Skip to content
Internorga 2027
SOL Germany · Hamburg

Exhibition Stand Builder for Internorga 2027 in Hamburg

Stands for Hamburg Messe und Congress, 12–16 March 2027 — built in our Frankfurt workshop and installed by our own crew. Designed around the one thing that separates this floor from every other show we build: your stand has to cook, chill and serve for five consecutive days.

€4,500+From
500+Stands
15 YrsEurope
4.9Trustpilot4.9Google
Browse Designs
Internorga 2027 stand builder in Hamburg — SOL Germany foodservice stand with a plumbed sampling counter
12–16 MAR 2027
Hamburg, Germany
12–16 March 2027Show Dates
Hamburg MesseVenue
5 DaysDuration
10:00–18:00Daily
Hamburg Messe und CongressOrganiser
AnnualCycle
Event Overview

Internorga 2027 — Everything You Need to Know

Internorga is the annual meeting point for the European out-of-home market: hotels, restaurants, canteens, bakeries, patisseries and the equipment and ingredient suppliers who serve them. It is also, for a stand builder, one of the most technically demanding floors in Germany, because a large share of the stands are working kitchens.

Internorga 2027 — At a Glance

Dates
12–16 March 2027 — Friday through Tuesday, five days including a full weekend
Venue
Hamburg Messe und Congress, Messeplatz 1, 20357 Hamburg
Opening hours
Daily 10:00 to 18:00
Organiser
Hamburg Messe und Congress GmbH, who also run the venue itself
Cycle
Annual. The 2026 edition ran 13–17 March 2026 and has already closed
Exhibition areas
Digital Solutions; Kitchen Technology & Equipment; Food & Beverage; Packaging & Delivery; Living & Dining; Startups & Drinks
Trend areas
AI AREA, Future Food, Newcomers Area, Skywalk Table and WeinWelt
Programme
International Foodservice Forum and the Branchentag der Gemeinschaftsgastronomie, alongside the INTERNORGA Future Award, the Next Chef Award and the Deutscher Gastro-Gründerpreis
Backing
Supported by the regional DEHOGA hospitality associations, which is part of why the German independent-operator turnout is so heavy

Why Foodservice Exhibitors Choose SOL Germany for Internorga

Hamburg is domestic freight for us. The stand is built and fully assembled on our own floor in Frankfurt, photographed for your approval, then driven roughly 490 kilometres north. No customs file, no border, no carnet, no broker. Our own crew unloads and installs it, which matters more than usual at a show where the stand contains equipment that has to work on the Friday morning.

A foodservice stand is not a display stand with a coffee machine added at the end. Water supply, waste water, three-phase power, extraction, hygiene-compliant surfaces and a spill-tolerant floor are structural decisions that have to be made at design stage, in that order, before anyone chooses a colour. We quote them as line items from the first drawing rather than discovering them in week six.

March in Hamburg is cold and wet, and build-up runs through the week before the show. That is a scheduling reality, not a complaint: it means the commissioning of your equipment — the point at which somebody turns the water on and finds out whether the drain runs — needs to happen with a day in hand, not on the last afternoon.

What you sign is one quote. There is no second invoice arriving three weeks after the show closes.

From Our Project Managers

What We've Learned Building Working Kitchens at Internorga

Practical notes from the SOL Germany team — the things the exhibitor manual states but does not explain.

CD

Your Refrigeration Needs 24-Hour Power, Not Show-Hour Power

This is the most expensive avoidable mistake on this floor and we see it every year. The standard electrical order from the venue supplies power during show hours. Order that and your chillers, freezers and display cabinets go dark when the hall shuts, and everything in them warms up overnight for four nights running. You need a separate, explicitly specified 24-hour supply on its own circuit for anything holding food. It costs more, it has to be ordered early, and it is not the default. Check the line on the order form yourself; do not assume it was included because you mentioned a fridge.

You Design the Kitchen Around the Drain, Not the Drain Around the Kitchen

Water supply and waste water come out of fixed points in the hall floor. Your stand position determines where they are, and they do not move. So the sink, the dishwasher, the ice machine and the coffee unit are placed first, and the rest of the layout arranges itself around them. Exhibitors who design a beautiful stand and then ask where the plumbing goes end up with a service run cut diagonally across their own floor, or a waste pump they did not budget for. Send us your stand number the day you get it and we start from the connection points.

Friday to Tuesday Is Five Days, and Two of Them Are a Weekend

Internorga runs Friday through Tuesday. Most German trade fairs run three weekdays. That difference is not a detail — it changes your consumables order by roughly two-thirds, it puts weekend rates on your stand staff, and it means whoever is standing there on Sunday afternoon is on day three of a five-day shift. Plan a genuine rota rather than a heroic one. It also affects the stand itself: five days of service wear on a counter edge and a floor is visibly different from three, which is a reason to specify harder surfaces than you would for a short show.

Hot Equipment Means Three-Phase, and the Load Calculation Nobody Does

A combi oven, an induction hob, a professional dishwasher or a two-group espresso machine will not run off a single-phase 230-volt socket. They need a 400-volt three-phase CEE supply, correctly sized. The failure mode is not that nothing works — it is that everything works until the moment your chef switches on the second appliance and the whole stand trips, usually in front of an audience. Send us the actual nameplate ratings of every appliance you intend to bring, including the ones your marketing team added late. We total them, add headroom, and order to that figure.

The Queue Has to Live Inside Your Own Footprint

Sampling works, which is the problem. A good product at a busy show generates a line, and if that line forms in the aisle you will have a conversation with the hall manager, usually on the first morning. The fix is a design decision, not a show-day one: set the serving counter back from the aisle edge, angle it so people queue along your own frontage rather than across it, and give the queue somewhere to stand that is yours. On a nine or eighteen square metre stand this is the single hardest constraint to solve, and it is worth solving on paper before you commit to the size.

The Cold Chain Arrives After the Aisles Have Already Cleared

On the last day of build-up the organiser requires all hall aisles to be clear from 15:00, and exhibit deliveries and any dust-generating work stop at the same time. Fresh stock, obviously, cannot come in days early. So the sequence is: finish all construction, cleaning and dust work well before that cut-off, get your equipment commissioned and running cold, and bring perishables in through the last permitted window or on the show morning. Halls lock at 22:00 as a general rule, and working past that needs the hall manager notified twelve hours in advance. Plan for it; do not discover it.

Transparent Pricing

What an Internorga Stand Actually Costs

On most floors the price is driven by size and finish. Here it is driven by whether the stand has to serve food, and how hot that food is. A cold sampling counter is close to a standard build. A working demonstration kitchen with extraction and a plumbed sink is a different piece of construction, and we price it as one.

Essential — 9–18 m²

From €4,500
Best for: start-ups, regional producers and single-product suppliers sampling cold or ambient
  • Modular aluminium system frame
  • Backlit fabric back wall, full height
  • Branded serving counter with cold storage below
  • Washable, sealed, non-slip flooring rather than carpet
  • Standard LED top-rail lighting
  • Graphics design and print (two revision rounds)
  • Frankfurt to Hamburg road freight
  • Installation, dismantling and organiser paperwork

Not included: water and waste connections, three-phase power, hot cooking equipment, extraction. Add-ons quoted line by line.

Premium — 50–100+ m²

From €34,000
Best for: kitchen technology manufacturers, group operators and hosted-programme exhibitors
  • Architectural custom build, optional double-decker
  • Full demonstration kitchen with a public-facing cooking line
  • Seated tasting area, bar or counter service
  • Meeting rooms upstairs or enclosed at ground level
  • Heavy-duty flooring and load-rated equipment platforms
  • Full AV package for the demo counter, including overhead camera and screen
  • Technical back-of-house, cold room and daily waste handling
  • Priority workshop build slot

Not included: floor space rental, rigging fees, appliance hire beyond the package, chefs and front-of-house staff.

Recent Builds

Stands We Have Built

Stands delivered across German and European events, including builds where the stand had to serve food for the duration of the show.

A Guide to Internorga for First-Time Exhibitors

Internorga is the annual platform for the European hospitality and foodservice market, and the 2027 edition runs 12–16 March 2027 at Hamburg Messe und Congress, daily from 10:00 to 18:00. It is organised by Hamburg Messe und Congress GmbH, who also operate the venue. The exhibition splits into Digital Solutions, Kitchen Technology & Equipment, Food & Beverage, Packaging & Delivery, Living & Dining, and Startups & Drinks, with separate trend areas including the AI AREA, Future Food, the Newcomers Area, the Skywalk Table and WeinWelt.

Around the exhibition sits a substantial programme: the International Foodservice Forum, the Branchentag der Gemeinschaftsgastronomie, and competitions including the INTERNORGA Future Award, the Next Chef Award and the Deutscher Gastro-Gründerpreis. The show is supported by the regional DEHOGA hospitality associations, which is a large part of why the audience skews so heavily towards German independent operators alongside the international buyers.

Who Exhibits at Internorga and What Visitors Want

The floor is a mix of two quite different exhibitor types, and they need opposite things from a stand. On one side are food and beverage producers, whose entire proposition can be handed to a visitor in a paper cup. On the other are equipment manufacturers — ovens, refrigeration, dishwashing, coffee, point-of-sale, and increasingly robotics and kitchen software — whose proposition is a machine that has to be seen running under something like real conditions.

The visitor is usually an operator: a restaurateur, a hotel F&B manager, a baker, a canteen or contract-catering buyer, a franchise operations lead. They are not researching a category from scratch. They arrive with a specific problem — a labour shortage, an energy bill, a menu that no longer works at the current food cost, a piece of equipment that keeps failing — and they are looking at whether your thing solves it in their kitchen, at their volume, with the staff they can actually hire.

That has a direct design consequence. Abstract claims do very little on this floor. What works is proof at close range: the machine running, the product tasted, the process visible. Everything else on the stand exists to support that moment or to give somebody somewhere to stand while they wait for it.

Building a Stand That Can Actually Cook and Serve

This is the section that separates an Internorga stand from a normal one, and it is worth reading properly if you have never exhibited at a foodservice show. There are five technical questions, and they are decided in this order, before aesthetics.

First, power. Anything that heats or chills seriously needs 400-volt three-phase supply, correctly sized to the total connected load of everything you are bringing. Anything that holds food needs a separate 24-hour circuit so it keeps running overnight. Both are ordered from the venue, both cost more than the default show-hours single-phase supply, and both have deadlines well before build-up.

Second, water. Fresh water supply and waste water are drawn from fixed points in the hall floor determined by your stand position. If the sink is far from the connection you either accept a long service run under a raised floor or you add a waste pump. Neither is a problem if it is designed in; both are expensive if they are discovered.

Third, hygiene. If you are handling open food, the stand needs surfaces that can genuinely be cleaned: sealed and coved joints rather than open seams, a dedicated hand-wash basin with hot water separate from the vessel sink, covered storage, and refrigeration that holds temperature under hall conditions rather than domestic ones. This is not a formality — food handling at German trade fairs is inspectable, and a stand that cannot be cleaned is a stand that can be stopped.

Fourth, extraction and fire. A visible cooking line with an open heat source generally needs extraction above it and appropriate fire measures, and outdoor stands and gas appliances sit under separate rules again. Decide early whether you are cooking in public or plating something prepared behind a screen, because the two answers produce different stands at different prices.

Fifth, the floor. Carpet under a serving counter looks fine on the Friday and looks like a mistake by the Sunday. Sealed vinyl or a comparable washable, non-slip surface with a coved edge takes spillage, takes cleaning, and still photographs well on the last day.

Stand Size: 9, 18, 24, 45 and 80 Square Metres for a Working Kitchen

Nine square metres is workable at Internorga only for cold or ambient sampling — a counter, cold storage below, a back wall and standing conversation. It will not hold a cooking line, and it will not comfortably hold a queue. Treat it as a first outing to test whether the audience is yours.

Eighteen square metres is the realistic minimum for a stand with any service depth. You get a serving front, a small back area for stock and waste, and enough setback that a short queue forms on your own floor rather than in the aisle.

Twenty-four is where the stand changes character, because it is the first size that carries a plumbed prep area and a screened back-of-house alongside an open serving front. For a producer sampling all day, that back area is what keeps the stand looking presentable on day four.

Forty-five square metres supports a genuine demonstration kitchen with extraction, a cooking line the public can see, and seating for a short tasting. This is the size most equipment manufacturers land on. From eighty square metres upward a double-decker is worth pricing, because meetings and back-of-house move upstairs and the whole ground floor stays available for the thing people came to watch.

What an Internorga Stand Costs by Size

Ranges below are all-in for design, fabrication, graphics, domestic road freight, installation and dismantle. They exclude the floor space rental you pay to Hamburg Messe und Congress and any orders placed with the venue, including the electrical and plumbing connections described above.

  • 9 m² modular with cold sampling counter: €4,100–€8,700
  • 18 m² modular with cold sampling counter and stock area: €4,800–€10,100
  • 24 m² custom with plumbed prep area: €11,500–€15,000
  • 30 m² custom with enclosed back-of-house kitchen: €15,000–€19,000
  • 48 m² custom demonstration kitchen with extraction: €19,000–€26,000
  • 80 m² premium or double-decker: €34,000–€48,000

Common Mistakes, in Order of Frequency

First and most costly: ordering show-hours power and losing the contents of the chillers overnight. Second: designing the layout before knowing where the water and waste connections are, then paying for a pump or a diagonal service run. Third: under-sizing the electrical order because the appliance list grew after it was submitted. Fourth: laying carpet in a service zone. Fifth: sizing the stand for the people you want to serve rather than for the queue they will form, so the aisle blocks and the hall manager intervenes on the first morning. Sixth: staffing a five-day show as though it were a three-day one, and running out of both consumables and people by Sunday. Every one of these is a decision made weeks before the show, which is the good news.

Getting Started

Send your stand size, your hall and stand number once Hamburg Messe und Congress has issued it, and a list of every appliance you intend to bring with its nameplate rating. Tell us whether you are cooking in public or serving something prepared out of sight. You get a 3D design and an itemised all-in quote, at no charge and with no obligation. If a small local Hamburg builder is genuinely the better answer for a nine square metre cold-sampling stand, we will tell you that instead.

Internorga is annual, and most foodservice exhibitors here also attend one or two other European events in the same year, so a reusable system frame is usually the better purchase — the structure stays in our Frankfurt warehouse and each show costs a graphics refresh and a service-area reconfiguration rather than a rebuild. Our modular exhibition stands are designed for exactly that pattern.

FAQ

Internorga 2027 — Frequently Asked Questions

Real answers with real numbers. Click any question to expand.

When and where is Internorga 2027?

Internorga 2027 runs 12–16 March 2027 at Hamburg Messe und Congress, Messeplatz 1, 20357 Hamburg, daily from 10:00 to 18:00. It is a five-day show running Friday through Tuesday, and it is organised by Hamburg Messe und Congress GmbH.

Can the stand support food sampling?

Yes, and it is what most of our Internorga stands are built for. Cold or ambient sampling needs a counter with refrigerated storage below it, a washable sealed floor, covered stock storage and a waste route. Hot sampling adds three-phase power, extraction over the cooking line, a plumbed sink and a separate hand-wash basin with hot water. Tell us which of the two you are doing at briefing stage, because it changes the construction rather than the decoration.

How much does an Internorga stand cost?

From €4,500 up to around €48,000 depending on size and on how much of a working kitchen you need. A modular 18 m² sampling stand sits in the €4,800–€10,100 range. A 24 m² custom stand with a plumbed prep area is typically €11,500–€15,500. A 48 m² demonstration kitchen with extraction runs €20,000–€27,000. Premium and double-decker builds from 80 m² start around €34,000.

What is not included in the price?

Three things. The floor space rental, which is between you and Hamburg Messe und Congress. The venue's own service orders — the electrical supply, the water and waste connections, rigging, waste removal. And anything you hire rather than build: appliances, additional AV, catering staff, furniture beyond the listed set.

Do I need 24-hour power for my refrigeration?

Yes, and this is the single most common expensive mistake at this show. The default electrical order runs during show hours only. Anything holding food — chillers, freezers, display cabinets — needs its own explicitly ordered 24-hour circuit, or it switches off when the hall closes and warms up for four consecutive nights. It is a separate line on the venue's order form and it has an early deadline.

What power supply do commercial appliances need?

Combi ovens, induction hobs, professional dishwashers and multi-group espresso machines need a 400-volt three-phase CEE supply, sized to the total connected load. Send us the nameplate rating of every appliance you plan to bring — including any added late — and we total them, add headroom and order to that. The usual failure is not a dead stand but a stand that trips the moment the second appliance is switched on.

Can you connect water and waste water to the stand?

Yes. Supply and drainage come from fixed points in the hall floor set by your stand position, so we place the sink, dishwasher and coffee unit relative to those points first and lay the rest of the stand out around them. If the run is long we either raise the floor to carry it or specify a waste pump, and either way it is quoted before you sign.

What hygiene requirements does a food stand have to meet?

In practical terms: sealed and coved surfaces in the service zone so joints can be cleaned, a dedicated hand-wash basin with hot water separate from the vessel sink, covered storage for open product, refrigeration that holds temperature under hall conditions, and a daily waste route. We build to that standard as default on any stand handling open food. Your own food-safety documentation and staff hygiene training remain yours.

Can we cook in the open on the stand?

Usually yes, with extraction above the cooking line and the appropriate fire measures, though the specifics depend on the appliance and the hall. Gas appliances and outdoor stands sit under separate rules. Decide early whether you want a visible cooking line or a screened prep area with plated service, because they produce genuinely different stands at different prices.

Is there customs to pay on the stand?

No. Hamburg is domestic for us. We build in Frankfurt and drive roughly 490 kilometres north, so there is no customs file, no carnet and no border on the stand itself. Anything you import separately — product, appliances from outside the EU — is a separate question and we can point you at a broker.

Why does the show run over a weekend?

Internorga has run Friday to Tuesday for years, and it reflects the audience: restaurateurs, hoteliers and bakers cannot easily leave their businesses midweek. The consequences for you are practical rather than mysterious — larger consumables order, weekend staffing rates, a genuine five-day rota, and a stand that has to still look presentable on the Tuesday.

How many staff should I plan for?

On 18 m² with continuous sampling, three per shift and enough people to rotate across five days. On 24–48 m² with a cooking line, four to six, of whom at least one is a chef rather than a salesperson. Above 48 m², more. The mistake is not the headcount on day one, it is the absence of a rota by day four.

Which hall will I be in?

Hall and stand allocation is set by Hamburg Messe und Congress. Send us your stand number as soon as it is issued, because on this floor it determines the position of your water and waste connections and therefore your whole layout, not just which sides are open.

Do you handle the organiser paperwork?

Yes — electrical and plumbing orders, rigging permissions, waste removal, daily cleaning, crew passes and any application for early assembly or extended dismantling. We file on the day a contract is signed, because the deadlines fall well before build-up and the utility orders are the ones with the least slack.

How long does the build take?

A modular 9–18 m² sampling stand goes up in one shift. A 24–48 m² custom stand with plumbing and extraction takes two to three days, because the services have to be run, connected and tested rather than just assembled. Premium builds use the full window. Every stand is pre-assembled in our Frankfurt workshop first, so the hall build repeats a build the crew has already done once.

When do I need to lock the design?

For a mid-March show, late November is comfortable and mid-December is workable. Stands with plumbing, extraction or a cooking line need the earlier end of that, because the venue's utility orders and the joinery both need lead time. Leaving it to January is possible but it removes your ability to change your mind.

What happens on the last day of build-up?

The organiser requires all hall aisles to be clear from 15:00 on the final build-up day, and exhibit deliveries and dust-generating work stop at the same point. Halls lock at 22:00 as a general rule and working later needs the hall manager notified twelve hours in advance. For a food stand that means construction and cleaning finish early, equipment is commissioned and running cold before the cut-off, and perishables come in last.

Can I visit during pre-build?

Yes, and for a kitchen stand we actively recommend it. The workshop is about fifteen minutes from Frankfurt Airport. You see the stand assembled, stand behind the counter where your staff will stand, find out that the pass-through is six centimetres too narrow, and we change it there rather than in Hamburg.

Can I reuse the stand at other shows?

Yes, if it is built on a system frame. We store the structure in our Frankfurt warehouse between events and refresh the graphics per show. The service core — counter, sink, refrigeration housing — is the most reusable element you can buy, because the requirement repeats at every food and hospitality event you attend.

What graphics files do you need?

Vector files for logos and any certification marks, and high-resolution raster images at roughly 150 dpi at final print size. For food photography in particular, send the original files rather than anything already compressed for web — a hero product shot printed at wall size is unforgiving of a low-resolution source.

Do you build at other Hamburg shows?

Yes — SMM and WindEnergy Hamburg among them, at the same venue. Same crew, same route north from Frankfurt, which is part of why our Hamburg scheduling is predictable.

How do I start?

Send your stand size, your stand number if you have it, your appliance list with nameplate ratings, and whether you are cooking in public. You get a 3D design and a full itemised quote back.

Ready to Exhibit

Get Your Internorga Stand Design in 48 Hours

Free 3D rendering before contract. One all-inclusive quote with the power, water and extraction priced as line items rather than discovered later — domestic freight, no customs, and a stand built to serve food for five days rather than three.

48hrFree 3D Design
€4,500+All-Inclusive
28 daysTo Show Floor
4.9Trustpilot4.9Google
WhatsApp us
WhatsApp us