Skip to content
Piscine Global Europe 2026
SOL Germany · Lyon

Exhibition Stand Builder for Piscine Global Europe in Lyon

Stands for Eurexpo Lyon, 17–20 November 2026 — built in our Frankfurt workshop, driven down by road, and installed by our own crew. Planned around what a filled pool, spa or working water feature asks of a stand before anything is styled: load, supply, drainage and a floor that stays dry.

€4,500+From
500+Stands
15 YrsEurope
4.9Trustpilot4.9Google
Browse Designs
SOL Germany exhibition stand built for a pool and spa exhibitor at Eurexpo Lyon
17–20 NOV 2026
Lyon, France
17–20 November 2026Show Dates
Eurexpo LyonVenue
BiennialCycle
GL EventsOrganiser
113 countriesVisitor Origin
Thu to 21:00Late Night
Event Overview

Piscine Global Europe 2026 — What Exhibitors Need to Know

Piscine Global Europe is the pool, spa and wellness industry's main European meeting point, and it runs only every second year. The 2026 edition is at Eurexpo Lyon from 17 to 20 November. What makes it unusual to build for is not the size of the floor but what sits on it: this is one of the few shows in Europe where a large share of stands carry water that is actually in them.

Piscine Global Europe 2026 — At a Glance

Dates
17–20 November 2026 (Tuesday to Friday)
Venue
Eurexpo Lyon, Boulevard de l'Europe, Chassieu — exhibitor access is the Porte Est gate on Avenue Louis Blériot
Cycle
Biennial, in even years. The edition after 2026 falls in 2028
Opening hours
09:00–18:00 Tuesday and Wednesday, 09:00–21:00 Thursday, 09:00–17:00 Friday
Organiser
GL Events Exhibitions, within its Greentech+ portfolio
Reach
At the 2024 edition the organiser recorded international visitors from 113 countries and international exhibitors from 32
Aqualie
Returns on Thursday 19 November 2026 for local authorities, public decision-makers and operators of collective aquatic facilities
Partner
Run with the FPP, the French pool federation, which the organiser states represents more than 1,400 companies

Why Pool and Spa Exhibitors Choose SOL Germany for Lyon

Piscine Global is a services build before it is a design build. On most European trade fairs the first question is what the stand should look like. Here the first question is what is going on it, because a display spa that will be filled, a working filtration rig or a moving water feature changes the floor, the electrics and the drawing before a single graphic is chosen. We start from the equipment schedule and work outwards, which is why our drawings for this show usually arrive with a load note and a services plan attached rather than a mood board.

The build happens in our own Frankfurt workshop and travels to Chassieu by road. Germany and France are both inside the EU customs union and the single market, so there is no customs clearance, no ATA carnet and no import VAT deposit standing between the workshop and the hall — the truck leaves Frankfurt and arrives at the exhibitor gate. That removes the single biggest source of delay we see on stands shipped into France from outside the bloc, and it means a late change to a graphic panel is a courier job rather than a customs problem.

One quote covers the design, the build, the road freight, the install and the dismantle, and it is itemised line by line. Water supply, waste connection and power are ordered through the organiser and appear in that quote at the price the organiser charges, not marked up and not hidden inside a round number. If something genuinely falls outside what we can carry — a vessel that needs a structural engineer's sign-off, for example — we say so during design rather than in the week before the show.

What you sign is one quote. There is no second invoice arriving three weeks after the show closes.

From Our Project Managers

What We've Learned Building Stands With Water On Them

Practical notes from the SOL Germany team — the things the exhibitor manual does not tell you.

CD

A Filled Vessel Is a Dead Load That Never Moves

Water weighs a tonne per cubic metre and it does not shift. A modest display spa holding two thousand litres, plus its shell, surround and steps, stands somewhere over two and a half tonnes on a footprint of roughly two square metres. That is a point load, not a distributed one, and it is the number that matters when you check a hall floor rating. We design a spreader raft under any filled vessel as a matter of course — usually a ply and timber platform that takes the concentrated weight and hands it to the slab across a much wider area. Get the hall's loading figure from the exhibitor manual before the stand is drawn, not after.

Fill and Drain Are Scheduled Events, Not Taps

Filling looks trivial until you try to do it. Two thousand litres through a venue hose is not a five-minute job, and it has to happen while the hall still has vehicle access and while the aisles can carry a hose without becoming a trip hazard. The one people forget is the drain. At the end of the show every filled vessel has to be emptied before dismantle can start, and if the water route was never planned, the stand sits full while the crew waits. We book fill and drain slots into the build schedule the same way we book the crane, and we plan the discharge route at design stage rather than looking for a floor gully on the Friday afternoon.

The Thursday Runs Until Nine at Night

The organiser publishes 09:00 to 21:00 for Thursday 19 November, against 18:00 on the Tuesday and Wednesday and 17:00 on the Friday. That is a twelve-hour trading day, and it catches people out in two ways. A stand staffed by two people cannot cover it without a rota, so plan three shifts rather than two. And lighting specified to read well under the hall's daytime light goes flat once the evening sets in — stands with their own lit elements, backlit fabric and lit product plinths hold up on that Thursday evening while stands relying on ambient hall light do not.

Your Buyer Is Often a Specifier, Not a Purchaser

The floor here is not only distributors and pool builders. Architects, design offices, landscape practices and local-authority technical staff walk it too, and Aqualie on the Thursday brings public decision-makers and operators of collective facilities in deliberately. Specifiers behave differently from buyers. They want sections, tolerances, material data and reference installations, and they want somewhere to open a drawing flat. A table at working height with real chairs earns more on this floor than a tall bar table, and a stand with nowhere to sit loses the longest conversations of the week.

Mid-November in Lyon Means Water Walks In From Outside

The show sits in the middle of November and Lyon is wet at that point in the year. Between the weather at the door and the splash from live water on the floor, the first metre inside a stand takes everything. Light, uniform flooring shows every mark of it by Wednesday morning. Matting at the stand edge, a floor finish that dries rather than stains, and a darker or textured band where the traffic actually lands will keep a stand looking built rather than worn for the full four days.

Biennial Means You Are Buying a 2028 Stand

There is no edition in 2027. Whatever you build in November 2026 either goes into storage for two years or gets written off against four days. That maths favours a reusable system frame far more strongly here than at an annual show — the structure lives in our Frankfurt warehouse between editions, the graphics get reprinted for the next one, and the same frame can go to other European fairs in the gap year rather than sitting idle. Exhibitors who treat a Piscine Global stand as a single-use expense usually regret it when the 2028 invitation arrives.

Transparent Pricing

What a Piscine Global Stand Actually Costs

Pricing at this show follows the services more than the styling. A stand carrying a filled vessel needs a load-bearing platform, a water feed, a drain route and containment, and that engineering costs more than the same floor area holding a display cabinet. The vessel itself is almost always yours — we build the platform it stands on, the supply and discharge that serve it and the containment that keeps the rest of the stand dry. Ranges below are European market ranges for a stand of that size and specification, not a quote for your plot.

Essential — 9–18 m²

From €4,500
Best for: component and accessory suppliers, water-treatment and dosing specialists, distributors exhibiting at Piscine Global for the first time
  • Modular aluminium system frame
  • Backlit fabric back wall, full height
  • One branded reception counter
  • Standard LED top-rail lighting
  • Space for one dry product display
  • Install, dismantle and on-site supervision

Not included: water and waste connections, a load platform for a filled vessel, enclosed meeting room.

Premium — 50 m² and above

From €34,000
Best for: brands taking an island or corner plot, groups presenting several ranges, exhibitors adding a double-decker to buy meeting space above the floor
  • Island or double-decker structure with engineered upper deck
  • Multiple water positions, each with its own load and drainage design
  • Enclosed first-floor or ground-floor meeting rooms
  • Feature lighting designed for the twelve-hour Thursday
  • Full graphics programme across all elevations
  • Dedicated project manager on site for the whole build and show

Not included: structural sign-off where a venue requires it, floor rental, catering, AV hire.

Recent Builds

Stands We Have Built

Stands delivered across German and European trade fairs, including builds that carried live water, working equipment and engineered load platforms.

A Guide to Piscine Global Europe for First-Time Exhibitors

Piscine Global Europe is the leading international trade fair for the pool, spa and wellness industry, and the 2026 edition runs from 17 to 20 November at Eurexpo Lyon in Chassieu. It is organised by GL Events Exhibitions as part of its Greentech+ portfolio and it is held every second year, in even years, which means the edition after this one falls in 2028. It runs in partnership with the FPP, the French pool professionals' federation, which the organiser describes as representing more than 1,400 companies.

What separates it from a general leisure fair is that it gathers the whole chain of one industry in one place: manufacturers of shells, covers, pumps, filtration and dosing equipment alongside the installers, distributors, design offices, landscape practices and public-sector operators who buy from them. That mix is why a stand here has to work on two levels at once — as a product display for people who already know the category, and as a technical consultation space for specifiers who need to check whether something fits a project.

Who Exhibits at Piscine Global and Who Actually Walks the Floor

The exhibitor side spans private and public pool construction, spas and wellness, water treatment and dosing, covers, enclosures and shelters, heating and heat recovery, automation and connected control, and outdoor landscaping around the pool. Some of that is heavy product that has to be craned or wheeled in. Some of it is small, technical and sold on specification sheets. A stand serving both usually needs a display zone that reads from the aisle and a quieter zone where a drawing can be opened.

The visitor side is broader than newcomers expect. Alongside pool builders and distributors there are architects, design offices, hotel and campsite operators, and technical staff from local authorities responsible for public pools. The organiser reported that international visitors at the 2024 edition came from 113 countries, and that international exhibitors came from 32. Aqualie, the strand aimed specifically at collective and public aquatic facilities, returns on Thursday 19 November 2026, and its audience is exactly the kind that arrives with a project rather than a shopping list.

Planning Water on a Stand: Load, Supply, Drainage and Containment

This is the section that matters most and the one most stand briefs skip. If anything on your stand will hold water during the show, four things have to be resolved at design stage rather than during build-up. The first is load. A cubic metre of water is a tonne, and a display spa or demonstration tank concentrates that weight onto a small footprint. We put a spreader platform under any filled vessel so the load reaches the slab spread across a wider area, and we ask for the hall's floor loading figure from the exhibitor technical documentation before finalising the drawing.

The second is supply. Water and waste connections at a venue like Eurexpo are ordered through the organiser's exhibitor services, with their own deadlines, and they are placed where the services grid allows rather than wherever your drawing wants them. The third is discharge, which is the one that bites at the end. Every filled vessel has to be emptied before dismantle can begin, so the drain route belongs in the build programme next to the crane booking. The fourth is containment: splash from a working feature reaches further than people expect, and a floor that puddles is both a slip risk and a bad look by Wednesday. We specify a wet-traffic floor finish and a containment edge on any live position as standard. Where a vessel is large enough that a venue asks for structural sign-off, we will tell you during design and we will not attempt to carry that ourselves.

Stand Size and What It Costs at Eurexpo

Below about 18 square metres, a modular system frame is almost always the right answer. It gives full-height branded walls, clean lighting and a counter, it packs down small enough to travel economically by road from Frankfurt, and it can be reconfigured for the next show rather than skipped. Nine to eighteen square metres suits component suppliers, dosing and treatment specialists and first-time exhibitors testing whether the show works for them, and it starts from around €4,500 all in.

From 24 square metres upward the calculation changes, mainly because that is the point at which live water and a seated meeting area both become realistic. A 24 square metre custom stand with one engineered water position typically lands between €11,500 and €15,500; 48 square metres with two water positions runs between €19,000 and €26,000. At 50 square metres and above, and particularly on island plots, a double-decker starts to make sense because it buys enclosed meeting space without spending floor area — those builds begin at €34,000. Floor rental, organiser service charges, catering and the vessels or equipment themselves sit outside all of these figures, and we list them as exclusions rather than letting them surface later.

Common Mistakes, in Order of Frequency

The most common is treating water as a late addition. A stand designed dry and then asked to carry a filled spa two weeks before the show ends up with a platform that does not fit the graphics, a hose crossing an aisle and a drain plan invented on the day. The second is staffing the Thursday like the other three days — a twelve-hour trading day with the Aqualie audience on the floor needs a rota, not goodwill. The third is lighting the stand for daylight only, which reads flat from about five in the afternoon on that same Thursday.

The fourth is designing without anywhere to sit. Specifiers hold long conversations and they need a surface to open a drawing on; a stand built entirely around standing display loses those. The fifth is buying a single-use stand for a biennial show, which is a two-year write-off with nothing between. The sixth, and the cheapest to avoid, is leaving the floor finish to last: pale, uniform flooring in a wet November hall with live water on the stand looks tired long before Friday.

Getting Started

The useful sequence is plot first, equipment schedule second, drawing third. Once you know your stand number, its dimensions and whether it is inline, corner or island, and once you can tell us what will be on it and whether any of it holds water, we can produce a 3D design and an itemised quote quickly. If your plot is not confirmed yet we can still design to a size and adjust when it is.

We build in our Frankfurt workshop and drive to Chassieu, so there is no customs stage and no carnet in the schedule. A comfortable timeline is around twelve weeks from brief to show for a custom stand with water on it, and less for a modular build, but we have delivered faster when the plot came late.

Because Piscine Global runs only in even years, a reusable system frame is a particularly sensible purchase here — the structure stays in our Frankfurt warehouse between editions, travels to other European fairs during the gap year, and returns to Lyon in 2028 with new graphics. Our modular exhibition stands are built for exactly that pattern of reuse.

FAQ

Piscine Global Europe 2026 — Frequently Asked Questions

Real answers with real numbers. Click any question to expand.

When and where is Piscine Global Europe 2026?

It runs from Tuesday 17 to Friday 20 November 2026 at Eurexpo Lyon in Chassieu, just east of Lyon. The organiser is GL Events Exhibitions. Opening hours are 09:00 to 18:00 on the Tuesday and Wednesday, 09:00 to 21:00 on the Thursday, and 09:00 to 17:00 on the Friday.

Is Piscine Global held every year?

No. It is biennial and falls in even years, so the edition after November 2026 is in 2028. That two-year gap is worth planning around: a stand built for 2026 either goes into storage for two years or gets written off against four days, which is why we push reusable structures harder at this show than at annual fairs.

Can you support water features and working equipment on our stand?

Yes, and it is the part of this show we plan first. We design the load platform that carries a filled vessel, the supply and discharge routes that serve it, and the containment and floor finish that keep the rest of the stand dry. We also book the fill and drain windows into the build programme. What we do not supply is the vessel or the equipment itself — that comes from you — and where a venue requires structural sign-off for something unusually large, we will say so during design rather than later.

How much does a stand at Piscine Global cost?

A 9 to 18 square metre modular stand starts from around €4,500 all in. A 24 square metre custom stand with one engineered water position typically runs €11,500 to €15,500, and 48 square metres with two water positions runs €19,000 to €26,000. Premium and double-decker builds from 50 square metres upward start at €34,000. Floor rental, organiser service charges and your own equipment are not included in those figures.

Do you handle customs for a stand travelling from Germany to France?

There is no customs stage to handle. Germany and France are both in the EU customs union and single market, so the stand travels from our Frankfurt workshop to Chassieu as domestic road freight — no clearance, no ATA carnet, no import VAT deposit. Practically, that means a replacement graphic panel can be couriered mid-build rather than becoming a border problem. VAT treatment of the invoice itself is worth checking with your own accountant, since that depends on your registration rather than on the freight.

How long does it take to get a design?

We produce a 3D rendering within 48 hours of receiving your brief, and it is free and comes before any contract. For a stand with water on it we send a load and services note alongside the visual, because those two things constrain the design and it is better to see them together.

Which hall will we be in?

Hall and stand allocation comes from the organiser with the floor plan, not from us, and it is worth having before the design is finalised because the services grid and the aisle position both affect the layout. Send us the stand number and dimensions as soon as you have them and we will design to the actual plot rather than to a generic rectangle.

What are the opening hours, and does the Thursday really run to nine at night?

It does. The organiser publishes 09:00 to 21:00 for Thursday 19 November, against 18:00 on the Tuesday and Wednesday and 17:00 on the Friday. It is a twelve-hour trading day and it needs three staffing shifts rather than two, plus lighting that works after dark rather than relying on the hall's daytime light.

What is Aqualie and should it change how we plan the stand?

Aqualie is the strand aimed at local authorities, public decision-makers and operators of collective aquatic facilities, and the organiser has it returning on Thursday 19 November 2026. If public and municipal pools are a market for you, that is the day to have your technical people on the stand and to have specification documents, sections and reference installations to hand — this audience arrives with projects rather than shopping lists.

Modular or custom for a pool and spa stand?

Modular up to about 18 square metres, custom from 24 upward, and the deciding factor is usually water rather than size. A modular frame handles branded walls, lighting and a counter very well, but an engineered water position with a load platform, a drain route and containment is a custom job. If you are showing dry product and literature, modular is the better value; if something is going to be filled, expect a custom build.

Do we bring our own pool or spa, or can you build one?

You bring it. Your product is the reason people stop, and we would not substitute a built mock-up for the real thing. What we build is everything the vessel needs in order to be there safely: the platform that spreads its weight, the surround and steps that make it approachable, the supply and drainage, and the containment that keeps the floor dry.

Who arranges the water connection and drainage?

We do, through the organiser's exhibitor services, and it appears in your quote at the price the organiser charges. These orders have their own deadlines and the connection points sit where the venue's services grid allows rather than wherever the drawing would prefer, which is exactly why the position of a water feature is a design-stage decision rather than a build-week one.

How heavy is a filled spa, and will the floor take it?

Water is a tonne per cubic metre, so a two-thousand-litre display spa plus its shell, surround and steps is comfortably over two and a half tonnes standing on roughly two square metres. That is a concentrated point load. We design a spreader platform under any filled vessel so the weight reaches the slab across a wider area, and we check the design against the hall's published floor loading figure from the exhibitor technical documentation before we finalise it.

What happens to the water at the end of the show?

It has to be discharged before dismantle can start, which is why we plan the drain route at design stage and book a drain window in the build programme. Stands that leave this to the Friday afternoon sit full while the crew waits, and that delay pushes the whole dismantle back. Discharge is to the venue's designated point, following whatever the exhibitor manual specifies for treated water.

Do you handle the graphics as well?

Yes. Design, print and application are part of the build, and we work from your brand guidelines or develop artwork from scratch. On a show this technical it is worth keeping the aisle-facing graphics simple and putting the detail into printed material at the meeting table, because specifiers read rather than scan.

Can we reuse the stand at the 2028 edition or at other shows?

That is the whole argument for a system frame at a biennial show. The structure stores in our Frankfurt warehouse between editions, graphics are reprinted rather than the frame rebuilt, and the same components can be reconfigured for other European fairs during the gap year. We keep an inventory record of what belongs to each client so a rebuild starts from what you already own.

What is not included in your quote?

Floor rental paid to the organiser, organiser service charges, catering, AV hire, your own equipment and vessels, and any structural sign-off a venue requires for an unusually large or high element. Everything we do include is itemised line by line, and if a line is missing we tell you before you sign rather than after the show.

How far in advance should we book?

Around twelve weeks from brief to show is comfortable for a custom stand with water on it, because the load platform and services need to be resolved before fabrication starts. A modular build needs less. We have delivered faster where a plot was confirmed late, but the water elements are the part that does not compress well.

Do you work in French on site?

Our crews work across Europe and installation at a French venue is routine for us. Project communication runs in English, German, French or Spanish depending on what suits you, and site coordination with the venue and the organiser is handled by us rather than left to you.

What if our stand is a corner or island plot?

It changes the design more than most exhibitors expect. A corner plot gives two open sides, which means the back wall carrying your main graphic gets shorter and the layout has to be readable from two directions. An island has no back wall at all, so branding moves up into hanging or built elements and the water position usually moves to the centre where it can be seen from every aisle. Tell us the plot type with the dimensions and we will design for it rather than adapting an inline layout.

Ready to Exhibit

Get Your Piscine Global Stand Design in 48 Hours

Free 3D rendering before contract. One itemised quote with domestic road freight and no customs stage — with the load, supply and drainage for anything holding water planned before the stand is drawn.

48hrFree 3D Design
€4,500+All-Inclusive
28 daysTo Show Floor
4.9Trustpilot4.9Google
WhatsApp us
WhatsApp us
Live now