Skip to content
POWTECH TECHNOPHARM 2026
SOL Germany · Nuremberg

Process Technology Stand Builder for POWTECH TECHNOPHARM in Nuremberg

Stands for Messe Nuremberg, 29 September to 1 October 2026 — built in our Frankfurt workshop and installed by our own crew. Engineered around what running process machinery actually demands: floor loading, three-phase power, compressed air, and somewhere for the dust to go.

€4,500+From
500+Stands
15 YrsEurope
4.9Trustpilot4.9Google
Browse Designs
SOL Germany exhibition stand for a process engineering exhibitor at Messe Nuremberg
29 SEP – 1 OCT 2026
Nuremberg, Germany
29 Sep – 1 Oct 2026Show Dates
Messe NürnbergVenue
2 On, 1 OffCycle
550Exhibitors
NürnbergMesseOrganiser
10,000Visitors
Event Overview

POWTECH TECHNOPHARM 2026 — Everything You Need to Know

POWTECH TECHNOPHARM is the European meeting point for processing powders, granulates, bulk solids and liquids — and, since TECHNOPHARM was reactivated, for GxP-compliant pharmaceutical production as well. It is the heaviest floor we build on in Nuremberg.

POWTECH TECHNOPHARM 2026 — At a Glance

Dates
29 September to 1 October 2026 (Tuesday to Thursday)
Venue
Exhibition Centre Nuremberg, Messezentrum 1
Cycle
Two years in a row, then a one-year break — 2025, 2026, then 2028 and 2029
Exhibitors
Around 550 expected, drawn from process plant and machinery, particle analysis and pharmaceutical production
Visitors
Roughly 10,000 trade visitors — process engineers, production managers, plant designers and technical buyers
Pharma Share
About two thirds of exhibitors will show solutions for the regulated pharmaceutical sector; around three quarters serve chemicals and food
Organiser
NürnbergMesse GmbH, with the APV as honorary sponsor
Alongside
The PARTEC congress on particle technology, plus a Student Day and a Startup Area new for 2026

Why Exhibitors Choose SOL Germany for POWTECH TECHNOPHARM

This is a load-bearing build before it is a design build. A mill, a mixer, a centrifuge or a tablet press is not a display object — it is a machine with a crated weight, a point load under each foot, a three-phase supply, and in most cases a compressed air line. Those numbers set the stand out before any styling decision is available to be made, and the exhibitors who struggle here are the ones who signed off a rendering and then discovered what their machine weighs.

We build in Nuremberg repeatedly across the year and know how the venue's ordering routine behaves under deadline. The stand itself is assembled on our own floor in Frankfurt, photographed for approval, then driven roughly 220 kilometres south. Domestic road freight, no customs file, no border, and a crew who have worked these halls before and know where the goods gates are.

One structural point worth planning around: POWTECH TECHNOPHARM runs two years in a row and then takes a year off. A structure commissioned for 2026 will not see this floor again until 2028. That gap changes the arithmetic on whether you buy a reusable system frame and store it, or build once and write it off.

What you sign is one quote. There is no second invoice arriving three weeks after the show closes.

From Our Project Managers

What We've Learned Building on the POWTECH Floor

Practical notes from the SOL Germany team — the things the exhibitor manual does not tell you.

CD

Floor Loading Is the First Number We Ask For

Not the last. A packaged mixer or a mid-size mill puts its entire mass through four small feet, and a point load will punch through a standard raised platform that would carry the same total weight spread flat. We need the crated weight, the operating weight, the footprint and the foot positions before the design is drawn, because the answer determines whether you get a raised floor at all. Where the load is high we build the machine position directly onto the hall floor and step the platform around it — which looks deliberate if it was planned and looks like a mistake if it was not.

Compressed Air Is a Separate Order, and People Forget It

Almost everyone remembers to order three-phase power. A surprising number of first-time exhibitors get to build-up week before realising that their machine also needs compressed air, that it is ordered from the venue separately from electricity, that it is position-dependent, and that the deadline has passed. We file power, air and water together on the day a contract is signed for exactly this reason.

Running Real Product Means Planning for Dust

A demonstration that mills, sieves or mixes actual material will produce airborne dust, and your neighbours will notice before your visitors do. Extraction, an enclosure, or a closed-loop demo cell has to be designed in rather than improvised on site, and someone has to be able to clean the machine between runs without dismantling the stand around it. We design the access panel for that in advance, because a demo that gets switched off on day two because it cannot be cleaned is an expensive silence.

FACHPACK Is Not Alongside This Time — Plan for a Different Floor

In 2025 POWTECH TECHNOPHARM and FACHPACK ran on the same dates under a single ticket, and a lot of packaging-adjacent traffic crossed between them. That does not repeat in 2026: FACHPACK pauses this year and returns in September 2027. If your 2025 lead numbers were flattered by packaging visitors wandering across, budget and staff for a purer process-engineering audience rather than assuming last edition's footfall mix.

TECHNOPHARM Visitors Read Your Surfaces

Since the pharmaceutical component was reactivated, a substantial share of this floor works to GxP expectations, and that audience assesses a stand the way it assesses a production room. Wipe-clean surfaces, sealed edges, no raw MDF showing at a cut, no visible cable runs across the floor. It is not decoration — a stand that looks like it would fail a hygiene inspection undermines a containment claim before anyone reads the panel.

The Machine Goes In First, and It Arrives Last

Heavy exhibits are delivered late in build-up and need forklift or crane access, which means the build sequence runs backwards from the usual: floor and machine position first, machine in, then walls close around it. If the structure is finished before the machine arrives you are taking a wall apart. We agree the goods-gate slot and the access route with the venue at design stage, and we keep one elevation demountable until the unit is landed.

Transparent Pricing

What a POWTECH TECHNOPHARM Stand Actually Costs

Pricing on this floor follows the engineering rather than the styling. A stand carrying a running machine, a reinforced floor position and a services cluster costs more to build than the same area holding literature and a counter, and that is the honest driver behind the brackets below.

Essential — 9–18 m²

From €4,500
Best for: component and instrumentation suppliers, particle analysis specialists, distributors attending POWTECH for the first time
  • Modular aluminium system frame
  • Backlit fabric back wall, full height
  • One branded reception counter
  • Standard LED top-rail lighting
  • Bench space for a benchtop analyser or sample display
  • Graphics design and print (two revision rounds)
  • Frankfurt → Nuremberg road freight
  • Installation, dismantling and organiser paperwork

Not included: reinforced machine platform, compressed air and power orders, enclosed meeting room.

Premium — 50–100+ m²

From €34,000
Best for: full-line plant manufacturers, exhibitors running several machines, brands treating POWTECH as their flagship
  • Architectural custom build, optional double-decker
  • Multiple enclosed meeting rooms
  • Heavy-load flooring engineered for packaged plant
  • Several machine positions with independent services
  • Extraction or enclosure for a live processing demonstration
  • Hanging sign where the hall permits
  • Technical back-of-house, cleaning access and storage
  • Priority workshop build slot

Not included: floor space rental, rigging and crane fees, AV hire beyond the package, catering.

Recent Builds

Stands We Have Built

Stands delivered across German and European technical trade fairs, including repeat builds at Messe Nürnberg.

A Guide to POWTECH TECHNOPHARM for First-Time Exhibitors

POWTECH TECHNOPHARM is the European exhibition for technologies that process powders, granulates, bulk solids and liquids, and the 2026 edition runs from 29 September to 1 October at the Exhibition Centre Nuremberg. POWTECH first ran in Nuremberg in 1984 alongside the PARTEC congress on particle technology. TECHNOPHARM was reactivated as a fair component in 2025, extending the floor into GxP-compliant production of liquid, semi-solid and solid pharmaceuticals. The organiser is NürnbergMesse, with the APV as honorary sponsor, and expects around 550 exhibitors and 10,000 trade visitors.

Two things about the 2026 edition change how you should plan. The first is that FACHPACK does not run alongside it this year — the two shared dates and a single ticket in 2025, but FACHPACK pauses in 2026 and returns in September 2027, so the visitor mix on this floor is process engineering rather than process plus packaging. The second is the cycle itself: POWTECH TECHNOPHARM runs two years in a row and then takes a year off, so the next edition after 2026 is 2028.

Who Exhibits and What Visitors Actually Want

The floor covers mechanical and thermal processing, particle analysis and measurement, conveying, dosing, mixing, milling, screening, granulating, filling and containment, plus the instrumentation and services around them. Around three quarters of exhibitors serve the chemical and food industries, more than half also work in cosmetics, construction, glass, plastics and rubber, and about two thirds show something for the pharmaceutical sector.

The visitor is a process engineer, a production or plant manager, a project designer or a technical buyer. They arrive with a specific problem — a product that segregates, a yield that drops at scale, a cleaning cycle that eats production hours — and they want to see the machine, watch it run, and ask what happens at year four. That is why so much of this floor runs live equipment, and it is why the engineering decisions on your stand matter more here than the graphic ones.

Stand Size: Choosing Between 9, 18, 24 and 48 Square Metres

Nine square metres works for instrumentation, particle analysis, components and services — anything whose product is benchtop-sized or is essentially a specification. You get a counter, a back wall and standing conversations. What you cannot do at this size is run a floor-standing machine with circulation around it.

Eighteen square metres suits suppliers who need a real display and a proper conversation, and it is the largest footprint we would attempt without a dedicated machine position.

Twenty-four is the threshold at which a running machine becomes practical: enough floor for a reinforced position, the services cluster and a route that lets visitors walk around the unit rather than past it. If you intend to demonstrate anything that mills, mixes or fills, treat 24 m² as the working minimum.

At 48 m² you can carry two machine positions and still hold a private conversation, which matters when a plant manager wants to discuss a project rather than a product. From 80 m² upward a double-decker adds meeting capacity without consuming the ground-floor area that heavy equipment needs — and on this floor ground-floor area is exactly what is scarce.

What a POWTECH TECHNOPHARM Stand Costs by Size

Ranges below are all-in for design, fabrication, graphics, domestic freight, install and dismantle. They exclude the floor space rental you pay to NürnbergMesse, and the power, compressed air and water orders placed with the venue.

  • 9 m² modular: €4,100–€8,700
  • 18 m² modular: €4,800–€10,100
  • 24 m² custom with one reinforced machine position: €11,500–€15,000
  • 30 m² custom with enclosed meeting room: €15,000–€19,000
  • 48 m² custom with two machine positions: €19,000–€26,000
  • 80 m² premium or double-decker: €34,000–€48,000

Common Mistakes, in Order of Frequency

The most common is designing the stand around a rendering and supplying the machine weight afterwards, which means the platform gets re-engineered or abandoned in build-up week. The second is forgetting that compressed air is ordered separately from power, and missing the deadline. The third is planning a live demonstration without planning for dust, extraction or cleaning access, so the machine is switched off by day two. The fourth is assuming 2026 will draw the 2025 footfall mix, when FACHPACK is not running alongside this time. The fifth is finishing the structure before the machine is delivered, which means taking a wall out to get it in. All five are settled at design stage or not at all.

Getting Started

Send your stand size, your hall and stand number if NürnbergMesse has issued it, and the machine list — crated and operating weight, footprint, foot positions, power draw, and whether it needs compressed air or water. Those figures change the design more than anything else you can tell us. You get a 3D design and an itemised all-in quote, at no charge and with no obligation.

Because POWTECH TECHNOPHARM takes a year off after 2026, a reusable system frame makes particular sense here — the structure sits in our Frankfurt warehouse between editions and the next show costs a graphics refresh rather than a rebuild. Our modular exhibition stands are built for exactly that pattern.

FAQ

POWTECH TECHNOPHARM 2026 — Frequently Asked Questions

Real answers with real numbers. Click any question to expand.

When and where is POWTECH TECHNOPHARM 2026?

It runs from 29 September to 1 October 2026 at the Exhibition Centre Nuremberg, organised by NürnbergMesse. The organiser expects around 550 exhibitors and roughly 10,000 trade visitors. The fair runs two years in a row and then pauses for a year, so the following edition is 2028.

Is FACHPACK running alongside POWTECH again in 2026?

No. The two shared dates and a single ticket in 2025, but FACHPACK pauses in 2026 and returns 21–23 September 2027. Plan for a process-engineering audience rather than the combined footfall of the last edition. If packaging visitors mattered to your 2025 result, that is worth reflecting in your target numbers.

How much does a POWTECH TECHNOPHARM stand cost?

From €4,500 to around €48,000 depending on size and engineering. A modular 18 m² sits in the €4,800–€10,100 range. A 24 m² custom stand with one reinforced machine position is typically €11,500–€15,000. A 48 m² with two machine positions runs €19,000–€26,000. Premium and double-decker builds from 80 m² start around €34,000.

What is not included in the price?

Three things. The floor space rental, which is between you and NürnbergMesse. Power, compressed air, water, waste and rigging orders placed with the venue. And specialty add-ons — AV beyond the listed package, furniture beyond the standard set, catering, and staffing during the show.

Can the stand carry a heavy processing machine?

Yes, and it is the normal case here. What we need first is the crated weight, the operating weight, the footprint and the foot positions. Point loads matter more than total mass: a machine putting its weight through four small feet can punch through a platform that would carry the same load spread flat. Where the load is high we build the machine position directly onto the hall floor and step the platform around it.

Do I need compressed air, and how is it ordered?

If your machine is pneumatic in any part, yes. It is ordered from the venue separately from electrical supply, it is position-dependent, and the deadline falls well before build-up. Tell us at briefing stage and we file it alongside the power order on the day the contract is signed.

What about dust from a live demonstration?

It has to be designed for. Depending on the material that means extraction, a partial enclosure, or a closed-loop demo cell. It also means access for cleaning between runs without dismantling anything, which we build in as a removable panel. A demo that cannot be cleaned gets switched off on day two.

Is there customs to pay on the stand?

No. Nuremberg is domestic for us. We build in Frankfurt and drive roughly 220 kilometres south, so there is no customs file and no border on the stand itself. Machinery you ship in from outside the EU is separate and stays with you.

Which hall will I be in?

Hall and stand allocation is set by NürnbergMesse. We design to your confirmed stand number rather than to a previous edition, and we check the hall's floor load limit against your machine before the platform is specified.

Do you handle the organiser paperwork?

Yes — electrical, compressed air, water and waste orders, rigging permissions, goods-gate and forklift slots, waste removal, daily cleaning and crew passes. We file on the day a contract is signed, because the services deadlines fall well before build-up and they are the ones that cannot be recovered late.

How long does install take?

A modular 9–18 m² stand goes up in one shift. A 24–48 m² custom stand with a machine position takes one to two days plus commissioning time for the equipment. Premium builds use the full window. Every stand is pre-assembled at our workshop first, so what happens in Nuremberg is assembly rather than problem-solving.

When does my machine need to arrive?

Late in build-up, and that is fine — but it has to be sequenced. The floor and the machine position go in first, the machine lands, then the walls close around it. If the structure is finished before delivery we are taking an elevation apart to get the unit in. We agree the goods-gate slot with the venue at design stage and keep one elevation demountable.

We work to GxP. Does that change the build?

It changes the specification rather than the shape. Wipe-clean surfaces, sealed edges, no raw board visible at a cut, no cable runs crossing open floor. This audience reads a stand the way it reads a production room, so a containment claim made from a stand that looks unhygienic does not land.

When do I need to lock the design?

For a show at the end of September, early August is comfortable. But the services orders bind earlier than the design does, and the machine data binds earlier still — we need weights and footprints well before the design is final, because they decide what the design can be.

Can I reuse the stand at the next edition?

Yes, if it is built on a system frame. We store the structure in Frankfurt and refresh the graphics. Note that the next edition is 2028, so that is a two-year storage commitment — worth deciding at the outset rather than after the show.

Can you handle a rush build?

Usually, for the structure. What cannot be rushed is the venue services order — power, compressed air and water have fixed deadlines and no builder can move them. That is the single reason to start a POWTECH stand earlier than you would an ordinary show.

Can I visit during pre-build?

Yes, and we encourage it where machinery is involved. The workshop is about fifteen minutes from Frankfurt Airport. You see the stand assembled, check the machine position and service points against your unit's real dimensions, and meet the crew who will be in Nuremberg.

What graphics files do you need?

Vector files for logos and certification marks, and high-resolution raster images at roughly 150 dpi at final print size. For technical schematics, send the source file rather than an export — process diagrams reproduce badly when they are scaled up from a screen-resolution image.

How many staff should I plan for?

On 18 m², two to three. On 24 m² with a running machine, three to four — someone has to stay with the equipment while another person works the aisle. At 48 m² and above, five or more. Process engineers ask long, specific questions, and these conversations run well beyond a typical trade fair exchange.

Do you build at other Nuremberg shows?

Yes — SPS, it-sa, Chillventa, Spielwarenmesse and IWA OutdoorClassics among others. Same crew, same route from Frankfurt. If you exhibit at more than one Nuremberg show in a year we plan them together, which usually means one structure and two graphics sets rather than two builds.

How do I start?

Send your stand size, hall position if you have it, and the machine list including weights, footprint and whether anything needs compressed air. You get a 3D design and a full itemised quote back.

Ready to Exhibit

Get Your POWTECH TECHNOPHARM Stand Design in 48 Hours

Free 3D rendering before contract. One all-inclusive quote with no hidden line items, domestic freight and no customs — with the floor loading, power, compressed air and dust handling settled before the design is drawn.

48hrFree 3D Design
€4,500+All-Inclusive
28 daysTo Show Floor
4.9Trustpilot4.9Google
WhatsApp us
WhatsApp us
Live now