Skip to content
Tech For Industry Show 2027
SOL Germany · Paris

Industry 4.0 Stand Builder for Tech For Industry Show in Paris

Stands for Paris Expo Porte de Versailles, 19–20 May 2027 — built and pre-assembled in our Frankfurt workshop, then driven to Paris by our own crew. Designed around what a factory-technology stand actually runs on: a connection that does not drop, screens that read under hall light, and a demonstration cell that passes inspection.

€4,500+From
500+Stands
15 YrsEurope
4.9Trustpilot4.9Google
Browse Designs
Tech For Industry Show stand builder — SOL Germany stand for an industrial automation exhibitor at Paris Expo Porte de Versailles
19–20 MAY 2027
Paris, France
19–20 May 2027Show Dates
Porte de VersaillesVenue
AnnualCycle
2nd editionStatus
Two daysDuration
FranceCountry
Event Overview

Tech For Industry Show 2027 — Everything You Need to Know

A two-day Paris trade fair for Industry 4.0 — automation, industrial AI, robotics, industrial IoT, digital twins, industrial cloud and cybersecurity, and the digital supply chain. It opened for the first time in June 2026 and returns for its second edition in May 2027, a month earlier in the calendar.

Tech For Industry Show 2027 — At a Glance

Dates
19–20 May 2027, Wednesday and Thursday — two show days, not three
Venue
Paris Expo Porte de Versailles. The 2026 edition was staged in Hall 5.2
Cycle
Annual, but the slot moved: June in 2026, May in 2027
Status
Second edition. The first was held 23–24 June 2026
First edition
3,900 visitors from 953 industrial companies and 97 exhibitors, 23 of them start-ups
Programme
60 conference sessions and more than 140 speakers across the two days in 2026
Audience
Industrial directors, plant and operations managers, CIOs, innovation and R&D leads
Getting there
Métro line 12 to Porte de Versailles; trams T2 and T3a; buses 39 and 80

Why Exhibitors Choose SOL Germany for Tech For Industry Show

Two show days changes the arithmetic before it changes anything else. A stand that would be sensible across a five-day fair has to earn its cost here in about sixteen open hours, which pushes the honest answer for most exhibitors towards a reusable system frame rather than a one-off custom build. We will tell you when your brief is bigger than the show warrants — that conversation is cheaper before the design than after the invoice.

The second thing that separates this floor from a machinery fair is that the product is frequently intangible. A dashboard, a digital twin, a scheduling engine or a vision model has to be shown running, and running means a connection. Hall wireless carries badge scanners and phones; it does not reliably carry a live demonstration with a hundred exhibitors doing the same thing in the same volume of air. We plan a wired line, a local fallback and a recorded cut of the demonstration as three separate layers, and we order the line at the same time as the power.

Everything is built and assembled on our own floor in Frankfurt, photographed for your approval, then driven to Paris — roughly 570 kilometres, inside the EU, no customs file and no border on the stand itself. The crew that assembles it in the workshop is the crew that installs it in the hall, which matters more than usual when the build-up window is short.

What you sign is one quote. There is no second invoice arriving three weeks after the show closes.

From Our Project Managers

What We've Learned Building Factory-Technology Stands in Paris

Practical notes from the SOL Germany team — the things the exhibitor manual does not tell you.

CD

Two Days Is the Number That Governs the Budget

This show opens Wednesday and closes Thursday. Sixteen or so hours of floor time is the whole return, and a build that takes two days to install for two days of trading has a poor ratio no matter how good it looks. The sensible pattern here is a system frame you own and reuse — the structure goes back into our Frankfurt warehouse and the next outing costs a graphics refresh rather than a rebuild. Commit to a full bespoke build only if you are also taking it to a second and third show in the same year.

Whit Monday Falls Two Days Before the Doors Open

In 2027, lundi de Pentecôte is 17 May and the show opens on the 19th. The week before your build-up is a short week in France, and it comes after a May that has already lost Ascension Thursday on the 6th and the bridge Friday most firms take after it. Hauliers, crews and venue services all compress into the remaining days. We book freight and beds for this show in February, not April, and the design has to be locked correspondingly earlier — not because we are cautious, but because the calendar simply has fewer working days in it than it looks.

The Network Is the Risk, Not the Power

Almost nobody loses a stand to electricity here. They lose the demonstration to connectivity. Order a wired connection from the venue as a formal service, exactly as you order power, and treat hall wireless as unusable for anything you intend to show a buyer. Then build two fallbacks: the demonstration running against a local instance on a machine under the counter, and a clean screen recording of the same flow. Nobody has ever regretted the recording.

A Robot Cell Is a Safety Case Before It Is a Display

If you are bringing a cobot, an AGV or anything with a moving axis, the reach envelope, the guarding, the floor fixing and the emergency stop have to be resolved at design stage and submitted, not improvised in the hall. Aisle-side motion also needs a standing operator, because visitors will walk into the envelope to look at the gripper. Send us the cell's footprint, its declared safety distances and its anchoring requirement with the brief; it changes the floor build and sometimes the stand shape.

Screens Read Badly Under Hall Light, and This Floor Is Mostly Screens

Overhead hall lighting is bright, cool and directly above — the worst possible angle for a glossy panel. Matte finish, a screen tilted a few degrees down rather than dead vertical, and a shading element above it will do more for legibility than another five hundred lumens of stand lighting. Plan two tiers of screen: one large one legible from the aisle showing a single idea, and a small one at the table where the real conversation happens. Three mid-sized screens all showing different things is the most common wasted spend on this floor.

A Hundred-Exhibitor Floor Means Everybody Sees Everybody

The first edition ran with 97 exhibitors. At that scale a visitor plausibly walks the entire show, which cuts both ways: you do not need to shout to be found, but there is nowhere for an average stand to hide either. It also means position is worth negotiating while the plan is still fluid — on a young show the floorplan is far less settled than at an established fair, and asking early costs nothing.

Transparent Pricing

What a Stand at This Show Actually Costs

Two show days push most briefs down a tier rather than up one. The brackets below are the same rate card we quote across our European shows; what changes here is which tier we would actually recommend, and we say so rather than quoting the biggest thing you will accept.

Essential — 9–18 m²

From €4,500
Best for: software vendors, start-ups, sensor and component suppliers, and anyone exhibiting here for the first time
  • Modular aluminium system frame, owned and reusable
  • Backlit fabric back wall, full height
  • One branded counter with a lockable base
  • One large screen mounted at aisle-reading height
  • Cable management for a wired demonstration line
  • Graphics design and print (two revision rounds)
  • Frankfurt → Paris road freight, no customs file
  • Installation, dismantling and organiser paperwork

Not included: venue connectivity and power orders, floor space rental, furniture beyond the listed items.

Premium — 50–100+ m²

From €34,000
Best for: industrial groups and platform vendors treating the Paris floor as a flagship appearance
  • Architectural custom build, optional double-decker
  • Multiple enclosed meeting rooms
  • Several independent demonstration positions with separate supplies
  • Heavy-load flooring where a cell or machine requires it
  • Hanging sign where the hall permits
  • Full AV package and presentation area
  • Technical back-of-house and storage
  • Priority workshop build slot

Not included: floor space rental, rigging fees, AV hire beyond the package, catering, staffing.

Recent Builds

Stands We Have Built

Stands delivered across European technology and engineering trade fairs, including repeat builds in Paris.

A Guide to Tech For Industry Show for First-Time Exhibitors

Tech For Industry Show is a French trade fair for Industry 4.0 — the technologies that sit between the factory floor and the enterprise system. Automation and robotics, industrial AI and analytics, industrial IoT, digital twins and simulation, industrial cloud and cybersecurity, and the digital supply chain. The second edition runs 19–20 May 2027 at Paris Expo Porte de Versailles.

The inaugural edition was held 23–24 June 2026 in Hall 5.2 and closed with 3,900 visitors representing 953 industrial companies, 97 exhibitors of which 23 were start-ups, and 60 conference sessions delivered by more than 140 speakers. Two awards, an Innovation Award and a Startup Award, were presented for the first time. Note the slot has moved: the second edition sits in May rather than June, so every deadline you might carry over from last year's diary lands roughly five weeks earlier.

Exhibiting at a Second-Edition Show

A young show is a different commercial proposition from an established one, and it is worth being clear-eyed about the trade. What you give up is certainty — you cannot look up three years of visitor data, you do not know who your neighbours will be, and a first edition's numbers are one data point rather than a trend. What you get in exchange is a floor small enough to be walked completely, a visitor who has come deliberately rather than out of habit, and a position on the plan that is still negotiable.

The practical consequence is that the right stand here is usually smaller and better rather than bigger. On a floor of around a hundred exhibitors, a well-lit 18 square metres with one demonstration that actually works will be seen by more or less everyone who attends. The same budget spent on 48 square metres of unfilled space and three screens showing three different things converts worse and costs more to install.

It also means you should ask questions an established show would not tolerate. Ask the organiser what the floorplan looks like today rather than accepting the first offered position. Ask which conference sessions sit nearest your aisle, because on a two-day show the programme is what moves the crowd. None of this is unusual on a young event; it is simply less available later.

Who Exhibits and What the Visitor Is Actually Doing

The exhibitor base spans industrial software and MES vendors, automation and robotics suppliers, integrators and consultancies, IIoT and sensor manufacturers, industrial cloud and cybersecurity firms, and a substantial start-up contingent — nearly a quarter of the first edition. The visitor profile is senior and cross-sector: industrial and plant directors, operations and production managers, CIOs and IT-OT leads, innovation and R&D managers, drawn from aerospace and defence, automotive, energy, food and drink, chemicals, pharmaceuticals, construction and logistics.

What that visitor is doing is scoping a project, not filling a trolley. The 3,900 attendees at the first edition came from 953 companies, which is roughly four people per firm — buying groups walking the floor together rather than individuals collecting brochures. That has a direct design consequence: you need somewhere for four people to stand around one screen, and ideally somewhere for three of them to sit down. Counting seats is a more useful sizing exercise here than counting square metres.

It also changes what belongs on the wall. A procurement team is trying to establish, quickly, what you integrate with, what it costs to run, and who else in their sector already uses it. Naming the protocols and systems you connect to, in readable type, does more qualifying work from the aisle than any slogan.

Stand Size: 9, 18, 24 and 48 Square Metres on a Two-Day Show

Nine square metres is a serious option here rather than a fallback, particularly for start-ups and single-product software vendors. You get a counter, a back wall and one screen. What you cannot do is seat anybody, so it works if your demonstration takes ninety seconds and your follow-up happens by email.

Eighteen is where most first-time exhibitors at this show should land. It carries a proper demonstration position, an aisle-legible screen and a table with two or three seats — enough for the buying group described above without paying for floor you will not fill on a two-day run.

Twenty-four is the threshold at which a physical demonstration cell becomes comfortable: a cobot or an AGV needs its reach envelope, its guarding and a route for visitors to stand outside it rather than in it. If you are bringing anything that moves, treat 24 square metres as the working minimum and send us the cell drawings before the stand design starts.

At 48 you can run two independent demonstrations and still hold a private conversation behind an acoustic panel, which is the size most integrators and platform vendors want. Beyond that, ask honestly whether a two-day appearance justifies it, or whether the same structure should be bought once and taken to three shows.

What a Stand Costs by Size

Ranges below are all-in for design, fabrication, graphics, road freight from Frankfurt, installation and dismantling. They exclude the floor space rental you pay the organiser, and the network, electrical and rigging orders placed with the venue.

  • 9 m² modular: €4,100–€8,700
  • 18 m² modular with a screen and a seated corner: €4,800–€10,100
  • 24 m² custom with one demonstration cell position: €11,500–€15,000
  • 30 m² custom with an enclosed meeting room: €15,000–€19,000
  • 48 m² custom with two demonstration positions: €19,000–€26,000
  • 80 m² premium or double-decker: €34,000–€48,000

Common Mistakes, in Order of Frequency

The most common is trusting hall wireless with a live demonstration, which produces the single worst moment of a trade fair: a buyer standing in front of a loading spinner. The second is planning the build calendar from an ordinary May, when in 2027 the French calendar loses Ascension Thursday on the 6th, the bridge day after it, and Whit Monday on the 17th — two days before the show opens. The third is bringing a robot cell without its safety documentation and anchoring requirement, which is discovered at the worst possible time. The fourth is over-sizing: buying floor area appropriate to a five-day fair for a two-day one. The fifth is three mid-sized screens showing three different things, none of which reads from the aisle. All five are settled at design stage or not at all.

Getting Started

Send your stand size, your hall and stand number once the organiser has issued it, and a description of what you intend to demonstrate — software on a screen, a physical cell, or both. If a robot or AGV is involved, include its footprint, declared safety distances and anchoring requirement. You get a 3D design and an itemised all-inclusive quote back, at no charge and with no obligation.

Because this is a two-day show, a structure you own and reuse across several fairs in a year is almost always the better arithmetic than a single-use build. Our modular exhibition stands are designed for exactly that pattern — stored in Frankfurt between shows and refreshed with new graphics rather than rebuilt.

FAQ

Tech For Industry Show 2027 — Frequently Asked Questions

Real answers with real numbers. Click any question to expand.

When and where is Tech For Industry Show 2027?

It runs 19–20 May 2027, Wednesday and Thursday, at Paris Expo Porte de Versailles. Note that the slot has moved: the first edition was held 23–24 June 2026, so the second edition sits roughly five weeks earlier in the year.

Is it worth exhibiting at a show that has only had one edition?

Sometimes, and it depends on what you sell. The first edition drew 3,900 visitors from 953 industrial companies against 97 exhibitors — a good ratio, and a floor small enough that a visitor can walk all of it. If your buyer is a French industrial director and your sales cycle starts with a demonstration, that is a reasonable place to be. If you need volume leads or a large international audience, an established fair will serve you better, and we would rather say so than sell you a stand you regret.

How much does a stand cost?

From €4,500 to around €48,000 depending on size and complexity. A modular 18 m² sits in the €4,800–€10,100 range. A 24 m² custom stand with one demonstration cell position is typically €11,500–€15,000. A 48 m² with two demonstration positions runs €19,000–€26,000. Premium and double-decker builds from 80 m² start around €34,000.

What is not included in the price?

Three things. The floor space rental, which is between you and the organiser. Venue orders — network connection, electrical supply, rigging, waste and daily cleaning. And specialty extras such as AV hire beyond the listed screens, furniture beyond the standard set, catering and staffing during the show.

What size stand should I take here?

For a first appearance, 18 m² is usually right. It carries an aisle-legible screen, a working demonstration position and seats for two or three people, which matches how visitors arrive — the first edition's 3,900 attendees came from 953 companies, so buying groups rather than individuals. Go to 24 m² only if you are bringing something that physically moves.

Can I run a live software demonstration reliably?

Yes, if the connection is treated as a venue order rather than an assumption. We specify a wired line alongside the power order, design the cable run into the floor build, and set up a local instance under the counter so the demonstration survives a network failure. We also ask for a screen recording as a last resort. Hall wireless is fine for badge scanning and unsuitable for anything you plan to show a buyer.

Can the stand take a cobot or an AGV?

Yes. We need the cell footprint, the declared safety distances, the guarding requirement and how the unit is anchored, and we need them before the stand is designed rather than after. Reach envelope and floor fixing change the floor build and sometimes the stand shape, and aisle-side motion needs a standing operator because visitors will step in to look.

How heavy can equipment be?

Heavier than most people expect is fine, provided we know the crated weight in advance. We engineer a reinforced position rather than a general-purpose floor, and we plan the access route so the unit lands after the structure is up rather than being walled in. Send weights and dimensions with the brief.

Do I need customs paperwork for the stand?

Not for the stand. We build in Frankfurt and drive roughly 570 kilometres to Paris, entirely inside the EU, so there is no customs file and no border on the structure. Equipment or samples you ship in from outside the EU are a separate matter and stay with you.

Which hall will the show be in?

The 2026 edition was staged in Hall 5.2 at Porte de Versailles. The hall for 2027 is set by the organiser and confirmed with your stand allocation. We design to your issued stand number and the current hall plan rather than to last year's layout.

Do you handle the organiser and venue paperwork?

Yes — electrical and network orders, rigging permissions where applicable, waste removal, daily cleaning and crew passes. We file on the day a contract is signed, because venue service deadlines fall well before build-up and they are the ones that cannot be recovered late.

How long does installation take?

A modular 9–18 m² stand goes up in one shift. A 24–48 m² custom stand with a demonstration cell takes one to two days plus commissioning. Every stand is pre-assembled at our Frankfurt workshop first, which is what makes a short on-site window survivable.

When do I need to lock the design?

For a mid-May 2027 show, February is comfortable and March is tight. That is earlier than the date alone suggests, because the French May calendar loses Ascension Thursday on the 6th, the bridge day after it, and Whit Monday on the 17th — the Monday two days before the doors open. Freight, crews and accommodation compress into the remaining days.

Does the two-day format change what I should build?

It changes it a lot. Two show days is roughly sixteen open hours, so a single-use bespoke build has a poor return unless you are reusing it elsewhere. Most exhibitors here are better served by a system frame they own — stored in our Frankfurt warehouse and refreshed with new graphics for the next show.

Can I reuse the stand at other shows?

Yes, if it is built on a system frame. We store the structure in Frankfurt and adapt the graphics and layout for the next event. On a two-day show this is the difference between a sensible purchase and an expensive one.

How many staff should I plan for?

On 9 m², two. On 18 m², three — one working the aisle, one demonstrating, one in reserve for the conversation that runs long. With a physical demonstration cell, add a person whose only job is to stand between the aisle and the moving part. Two days means no rest day, so plan for genuine cover rather than heroics.

Does the conference programme affect stand traffic?

Materially, yes. The first edition ran 60 sessions with more than 140 speakers across two days, and on a floor this compact the aisles empty and refill on the session timetable. Ask where the conference areas sit relative to your stand, and staff the gaps rather than the whole day evenly.

Is the show in French or English?

It is a French show with a French industrial audience, so French belongs on the wall. Technical documentation in English is usually welcome alongside it, particularly for software. If you have both, send us both at briefing stage and we plan the panel hierarchy rather than crowding one panel with two languages.

What graphics files do you need?

Vector files for logos and certification marks, and high-resolution raster images at roughly 150 dpi at final print size. For this floor, send us the integration and protocol list as text too — it usually earns a panel of its own.

Can I visit during pre-build?

Yes, and for anything involving a demonstration cell we encourage it. The workshop is about fifteen minutes from Frankfurt Airport. You see the stand assembled, test the demonstration position against your actual equipment, and meet the crew who will install it in Paris.

Can you handle a rush build?

Usually, for the structure. What cannot be rushed is the venue services order — network and power connections have fixed deadlines and no builder can move them. On a show sitting immediately after a run of French public holidays, that is the single reason to start earlier than the date suggests.

How do I start?

Send your stand size, your stand number if the organiser has issued it, and a description of what you are demonstrating. You get a 3D design and a full itemised quote back.

Ready to Exhibit

Get Your Paris Stand Design in 48 Hours

Free 3D rendering before contract. One all-inclusive quote with no hidden line items, road freight from Frankfurt with no customs file — and the connectivity, screens and demonstration cell planned before the design is drawn.

48hrFree 3D Design
€4,500+All-Inclusive
28 daysTo Show Floor
4.9Trustpilot4.9Google
WhatsApp us
WhatsApp us