Skip to content
SPS 2026
SOL Germany · Nuremberg

Automation Stand Builder for SPS in Nuremberg

Stands for Messe Nuremberg, 24–26 November 2026 — built and inspected in our Frankfurt workshop, then driven down and installed by our own crew. Domestic freight, no customs, on a route we run several times a year.

€4,500+From
500+Stands
15 YrsEurope
4.9Trustpilot4.9Google
Browse Designs
SOL Germany exhibition stand for an industrial automation exhibitor at Messe Nuremberg
24–26 NOV 2026
Nuremberg, Germany
24–26 November 2026Show Dates
Messe NürnbergVenue
15 HallsFloor
1,000+Exhibitors
MesagoOrganiser
3 DaysDuration
Event Overview

SPS 2026 — Everything You Need to Know

SPS is the automation industry's yearly gathering point — fifteen halls of drives, controls, sensors, industrial software and networking, in one venue for three days.

SPS 2026 — At a Glance

Dates
24–26 November 2026 (Tuesday to Thursday)
Venue
Messe Nürnberg, Nuremberg, Germany
Floor
15 exhibition halls
Exhibitors
More than 1,000 companies; the 2025 edition drew 1,175 from 39 countries
Visitors
Around 56,000 at the 2025 edition — process engineers, plant and controls specialists, system integrators
Organiser
Mesago Messe Frankfurt GmbH
Edition
The 36th SPS, running annually since 1990
What makes it different
SPS shows complete systems, not only individual components — visitors come to see how parts integrate

Why Exhibitors Choose SOL Germany for SPS

Nuremberg is a route we run repeatedly. It is one of our most frequent destinations — SPS in November, it-sa in October, Chillventa, Powtech, Fachpack, IWA and Spielwarenmesse across the rest of the calendar. The stand is built and assembled on our own floor in Frankfurt, photographed for your approval, then driven roughly 220 kilometres south. Domestic road freight, no customs file, no border, and a crew who have worked these halls before.

That matters more at SPS than at most shows, because the November move-in window at Messe Nürnberg is crowded. A show with fifteen halls and over a thousand exhibitors puts a lot of trucks through the same gates in the same two days. Knowing the site, the marshalling routine and where the delivery pressure falls is worth more than a cheaper quote from someone arriving for the first time.

It also means a problem is recoverable. If a graphic panel is damaged in transit we reprint it in Frankfurt and it goes down on the next run rather than becoming a hole in your back wall for three days.

What you sign is one quote. There is no second invoice arriving three weeks after the show closes.

From Our Project Managers

What We've Learned Building in the Nuremberg Halls

Practical notes from the SOL Germany team — the things the exhibitor manual does not tell you.

CD

Your Hall Neighbours Decide Your Traffic More Than Your Stand Does

Fifteen halls is a lot of walking, and visitors plan their route around the large anchor stands. If you are a component supplier placed in a hall dominated by two or three of the big automation names, most of your traffic is people already walking toward them. That is not a bad position — it is a very good one — but it changes the design. You want the aisle-facing edge working hard and a clear, readable statement of what you actually make, because you are catching people in transit rather than at their destination.

A Networked Demo Needs a Network, Not Just Power

This is the SPS-specific mistake. Exhibitors carefully order three-phase power and then assume they can run a live PLC, HMI and cloud dashboard over the venue's public wireless. On a floor with a thousand automation exhibitors all doing the same thing, the 2.4 GHz band is unusable by mid-morning. If your demonstration touches a network, order a wired line from the organiser at the same time as the power, and treat it as equally critical.

Three Days Is Shorter Than It Sounds

SPS runs Tuesday to Thursday. There is no fourth day to recover on, and no weekend traffic. Anything unresolved on Tuesday morning costs you a third of the show, not a quarter. We build a full day of contingency into the Nuremberg schedule for that reason, and we pre-assemble everything in Frankfurt first so the hall build is a repeat rather than a first attempt.

Component Exhibitors and System Exhibitors Need Opposite Stands

SPS is one of the few fairs where both turn up in force. If you sell components, the stand is a display problem: many small high-value items, seen clearly, at eye level, with the specification legible from the aisle. If you sell integrated systems, it is a demonstration and seating problem: one working rig and somewhere to sit while the integration conversation runs long. Trying to do both on 24 m² usually means doing neither well.

SPS and Formnext Are One Week Apart

Formnext runs 17–20 November and SPS opens on the 24th. If you exhibit at both — and a fair number of our clients do — that is a single week between dismantle and the next install. It is entirely workable, but only if both stands are planned together and the workshop slots are booked as a pair. Left to chance, the second build gets squeezed.

Late November in Franconia Is Cold, and the Floor Is Concrete

Move-in runs in the last week of November. Crews are in the halls before light and after dark, the loading yards are wet, and the concrete pulls heat out of everything standing on it. It changes practical choices: flooring build-up matters more than usual, adhesive cure times run longer, and anything with a cardboard core does not enjoy the trip from the yard.

Transparent Pricing

What an SPS Stand Actually Costs

At SPS the price is driven by two things: floor area, and whether you are running live equipment. The three brackets below cover most of what we build at Messe Nürnberg. Domestic freight is inside every one of them, and there is no customs line at all.

Essential — 9–18 m²

From €4,500
Best for: first-time SPS exhibitors, component and sensor suppliers, software vendors testing the show
  • Modular aluminium system frame
  • Backlit fabric back wall, full height
  • One branded reception counter
  • Standard LED top-rail lighting
  • Graphics design and print (two revision rounds)
  • Frankfurt → Nuremberg road freight
  • Installation and dismantling
  • Messe Nürnberg electrical and cleaning paperwork

Not included: monitors, enclosed meeting room, network line. Add-ons quoted line by line.

Premium — 50–100+ m²

From €34,000
Best for: full-range automation suppliers, flagship stands, exhibitors running several systems at once
  • Architectural custom build, optional double-decker
  • Multiple enclosed meeting rooms
  • Several separated demo bays with independent services
  • Hanging sign where the hall permits
  • Full AV package and touchscreen kiosks
  • Technical back-of-house and storage
  • Priority workshop build slot
  • Two-crew install to compress the build window

Not included: floor space rental, rigging fees, AV hire beyond the package, catering.

Recent Builds

Stands We Have Built

Stands delivered across German and European engineering shows, including repeat builds at Messe Nürnberg.

A Guide to SPS for First-Time Exhibitors

SPS — Smart Production Solutions — is the automation industry's principal annual meeting in Europe, and the 2026 edition runs 24–26 November at Messe Nürnberg. It fills fifteen halls with more than a thousand exhibitors; the 2025 edition drew 1,175 companies from 39 countries and around 56,000 visitors. 2026 is the 36th edition.

What separates SPS from a general industrial fair is that it shows complete systems rather than only components. Visitors are not just comparing sensors against sensors; they are working out how a drive, a controller, a network layer and a piece of software behave together. That single fact should shape your stand more than anything else on this page.

Who Exhibits at SPS and What Visitors Want

The floor divides roughly into drive systems and components, control and interface technology, sensors, industrial communication and networking, mechanical infrastructure, and software and IT. The convergence is the interesting part: the software and IT presence has grown steadily, and those exhibitors now sit alongside hardware rather than in a separate corner.

The visitor is technical and specific — process engineers, controls specialists, plant engineers, system integrators and the people who will be responsible for the installation afterwards. They arrive with a shortlist and a problem. They are not browsing. What they want to establish in the first minute at your stand is what layer of the stack you occupy, what you interoperate with, and whether you can support a rollout at their scale.

Stand Size: Choosing Between 9, 18, 24 and 48 Square Metres

Nine square metres works at SPS in a way it does not at every show, because a great many component suppliers exhibit small and the audience is used to it. You get a counter, a back wall and a display shelf. It is a legitimate first outing if your product is physically small and your goal is to be findable.

Eighteen square metres is the point at which you can hold a conversation without standing in the aisle, and it suits software and service exhibitors who need screens rather than benches.

Twenty-four is the threshold for a working demonstration. Below it, a live rig and a meeting both fit only in theory; above it, you can put a demo bench along one edge and keep a seated corner separate from it. If you are demonstrating an integrated system, treat 24 m² as the practical floor.

At 48 m² you can run two demo positions and still have an enclosed meeting room, which matters when integration discussions run for an hour. From 80 m² upward a double-decker becomes worth pricing: an upstairs meeting deck adds capacity without eating the ground-floor circulation your demonstrations need.

What an SPS Stand Costs by Size

Ranges below are all-in for design, fabrication, graphics, domestic freight, install and dismantle. They exclude the floor space rental you pay to Mesago, and the electrical and network orders placed with the venue.

  • 9 m² modular: €4,100–€8,700
  • 18 m² modular: €4,800–€10,100
  • 24 m² custom with demo bench: €11,500–€15,000
  • 30 m² custom with enclosed meeting room: €15,000–€19,000
  • 48 m² custom with two demo positions: €19,000–€26,000
  • 80 m² premium or double-decker: €34,000–€48,000

Common Mistakes, in Order of Frequency

The first is designing for a component audience when you sell systems, or the reverse — the two need physically different stands. The second is ordering power but not a wired network line, then discovering the demonstration depends on a wireless band that a thousand other exhibitors are also using. The third is a back wall carrying a large logo where the capability statement should be; this audience wants to know what you interoperate with, not what your brand mark looks like at three metres. The fourth is under-staffing Tuesday, which is the heaviest day of a three-day show. The fifth is leaving the design unlocked into October, which collides with the Formnext and Fachpack builds already in the workshop. All five are avoidable at planning stage.

Getting Started

Send your stand size, your hall and stand number if Mesago has issued it, and a short description of what you intend to demonstrate — particularly whether it needs a network connection. You get a 3D design and an itemised all-in quote, at no charge and with no obligation. If a smaller local builder is the better answer for a 9 m² shell, we will tell you that.

SPS is annual and most exhibitors here also attend one or two other European events, so a reusable system frame is usually the better purchase — the structure stays in our Frankfurt warehouse and each show costs a graphics refresh rather than a rebuild. Our modular exhibition stands are built for exactly that pattern.

FAQ

SPS 2026 — Frequently Asked Questions

Real answers with real numbers. Click any question to expand.

When and where is SPS 2026?

SPS 2026 runs 24–26 November 2026 at Messe Nürnberg, across fifteen exhibition halls. It is organised by Mesago Messe Frankfurt GmbH and expects more than 1,000 exhibitors. The 2025 edition drew 1,175 exhibitors from 39 countries and around 56,000 visitors.

How much does an SPS stand cost?

From €4,500 to around €48,000 depending on size. A modular 18 m² sits in the €4,800–€10,100 range. A 24 m² custom stand with a demo bench is typically €11,500–€15,000. A 48 m² with two demo positions runs €19,000–€26,000. Premium and double-decker builds from 80 m² start around €34,000. Design, build, graphics, freight, install and dismantle are inside those numbers.

What is not included in the price?

Three things. The floor space rental, which is between you and Mesago. Electrical, network and rigging orders placed with the venue. And specialty add-ons — AV beyond the listed package, furniture beyond the standard set, catering, and staffing during the show.

Is there customs to pay on the stand?

No. Nuremberg is domestic for us. We build in Frankfurt and drive roughly 220 kilometres south, so there is no customs file and no border on the stand itself. Anything you ship in from outside the EU is separate and stays with you.

Can the stand run a live automation demonstration?

Yes, and at SPS that is the normal case. We engineer the demo bench for the real weight and cable routing of your rig, plan access so it is positioned before the walls close in, and design the cable management around it rather than hiding it afterwards.

What about a network connection for the demo?

Order a wired line from the organiser at the same time as the power. On a floor with a thousand automation exhibitors the public wireless is unreliable by mid-morning. Tell us at briefing stage if the demonstration touches a network and we file both orders together.

What power will I need?

It depends on the equipment. Most live automation demonstrations run on standard single-phase, but drives, motors and test rigs frequently need three-phase, ordered through the organiser ahead of the deadline. Send the equipment list and we specify and file it as part of the build.

Do you handle the Messe Nürnberg paperwork?

Yes, all of it — electrical and network orders, rigging permissions, waste removal, daily cleaning and crew passes. We file on the day a contract is signed rather than waiting for the design to be final, because the deadlines fall well before build-up.

Which hall will I be in?

Hall and stand allocation is set by Mesago, not by us. Once you have your stand number we design to that specific position — which sides are open, where the aisle traffic arrives from, and who your neighbours are, which at SPS matters a great deal.

How long does install take?

A modular 9–18 m² stand goes up in one shift. A 24–48 m² custom stand takes one to two days plus commissioning time for your equipment. Premium and double-decker builds use the full window. Every stand is pre-assembled at our workshop first, so the hall build repeats a build the crew has already done.

When do I need to lock the design?

For a late-November show, mid-September is comfortable and early October is tight. The constraint is our workshop slot rather than freight — Formnext and Fachpack sit in the same autumn window, so the queue is real. Stands above 48 m², or any stand with a custom demo bench, should be locked earlier.

I exhibit at both Formnext and SPS. Can you do both?

Yes, and it is worth planning them as one job. Formnext runs 17–20 November and SPS opens on the 24th, so there is a single week between dismantle and install. We book the two workshop slots together and sequence the crews; done separately, the second build gets compressed.

Can you handle a rush build?

Usually. Because the freight is domestic there is no expedited shipping to buy, so the rush premium is lower than on a cross-border build. The limits are the workshop slot and the venue's own ordering deadlines, which we cannot move.

Can I visit during pre-build?

Yes, and we encourage it. The workshop is about fifteen minutes from Frankfurt Airport, so clients often add a half-day to a trip they are already making. You see the stand assembled, change what you want changed, and meet the crew who will be in the hall.

Can I reuse the stand at other shows?

Yes, if it is built on a system frame. We store the structure in Frankfurt between events and refresh the graphics per show, which is normally a fraction of the cost of rebuilding. Custom timber elements are usually good for one show.

What happens to the stand after the show?

Our crew dismantles and returns it to Frankfurt. If you plan to reuse it we store the structure; aluminium framing is fully recyclable and fabric graphics are generally not reusable after a show.

What graphics files do you need?

Vector files for logos, and high-resolution raster images at roughly 150 dpi at final print size for photography. If you do not have those, our design team redraws logos and rebuilds compositions rather than printing something that will look soft at two metres wide.

How many staff should I plan for?

On 18 m², two to three. On 24 m² with a live demo and a meeting corner, three to four — someone has to stay free for the aisle while a demonstration runs. At 48 m² and above, five or more. The constraint is almost never floor space; it is having someone available when a serious visitor stops.

Do you build at other Nuremberg shows?

Yes — it-sa, Chillventa, Powtech, Fachpack, IWA OutdoorClassics and Spielwarenmesse, among others. The same crew and the same route, which is part of why the Nuremberg schedule is predictable for us.

How do I start?

Send your stand size, hall position if you have it, and what you plan to demonstrate. You get a 3D design and a full itemised quote back. If we are not the right builder for the job, we will say so.

Ready to Exhibit

Get Your SPS Stand Design in 48 Hours

Free 3D rendering before contract. One all-inclusive quote with no hidden line items, domestic freight and no customs, on a Nuremberg route we run several times a year.

48hrFree 3D Design
€4,500+All-Inclusive
28 daysTo Show Floor
4.9Trustpilot4.9Google
WhatsApp us
WhatsApp us
Live now