rather than a re-manufacture. We dry-assemble the whole structure on our own floor first and photograph it for your approval, so the hall is where we install rather than where we discover things.

The last piece is the zone question. You book into one of four zones, but all four sit in the same hall and share one visitor flow, so the choice is really about who stands next to you and which conference theatre pulls traffic past your corner. We ask which zone before we draw, because the answer changes which side of the stand faces the aisle that matters.

What you sign is one quote. There is no second invoice arriving three weeks after the show closes.

From Our Project Managers

What We Have Learned Building at Messe Frankfurt

Six operational notes on a two-day show in a single hall — the detail that does not appear on an organiser page.

CD

Two Open Days Is a Design Constraint, Not a Detail

This is the note specific to this show. Fifteen hours of open floor is not much time to earn back a structure, and the build window either side is tight because everyone in the hall is working to the same clock. What survives that maths is a system frame that goes up in hours, graphics that clip rather than bond, and lighting that is pre-wired into the frame rather than commissioned on site. What does not survive it is bespoke joinery, anything requiring a curing or drying stage, and any finish that needs a second visit to correct. We will say so at quoting stage rather than after.

One Hall Means One Clock for Everybody

Multi-hall shows spread the build load across separate goods routes and separate crews. Hall 3 does not. Every exhibitor loads through the same doors in the same window, the aisles fill with crates and forklifts, and a slot missed by an hour is not an hour lost — it is a place at the back of a queue that does not move. We book the earliest workable slot we can get, arrive with the structure already assembled once, and keep the on-floor task list short enough that a delayed delivery does not cascade.

Plan the Network, Not Just the Power

This audience will ask to see something running. Demonstration racks, live dashboards, multi-screen walls and cloud consoles all need a connection that holds up, and venue wireless with eight thousand people on it is not that connection. A wired drop has to be ordered from the venue in advance, terminated somewhere sensible on the stand, and routed so nobody is running an ethernet cable across a gangway on the morning. We design the cable path and the rack position at the same time as the walls, because retro-fitting either one means moving the other.

Everyone Dismantles at the Same Minute

The floor closes at 16:00 on the Thursday and the entire hall wants out at once. Crews that turn up at 16:00 to start planning their exit spend the evening waiting for a forklift. Ours arrive before close with the packing sequence already decided, the crates staged, and the graphics-removal order agreed — and because the warehouse is six kilometres away we can run more than one load rather than fighting for a single large vehicle slot.

The Zone You Pick Is an Adjacency Decision

Cloud & AI Infrastructure, Cloud & Cyber Security Expo, Big Data & AI World and Data Centre World are neighbourhoods on one floor, not separate events. Nobody buys four tickets. So picking a zone does not narrow who can reach you — it decides which exhibitors flank you and which conference theatre empties past your stand between sessions. Ask the organiser where the theatres sit before you accept a space, and if you sell into more than one zone, take the boundary rather than the middle.

Two-Day Shows Reward Seats Over Spectacle

The organiser runs a meeting platform and reports a substantial number of pre-arranged meetings, which tells you how this floor is actually used: people arrive with a diary rather than a wander. That argues for more seated positions per square metre than a walk-up consumer-facing show would need, a screen that supports a conversation rather than broadcasting at the aisle, and somewhere to put a laptop down. We would rather give you two more usable seats than a taller header.

Transparent Pricing

Tech Show Frankfurt 2027 Stand Pricing

Real ranges, in euros, for a stand delivered into Hall 3 and taken away again afterwards. Two-day shows sit at the lower end of comparable size bands because the build is designed to be fast rather than permanent — and where a stand does cost more here, it is almost always the demonstration equipment and the connectivity rather than the structure.

Essential — 9–18 m²

From €4,500
Best for: software vendors, managed-service providers, consultancies and first-time exhibitors testing the DACH market
  • Modular aluminium system frame, reusable across editions
  • Full-height printed or backlit fabric wall
  • One branded counter and a lockable store
  • Pre-wired LED lighting in the frame
  • Single-phase power and one screen position
  • Graphics design and print, two revision rounds
  • Six-kilometre delivery from our Frankfurt workshop
  • Installation, dismantling and organiser paperwork

Not included: floor space, venue-ordered services, wired network drop, demonstration hardware.

Premium — 60–100 m²+

From €34,000
Best for: platform vendors and hyperscaler partners taking an anchor position, and exhibitors hosting their own theatre
  • Bespoke architecture with a double-deck option where the hall allows
  • Dedicated demonstration theatre or briefing rooms
  • Reinforced rack bays with managed power distribution
  • Integrated AV, screen walls and audio zoning
  • Hospitality area and stand storage designed in
  • Static calculations and organiser approvals handled
  • Full project management, supervision and post-show storage

Not included: floor space, rigging and venue services, catering, network subscription, hardware.

Recent Builds

Stands We Have Built

Recent stands from our Frankfurt workshop, delivered across German and European venues.

A Practical Guide to Exhibiting at Tech Show Frankfurt

Tech Show Frankfurt 2027 runs on Wednesday 19 and Thursday 20 May 2027 in Hall 3 at Messe Frankfurt. Doors open at 09:00 on both days and close at 17:00 on the Wednesday and 16:00 on the Thursday. It is organised by CloserStill Media, which runs the same format in London, Madrid, Paris and Singapore, and it positions itself as the DACH region's meeting point for enterprise technology buyers.

The first thing to fix in your head is that this is a two-day show in one hall. Almost every planning assumption carried over from a Formnext or a Messe Frankfurt flagship — four or five build days, multiple halls, a crew hotel, freight arriving the week before — is wrong here, and expensively so. The second thing is that the show is really four shows sharing a floor, which changes what the published numbers mean.

Four Zones, One Floor — and What the Numbers Actually Describe

The event covers Cloud & AI Infrastructure, Cloud & Cyber Security Expo, Big Data & AI World and Data Centre World. These are co-located zones, not separate exhibitions: one hall, one ticket, one exhibitor booking, one visitor flow. A visitor who registers for the data-centre content walks past the security stands on the way in, and vice versa.

That structure is why the headline figures need reading carefully. The organiser reports more than 330 exhibitors and partners, more than 8,000 attendees and more than 130 conference sessions from the 2026 edition, together with over 1,850 meetings arranged through its Connect platform. Every one of those totals covers all four zones combined. Divide by four and the picture changes: roughly eighty exhibitors in your zone, and a proportionate share of the floor. Sizing a stand as though 330 competitors are in your category, or as though 8,000 people are shopping for what you sell, produces a stand that is either too defensive or too big. We have seen the same trap at FACHPACK, where a combined gate figure gets quoted as one show's, and at Intersolar, where alliance-wide totals get attributed to a single exhibition.

The Date Moves — Do Not Plan From Last Year

The 2026 edition ran on 6 and 7 May. The 2027 edition runs on 19 and 20 May, roughly a fortnight later in the month. That looks harmless until you work backwards: every organiser and venue deadline moves with the show, and anyone copying last year's internal calendar will be planning against dates that no longer line up with anything.

Work backwards from 19 May 2027 rather than forwards from a remembered date. Space application and zone selection come first, then design sign-off, then the venue services order — electrical supply, wired network, rigging if you need it — then graphics to print, then the freight and build slot. On a two-day show the graphics deadline is the one that catches people, because there is no slack in the schedule to reprint a panel that arrives with the wrong product name on it.

What a Technology Stand at This Show Has to Carry

The audience here is technical and will ask to see something working. That means demonstration hardware, live dashboards, screen walls and cloud consoles — and it means the two services that actually matter are power and network, in that order of cost and reverse order of attention. Power is straightforward and everyone remembers it. The network drop is the one that gets forgotten until the week before, and venue wireless shared with several thousand attendees will not carry a live demonstration.

Design the stand around those two runs before you decide where the walls go. A rack position needs a cable route to a fixed point, and that point is set by the venue floor plan rather than by your design. Screens need to be reachable for a reboot, which sounds obvious until a screen is bonded into a wall two and a half metres up. And every demonstration position needs somewhere for a visitor to stand that is not the gangway, because a crowd of four people watching a demo will block an aisle in a hall this size.

Build, Dismantle, and Why One Hall Behaves Differently

In a single-hall show every exhibitor shares one set of goods doors and one build window. The consequence is queueing, and the queue does not reward optimism. We assemble the entire structure once at our workshop, photograph it for approval, dismantle it into a known packing order and arrive at the hall with a short on-floor task list. The aim is that nothing needs to be worked out in the hall, because the hall is the worst place to work anything out.

Dismantle is the mirror image and it is worse, because it happens at a fixed minute rather than across a window. The floor closes at 16:00 on the Thursday and several hundred exhibitors want a forklift simultaneously. Crews that begin planning at 16:00 finish late in the evening. Ours arrive before close with the sequence agreed and the crates staged, and being six kilometres from the hall means we can run two smaller loads rather than waiting for one large vehicle slot to come free.

Building From Frankfurt, Showing in Frankfurt

Our workshop sits on Hanauer Landstraße, roughly six kilometres from the Messe Frankfurt gates. There is no border on this journey, no customs file, no temporary-import paperwork, no overnight freight leg and no crew accommodation. For a two-day show those absences are not a minor saving — they are a meaningful share of what a stand costs, and they are why a Frankfurt build can put more of the budget into the visible stand than into moving it.

It also changes what happens when something goes wrong, which on a live build it occasionally does. A damaged panel, a graphic with a typo caught at the last approval, a counter that needs an extra shelf: all of these are a short drive rather than a phone call to a warehouse in another city. On a show with a fifteen-hour open window, the difference between fixing something in an hour and fixing it overnight is the difference between a full show and most of one.

Because Tech Show Frankfurt runs annually and rewards a fast build, a reusable system frame pays for itself here more quickly than almost anywhere else we work — the structure lives in our Frankfurt warehouse between editions, and the following year costs a graphics refresh and a six-kilometre delivery rather than a rebuild. Our modular exhibition stands are built for exactly this pattern.

FAQ

Tech Show Frankfurt 2027 — Questions and Answers

Real answers with real numbers. Click any question to expand.

When and where is Tech Show Frankfurt 2027?

Tech Show Frankfurt 2027 takes place on Wednesday 19 and Thursday 20 May 2027 in Hall 3 at Messe Frankfurt. The floor opens at 09:00 on both days, closing at 17:00 on the Wednesday and 16:00 on the Thursday.

Is Tech Show Frankfurt one exhibition or several?

Both, depending on how you look at it. It is a single event with one ticket and one exhibitor booking, and within it four co-located zones: Cloud & AI Infrastructure, Cloud & Cyber Security Expo, Big Data & AI World and Data Centre World. They share the hall and the visitor flow, so the zone you book decides your neighbours rather than your audience.

Is Data Centre World a separate show I need a second stand for?

No. Data Centre World is one of the four zones inside Tech Show Frankfurt, in the same hall on the same two days. One booking covers it. If you are looking at a Data Centre World listing and a Tech Show Frankfurt listing and wondering which to exhibit at, they are the same floor.

How big is the show really?

The organiser reports more than 330 exhibitors and partners and more than 8,000 attendees from the 2026 edition. Read those as totals across all four zones together — that works out at roughly eighty exhibitors per zone. It is a focused regional event rather than a European flagship, and planning it as though it were the latter is the most common and most expensive mistake we see.

Why does two days matter so much for stand design?

Because the floor is only live for about fifteen hours, and the build and dismantle either side are compressed to match. A structure that takes a day and a half to erect has spent more crew time being assembled than being used. Our recommendation here is nearly always a reusable system frame with fast-fit graphics rather than bespoke joinery — it goes up in hours, comes down in hours, and the frame is still yours next year.

What does a stand at Tech Show Frankfurt cost?

A 9 m² modular stand runs €4,100 to €8,700 and an 18 m² stand €4,800 to €10,100, both all-inclusive of design, build, delivery, installation and dismantling. A 24 m² custom stand with a demonstration rack position sits around €11,500 to €15,000, and a 48 m² custom build with structured cabling and two demonstration positions €19,000 to €26,000. Floor space, venue services and your network drop are separate.

Should we exhibit here or at it-sa in Nuremberg?

If security is your entire business, it-sa is a dedicated security event and will out-reach this one within that audience. Tech Show Frankfurt's Cloud & Cyber Security Expo is one of four zones on a two-day floor, which suits a vendor whose buyers also sit in cloud, data or infrastructure — you reach across those conversations rather than into one deeply. Some of our clients do both and treat Frankfurt as the meeting-led event and Nuremberg as the category one. We would rather say that than sell you a stand at the wrong show.

How does this compare with Embedded World or ISE?

Different audiences. Embedded World in Nuremberg is embedded hardware and engineering, and ISE is professional AV and systems integration. Tech Show Frankfurt is enterprise IT: cloud, security, data platforms and digital infrastructure buyers, largely from the DACH region. If your product sells to a CIO or a head of infrastructure rather than to an engineer or an integrator, this is the closer fit.

Do you handle the network connection for demonstrations?

We design the cable path, the rack position and the termination point into the stand, and we install to it. The connection itself is ordered from the venue against a deadline that sits well before build day, and we will tell you what to order and when. Do not plan a live demonstration on venue wireless shared with several thousand visitors — that is the single most common technical failure we see at shows of this type.

How far in advance should we start?

Twelve weeks before the show is comfortable for a custom build and eight weeks is workable for a modular one. Work backwards from 19 May 2027 rather than from last year's dates, because the 2027 edition sits about a fortnight later in May than the 2026 one did. If you are inside eight weeks, tell us — we can often still build it, but the options narrow to what our workshop already holds.

Where do you build the stand?

In our own workshop on Hanauer Landstraße in Frankfurt, roughly six kilometres from the Messe Frankfurt gates. The whole structure is assembled and inspected there first and photographed for your approval before it is packed. Nothing arrives at the hall having never been put together.

What does the price actually include?

Design including a free 3D visual before you commit, construction and inspection at our workshop, graphics design and print, delivery to the hall, installation, the organiser paperwork, dismantling, removal and a project manager who is on site. One quote, one invoice.

What is not included?

Floor space from the organiser, services ordered directly from Messe Frankfurt such as electrical supply and the network drop, rigging where a design needs it, catering, your demonstration hardware, and your team's travel and accommodation. We list these on the quote rather than leaving them to be discovered.

Can we reuse the stand at another show?

Yes, and on a two-day show that is much of the point. A modular system frame is built to come apart and go back together, and we store it in our Frankfurt warehouse between events. Reusing it at the next edition or at another European show typically costs a graphics refresh, freight and installation rather than a new build.

Do you offer a shell-scheme upgrade?

We do not sell shell scheme — that comes from the organiser where it is offered. What we do is build into a shell-scheme space or, more often, build a freestanding stand instead. If you already hold a shell package and want it made to look like something, tell us the dimensions and what the package includes and we will quote the upgrade.

Which zone should we book?

Start from who you sell to rather than from what you make. If your buyer is a security lead, the Cloud & Cyber Security Expo zone; an infrastructure or platform lead, Cloud & AI Infrastructure; a data or analytics lead, Big Data & AI World; a facilities or capacity lead, Data Centre World. If you genuinely sell across two, ask for a space on the boundary between them rather than in the middle of one.

Do you have crew on site during the show?

Yes. A supervisor is on the floor through build, and we stay reachable across both show days for anything that needs attention — a light, a screen, a graphic that has taken a knock. Being six kilometres away means we can bring a replacement part rather than describe a workaround over the phone.

Do you build double-decker stands for this hall?

We build them regularly, though whether one is permitted depends on the hall's height and structural rules and on organiser approval, which needs static calculations submitted well in advance. On a two-day show a second storey also has to earn its assembly time. Ask us early and we will tell you honestly whether it is worth it at your space size.

Can you work in German, French and Spanish?

Yes. Project management, drawings and site coordination run in English or German as you prefer, and we work with French- and Spanish-speaking exhibitors across our European projects. Graphics are produced in whichever languages your stand needs.

How do we start?

Send the zone, the stand size and dimensions, whether you have the floor plan yet, and what has to run on the stand — racks, screens, a meeting area, anything that needs power or a network connection. You will have a 3D design within about 48 hours and a single all-inclusive price alongside it.

Ready to Exhibit

Let's plan your Tech Show Frankfurt stand

Send us the zone, the space and what has to run on the stand. You will have a 3D design within 48 hours and a single all-inclusive price — no second invoice after the show closes.

48hrFree 3D Design
€4,500+All-Inclusive
28 daysTo Show Floor
4.9Trustpilot4.9Google
WhatsApp us
WhatsApp us
Live now