Skip to content
SIAL Paris 2026
SOL Germany · Paris Nord Villepinte

SIAL Paris Stand Builder in Paris, France

Stands for Paris Nord Villepinte, 17–21 October 2026, built in our Frankfurt workshop, trucked to Villepinte and installed by our own crew. Planned around what a five-day sourcing show actually asks for: product a buyer can read from the aisle, a serving point that survives all five days, and chilled storage behind it.

€4,500+From
500+Stands
15 YrsEurope
4.9★Trustpilot4.9★Google
Browse Designs
SIAL Paris 2026 stand builder, SOL Germany food and beverage exhibition stand at Paris Nord Villepinte
Paris Nord Villepinte
17–21 October 2026Show Dates
Paris Nord VillepinteVenue
BiennialCycle
7,500Exhibitors 2024
ComexposiumOrganiser
285,000+Visitors 2024
Event Overview

SIAL Paris 2026: Everything You Need to Know

SIAL Paris is the largest food and beverage sourcing show on the calendar, and it runs only every second year. That rhythm changes how you should budget for it, how early you should book, and what you should build.

SIAL Paris 2026: At a Glance

Dates
Saturday 17 to Wednesday 21 October 2026, five days
Venue
Parc des Expositions de Paris-Nord Villepinte, 82 Avenue des Nations, 93420 Villepinte
Opening times
Saturday to Tuesday 10.00–18.30; Wednesday 10.00–17.00, last admission 14.00
Cycle
Biennial, even years: the edition after 2026 falls in 2028
Exhibitors
7,500 from 127 countries at the 2024 edition
Visitors
More than 285,000 food professionals over five days in 2024, from over 200 countries
Floor area
More than 270,000 square metres of exhibition space in 2024
Organiser
Comexposium. The show has run since 1964 and anchors the SIAL Network

Why Food Exhibitors Choose SOL Germany for SIAL Paris

A SIAL stand is judged by a buyer walking past it with a shopping list and four days of appointments already booked. That buyer needs to know, in about two seconds from the aisle, what the product category is, where it comes from, and whether it is worth stopping for. Almost every design problem on this show floor traces back to that two-second test. We build the stand around it: product held at eye level rather than waist level, country of origin and certification marks readable at three metres, and the tasting counter positioned so it draws people in without walling off the display behind it.

The second thing that separates SIAL from a technology fair is that you are handling food for five days, not showing a machine for three. Chilled storage, a hand-wash point, a waste route and a restocking path are stand engineering, not afterthoughts, and they get designed in at the layout stage rather than discovered on the Friday before opening.

We build in Frankfurt and truck to Villepinte. Germany to France is an intra-EU road movement, so there is no customs clearance, no carnet and no broker on the stand itself: one loaded truck, one crew, one arrival slot. Your product still needs its own food paperwork; the stand does not.

What you sign is one quote. There is no second invoice arriving three weeks after the show closes.

From Our Project Managers

What We Have Learned Building Food Stands at Villepinte

Practical notes from the SOL Germany team: the parts of a SIAL build the exhibitor manual does not warn you about.

CD

A Sampling Stand Is a Food-Handling Stand

The single most common misjudgement here is treating the tasting counter as furniture. The moment you serve product, you need a hand-wash point, a route for wet and dry waste, a surface that can actually be cleaned between sessions, and somewhere to keep product cold that is not a domestic fridge shoved under a plinth. A domestic fridge in a closed counter also dumps its heat into that counter, which is how exhibitors end up with warm cheese on day three. We plan the serving point as a small working kitchen with a defined dirty side and clean side, then style it. Doing it the other way around costs a rebuild.

The 2026 Saturday Opening Moves Your Whole Build Backwards

For 2026 the organiser has moved the first show day to a Saturday, stated reason being to keep visitors and exhibitors out of peak transport hours. That is good for the aisles and awkward for the build. Everything an exhibitor remembers from 2024 (the last-minute Sunday snagging, the final delivery on the morning of day one) shifts a day earlier. Your stand has to be finished, cleaned, stocked and food-safe by the Friday evening. We now plan SIAL builds to hand over a full day before opening rather than the night before, and we book crew accommodation for the extra night.

Five Days Is a Restocking Problem, Not a Build Problem

Most European trade fairs run three days. SIAL runs five, and the difference is not linear; it is roughly double the product you will hand out and double the time your team spends on their feet. Under-specifying on-stand storage is the mistake that shows: by Monday the surplus cartons are stacked visibly behind the counter and the stand looks like a market stall. We budget storage volume against a daily consumption estimate you give us, add a chilled reserve, and where the stand cannot hold five days of stock we plan a resupply run rather than pretending the space exists.

Villepinte Is Not Paris, and Planning It as Paris Costs You Hours

Paris Nord Villepinte sits north-east of the city near Roissy, not in central Paris. Freight arrives off the motorway network rather than through the city, and a crew staying on the Left Bank because someone booked a nice hotel will lose two hours a day to the RER and traffic. We put our crew close to the venue and keep the truck slot early. It is unglamorous and it is the difference between a calm Friday and a midnight finish.

Buyers Negotiate Sitting Down: Count Your Seats

At a machinery show the conversation happens standing next to the equipment. At a sourcing show it happens across a table, with samples, a price list and a phone, and it can run forty minutes. Exhibitors routinely arrive with one meeting table for a team of four and spend the show turning people away or negotiating in the aisle. On a 24 square metre stand we would rather lose a metre of display run than a second seating position, and that trade-off is worth making before the design is drawn, not after.

Country of Origin and Certification Belong on the Wall, Not the Leaflet

The visitor here is an importer, a distributor, a retail buyer or a food-service purchaser, and a large share of them are working in a second or third language. Origin, organic and halal or kosher certification, allergen position and minimum order quantity are the four things that decide whether they stop, and putting them only in a brochure means they are read after the decision has already been made. We design them into the graphics as readable wall elements, in English plus one other language where the target market justifies it.

Client Testimonials

What our clients say

A booth that exceeded expectations

A booth designed for attention at CPHI Worldwide

Stands our clients trust at CPHI Worldwide

Transparent Pricing

What a SIAL Paris Stand Actually Costs

Two things push a SIAL budget above the equivalent stand at a three-day technical fair: the serving and cold-chain package, and the extra two days of crew, cleaning and stock. The brackets below carry both. Floor space is rented from the organiser and is never inside a build quote, ours or anybody else's.

Essential: 9–18 m²

From €4,500
Best for: single-product exporters, regional producer groups, and first-time SIAL exhibitors testing the market
  • Modular aluminium system frame
  • Backlit fabric back wall, full height
  • One branded counter, specified for serving rather than storage
  • Under-counter chilled unit position, vented
  • Standard LED top-rail lighting
  • Graphics design and print, origin and certification blocks included (two revision rounds)
  • Frankfurt → Villepinte road freight, no customs
  • Installation, dismantling and organiser paperwork

Not included: floor space rental, venue electrical and water orders, hand-wash plumbing, furniture beyond the counter.

Premium: 50–100+ m²

From €34,000
Best for: market leaders, multi-brand groups and country pavilions taking a corner or island position
  • Double-height or double-decker structure where the hall allows
  • Demonstration kitchen or chef station
  • Separate hospitality and negotiation areas
  • Full cold chain: chilled, frozen and ambient storage
  • Integrated AV and screen walls
  • Rigged overhead branding where the hall permits
  • Dedicated project manager plus on-site supervisor for all five days
  • Full documentation pack for the organiser and the venue

Not included: floor space rental, rigging fees, AV hire beyond the package, catering staff, product logistics and cold-chain transport of the product itself.

Recent Builds

Stands We Have Built

Stands delivered across European food, ingredients and consumer trade fairs, including repeat builds in France.

A Guide to SIAL Paris for First-Time Exhibitors

SIAL Paris is the international food and beverage exhibition held at the Parc des Expositions de Paris-Nord Villepinte, and the 2026 edition runs from Saturday 17 to Wednesday 21 October. It is organised by Comexposium, has been held since 1964, and takes place every second year in even-numbered years. The 2024 edition brought together 7,500 exhibitors from 127 countries across more than 270,000 square metres, and drew over 285,000 food professionals from more than 200 countries.

Two features of the 2026 edition matter before you plan anything. The first is that the show opens on a Saturday for the first time, which the organiser has explained as a way of keeping arrivals out of peak transport hours; it pulls your entire build schedule a day forward. The second is that the floor is organised into ten business sectors covering the food chain from fresh produce and meat through dairy, seafood, grocery and beverages to processing and equipment. Which sector you sit in determines your neighbours, your aisle traffic and, in practice, how hard you have to work to be visible.

Opening times are 10.00 to 18.30 from Saturday through Tuesday, and 10.00 to 17.00 on the Wednesday with last admission at 14.00. That final short day is worth planning for: it is a genuine half day of trading, not a full one, and stock planning should reflect it.

Who Exhibits at SIAL Paris and What Buyers Come For

The exhibitor base runs from single-estate producers and regional cooperatives up to multinational manufacturers, with a heavy presence of national and regional pavilions grouping producers under one country identity. Categories span grocery, fresh produce, meat, dairy, seafood, frozen, beverages, bakery and snacking, ingredients and private label, alongside processing and packaging solutions.

The visitor is a buyer with purchasing authority: importers and wholesalers, distributors and agents, supermarket and hypermarket buyers, food-service and catering purchasers, hotel and restaurant groups, and retail private-label teams. The great majority are international. That single fact should shape your stand more than any styling decision, because it means most people reading your wall are doing so in a second language and scanning for four data points: what it is, where it is from, what certifications it carries, and what quantity you can supply.

It also means your team composition matters. A stand staffed only by people who cannot quote a price or discuss a minimum order will convert badly, however well it is built. We have watched beautifully designed stands underperform next to plain ones because the plain one had a commercial decision-maker sitting at the table.

Sourcing-Scale Product Display: Designing a Stand a Buyer Can Read

This is the section that separates a food-sourcing show from every other kind of exhibition, and it is where most budget gets misallocated. At SIAL, the product is the display. Not a render of the product, not a photograph of a field, and not a brand film on a screen: the physical pack, in quantity, presented so that a buyer can pick it up. A stand that shows six SKUs beautifully will be outperformed by one that shows sixty legibly, provided the sixty are organised.

Organisation is the whole trick. We build product walls in bands: a top band at roughly eye height for the hero range, a middle band at reach height for the working assortment, and a lower band for volume or bulk formats. Each band gets its own lighting so the top band reads from the aisle and the middle band reads from a metre away. Shelving depth is kept shallow; deep shelves swallow packs and create shadow. Where a range has many variants, we group by colour block rather than by product code, because a buyer navigates a wall visually before they read a single word.

The second half of the problem is the tasting counter, which tends to expand until it blocks everything behind it. On stands under 30 square metres we push the serving point to one side of the frontage rather than the centre, so the queue forms along the aisle edge instead of in front of the product wall. On larger stands we separate them entirely: serving at the open corner where traffic is heaviest, display along the deeper wall where people slow down, and seated meetings behind both. This is the single layout decision that most reliably changes how a SIAL stand performs.

Finally, plan for the wall to change. Producers routinely add a listing or drop a SKU between the design freeze and the show. We specify display systems where a shelf position can be re-cut or a graphic panel reprinted without touching the structure, which is cheaper than it sounds and saves a genuinely stressful week.

Sampling, Cold Chain and Food Safety on Stand

If you are serving, the stand has to support food handling for five consecutive days. That means a defined preparation surface, a hand-wash provision, separated wet and dry waste with a route to the venue's waste points that does not cross your display, and cold storage sized for a day of trading plus a reserve. Chilled and frozen units generate heat and noise, so they get positioned and vented deliberately rather than hidden in the nearest cupboard.

Venue water, waste and electrical connections are ordered separately from your stand build, they are position-dependent, and they cannot be moved once the floor build has started. We settle the services layout before the design is drawn. A stand designed first and serviced second is how a hose ends up crossing the aisle-facing corner of an otherwise excellent build.

Product transport is a separate discipline from stand transport, and we say so plainly rather than quietly absorbing it. Your stand travels in our truck. Temperature-controlled product should travel in a temperature-controlled vehicle with its own documentation and its own arrival window. We will coordinate the two arrivals, and we will tell you if a plan does not hold up.

What a SIAL Paris Stand Costs by Size

The ranges below are what European exhibitors of this profile typically spend on the physical stand for a five-day food show, including design, build, road freight from Frankfurt, installation and dismantling. They exclude floor space rental, venue service orders, catering staff and the product itself.

  • 9 m² modular: €4,100–€8,700
  • 18 m² modular with a serving counter: €4,800–€10,100
  • 24 m² custom with tasting point and chilled storage: €11,500–€15,000
  • 30 m² custom with seated meeting area: €15,000–€19,000
  • 48 m² custom with full serving line and back-of-house store: €19,000–€26,000
  • 80 m² premium, pavilion or double-decker: €34,000–€48,000

The two lines that surprise first-time exhibitors are the serving package and the fifth day. A serving point built properly (vented cold storage, a cleanable preparation surface, waste separation, a hand-wash provision) adds meaningfully to a small stand and barely registers on a large one, which is why the jump from 18 to 24 square metres looks steeper here than at a technical fair. The extra two days show up as crew, supervision and cleaning rather than as structure.

Booking, Lead Times and the Two-Year Gap

Because SIAL runs biennially, the sensible planning horizon is longer than for an annual show and the reuse economics are much better. A system-based stand stored in our Frankfurt warehouse between editions turns the 2028 build into a graphics refresh and a layout revision rather than a new stand, which is typically a substantial saving on the second outing. Space at SIAL also fills early (the 2024 edition was reported at around ninety percent sold well ahead of the show), so the stand conversation is best had once your floor position is confirmed rather than before.

Our own lead time is a free 3D design within 48 hours of a brief, and roughly 28 days from signed drawings to the show floor for a standard build. Larger custom and double-decker projects need longer, mostly for structural approval and rigging paperwork rather than fabrication. If you are reading this within eight weeks of the show and have a confirmed space, send the brief anyway; we will tell you honestly whether it is buildable in the time or not.

Because SIAL is biennial, a reusable system frame is a particularly sensible purchase here: the structure stays in our Frankfurt warehouse between editions, and the 2028 show costs a graphics refresh rather than a rebuild. Our modular exhibition stands are built for exactly that pattern.

FAQ

SIAL Paris 2026: Frequently Asked Questions

Real answers with real numbers. Click any question to expand.

When and where is SIAL Paris 2026?

SIAL Paris 2026 runs from Saturday 17 to Wednesday 21 October 2026 at the Parc des Expositions de Paris-Nord Villepinte, 82 Avenue des Nations, 93420 Villepinte. It is organised by Comexposium. Opening times are 10.00 to 18.30 from Saturday to Tuesday and 10.00 to 17.00 on the Wednesday, with last admission at 14.00.

How often is SIAL Paris held, and when is the next edition after 2026?

SIAL Paris is biennial and runs in even-numbered years, every October. The show has been held since 1964. After the 17–21 October 2026 edition, the next one falls in 2028; the organiser confirms exact dates roughly a year to eighteen months ahead. The two-year gap is the main reason we recommend a reusable system stand here: the structure is stored in Frankfurt and the next edition costs a graphics refresh rather than a new build.

Why does the 2026 edition open on a Saturday?

The organiser moved the first day to Saturday to keep visitor and exhibitor arrivals out of peak transport hours around the venue. For exhibitors the practical effect is that the whole build schedule shifts a day earlier: your stand needs to be finished, cleaned and stocked by the Friday evening rather than over a Sunday morning.

What does a stand at SIAL Paris cost?

A 9 to 18 square metre modular stand starts at €4,500 all-in. A 24 to 48 square metre custom build with a proper serving point and chilled storage starts at €11,500. Premium builds, pavilions and double-deckers from 50 square metres start at €34,000. Floor space is rented separately from the organiser and is not part of any build quote.

What is included in your price, and what is not?

Included: free 3D design before contract, fabrication and inspection at our Frankfurt workshop, graphics, road freight to Villepinte, installation, dismantling, organiser paperwork, an on-site supervisor and a dedicated project manager. Not included: floor space rental, venue electrical, water and waste orders, catering staff, and transport of your product. Every quote is itemised so you can see each line.

Can you build a stand that handles food sampling and serving?

Yes, and it is most of what we design for this show. A serving stand needs a cleanable preparation surface, a hand-wash provision, separated wet and dry waste with a route that avoids your display, and vented cold storage sized for a full day plus reserve. We plan those as structure at the layout stage. Retro-fitting them into a finished design is where cost and stress come from.

How is refrigeration on the stand arranged?

We specify the units and design their positions, ventilation and power draw into the stand. The electrical supply itself is ordered from the venue, is position-dependent, and cannot be relocated once the floor build begins, so we fix the services layout before the design is finalised. For frozen or multi-temperature requirements, tell us at brief stage; it changes the back-of-house footprint.

Is there customs paperwork moving a stand from Germany to France?

No. Germany to France is an intra-EU road movement, so there is no customs clearance, no ATA carnet and no broker for the stand. One truck leaves our Frankfurt workshop and arrives at Villepinte on a booked slot. Your product may still carry its own food, health or origin documentation. That is separate from the stand and we will flag what we can see.

How quickly can we get a design and a quote?

A free 3D design within 48 hours of receiving your brief, with no obligation and no contract first. To make that useful, send your stand number and dimensions, whether it is in-line, corner, peninsula or island, your SKU count, and whether you are serving. The quote follows the design so you are pricing something specific rather than a generic square-metre rate.

How far in advance should we book?

Once your floor position is confirmed. Twelve to sixteen weeks is comfortable for a custom build; 28 days from signed drawings is our standard production window for a modular stand. Larger structures and anything rigged need longer, mainly for approval paperwork. Late enquiries are worth making: we will tell you plainly whether it is buildable in the time rather than take the booking and hope.

What size stand do we need at SIAL?

It depends on whether you are serving and how many buyers you expect to seat. Nine to 18 square metres suits a focused range with a small counter. Twenty-four to 30 square metres is the working size for a full assortment with a tasting point and one or two meeting positions. Above 48 square metres you can separate serving, display and negotiation properly, which is when a large stand starts earning its cost.

Can we reuse the stand at the 2028 edition?

Yes, and with a biennial show it is usually the better economics. Our modular system frames are designed to be dismantled, stored in our Frankfurt warehouse and rebuilt in a different configuration. The recurring cost becomes graphics, any layout change and freight. Custom joinery elements can also be stored where they are worth keeping; we will tell you which parts are and which are not.

Where is Paris Nord Villepinte and how do we get there?

The venue is at 82 Avenue des Nations, 93420 Villepinte, north-east of Paris near Roissy rather than in the city itself. It is reached by motorway from the north and east, and by RER from central Paris. For exhibitor teams, proximity to the venue matters more than proximity to the city centre: the commute in and out during show week is the thing that erodes your day.

Where should our team and crew stay?

Close to the venue. A hotel in central Paris looks appealing and costs your team roughly two hours a day across a five-day show, on top of an early build morning. We book our own installation crew near the venue as standard. For client teams we usually suggest the same, with one social evening in the city rather than a daily commute out of it.

Do you handle the organiser and venue paperwork?

Yes. Stand design submissions, height and structural declarations, contractor registration and build-up access documentation are handled by us as part of the build. Orders that are legally yours as the exhibitor (floor space, electrical supply, water and waste connections) we prepare and specify, and you place. We will tell you the deadlines rather than let you find them.

What happens with waste, cleaning and restocking across five days?

This is the part exhibitors under-plan. Five days roughly doubles the sampling volume and the waste of a standard three-day fair. We size on-stand storage against a daily consumption figure you give us, keep a chilled reserve, and design a restocking route that does not run through your display. Daily stand cleaning is ordered from the venue and is not part of a build quote; we will remind you to order it.

Do you have French-speaking support on site?

Our project manager and on-site supervisor are present for the full build and the show itself, and we work in English, German, French and Spanish across the group. For venue-side coordination at Villepinte we work with French-speaking site contacts as standard, since the exhibitor manual, the service orders and the hall marshalling all operate in French.

Can you build a country or regional pavilion for a group of producers?

Yes, and it is common at SIAL. The design problem is different from a single-brand stand: each producer needs individual identity and product space while the pavilion needs one readable identity from the aisle. We usually solve it with a shared structural and lighting language, a common tasting and hospitality core, and individual product bays with consistent graphic framing. Tell us the producer count at brief stage. It drives the whole layout.

What happens if our product arrives late or damaged?

The stand is built and inspected in Frankfurt before it travels, and it arrives on a booked slot with our crew, so stand-side surprises are rare. Product logistics are separate and we are honest about that: we coordinate the arrival windows and we hold empty display space that can be filled late, but we do not control a temperature-controlled product shipment. Where we can see a plan that will not hold, we say so at the planning stage.

Do you work with exhibitors who are not based in Germany?

Yes. Most of the stands we build at SIAL are for exhibitors based outside Germany, and the build location makes no difference to you: the stand is fabricated in Frankfurt and delivered to Villepinte regardless of where your company sits. We work across Europe and coordinate with the wider SOL group for exhibitors based in India, the UAE and the United States.

Ready to Exhibit

Get Your SIAL Paris Stand Design in 48 Hours

Free 3D rendering before contract. One all-inclusive quote with no hidden line items, intra-EU road freight and no customs, with the serving point, cold storage and five days of restocking planned before the design is drawn.

48hrFree 3D Design
€4,500+All-Inclusive
28 daysTo Show Floor
4.9★Trustpilot4.9★Google
WhatsApp us
WhatsApp us
Live now