Skip to content
IMCAS World 2027
SOL Germany · Paris

Aesthetic-Medicine Stand Builder for IMCAS World Congress in Paris

Stands for the Palais des Congrès de Paris, 28–30 January 2027 — built and dry-assembled in our Frankfurt workshop, driven down by road, installed by our own crew. Specified around the three things an aesthetics audience actually judges: light, finish, and whether a private conversation can happen without leaving the stand.

€4,500+From
500+Stands
15 YrsEurope
4.9Trustpilot4.9Google
Browse Designs
SOL Germany exhibition stand for an aesthetic medicine exhibitor at the Palais des Congrès de Paris
28–30 JAN 2027
Paris, France
28–30 January 2027Congress Dates
Palais des CongrèsVenue
AnnualCycle
Paris & OnlineFormat
IMCASOrganiser
Priority PointsSpace Booking
Event Overview

IMCAS World 2027 — What Exhibitors Need to Know

IMCAS is a scientific congress with a commercial floor attached, and the person who walks onto your stand is usually the person who signs. That single fact shapes the brief more than the venue does.

IMCAS World 2027 — At a Glance

Dates
28–30 January 2027, Thursday to Saturday. INVEST by IMCAS, the executive and investor day, runs on 27 January — senior visitors are in Paris before the exhibition opens.
Venue
Palais des Congrès de Paris, Porte Maillot. A congress centre with exhibition levels rather than a flat drive-in hall, which changes how a stand has to be engineered.
Cycle
Annual, in Paris each January. The Americas, Asia and China editions are separate congresses in other cities and are not covered by this page.
Format
Paris and online. The organiser runs the congress as a hybrid, so a share of your audience never enters the building and only ever sees the stand through a camera.
Audience
Dermatologists, plastic surgeons, aesthetic physicians and clinic owners — clinicians who are also the purchasing decision, not the first step toward one.
Scale
The organiser's own projection for 2027 is more than 20,000 participants.
Organiser
IMCAS — International Master Course on Aging Science.
Space booking
Released through the organiser's priority point system, which sets the date on which you are permitted to book. Returning exhibitors book before newcomers do.

Why Exhibitors Choose SOL Germany for IMCAS World

IMCAS is a finish build before it is anything else. This audience spends its working life selling perfection in a mirror, and it reads a stand the way it reads a clinic — the join where two panels meet, whether an edge is closed or raw, whether the counter front still looks clean at four in the afternoon on day two. A stand that would pass without comment at an engineering fair in Nuremberg looks unfinished on this floor. We specify low-sheen surfaces, closed corner joints, and a lighting scheme built for skin rather than for signage, and those decisions appear as named lines on the quote so you can see what you are paying for.

The build discipline comes from the building. A congress centre is served by lifts and service corridors rather than a hall door you can reverse a truck through, so the stand is engineered in the workshop to arrive in pieces that fit those lifts and go together with a driver rather than a saw. Cutting on site inside a congress centre is slow where it is allowed at all. Everything is dry-assembled on our own floor in Frankfurt and photographed before it is loaded, so the first time the stand stands up is not on the exhibition level at midnight.

Freight from Frankfurt to Paris is a road movement inside the single market — no customs entry, no carnet, no broker, no clearance window that can slip and take your build-up slot with it. That covers the stand. It does not cover your product if it ships from outside the EU, and on this floor a large share of it does. Which of those two problems is ours and which is yours is written down before you sign, not discovered in January.

One quote covers design, build, road freight, installation, dismantling, and the lighting and finish specification. There is no second invoice three weeks after the congress closes.

From Our Project Managers

What We Have Learned Building Aesthetic-Medicine Congresses

Notes from the SOL Germany team — the parts the exhibitor manual leaves out.

CD

Your Footprint Is Decided Before Your Design Is

Space at IMCAS is released through a priority point system, which means the organiser tells you when you may book rather than you choosing when to buy. Returning exhibitors book first. The practical consequence is that a first-time exhibitor often ends up with a footprint and a position they did not choose, and then commissions a design for it. Do it in that order deliberately. Get the space confirmed, send us the exact dimensions and the open sides, and let the design answer the plot you actually hold instead of the plot you hoped for.

Light Is the Product, Not the Decoration

Every other exhibitor on this floor is selling something judged on skin — a filler, a toxin, an energy device, a cosmeceutical line. If your lighting renders skin badly, your before-and-after photography renders badly, and a visitor who works with faces all day will notice before you do. We build these stands on neutral-white, high colour-rendering fixtures and keep coloured wash away from any surface where product imagery or a demonstration head sits. It costs slightly more than a standard top rail and it is the least negotiable line on the quote.

Clinic Tolerances, Not Trade-Fair Tolerances

The finish standard here is higher than almost anywhere else we build. Visible fixings, a proud screw head, a panel gap you would never notice at a components fair — on this floor they read as a claim about how carefully you make the thing you are selling. We close edges, we specify surfaces that do not hold fingerprints, and we send a crew member back through the stand each morning before doors. That last one is a labour line, and we would rather you saw it than absorbed it.

Build the Screened Zone Physically, Let Your Regulatory Team Define It

A great deal of what is shown at IMCAS is prescription-only medicine or a regulated device, and what may be displayed, to whom, and with what wording is a question for your regulatory affairs people and for French law — not for your stand builder. What we can do is build the physical answer: a screened or badge-controlled area with a real door or a real sightline break, storage that locks, and a layout that does not put restricted material on an aisle-facing wall by accident. Tell us early which content needs to sit behind that line and it costs nothing. Tell us in January and it is a rebuild.

Distributor Meetings Are the Real Traffic

A large share of the exhibitors here are manufacturers looking for distributors, and a large share of the visitors are clinic owners and importers. That produces a very specific pattern: back-to-back seated meetings, running late, with sample cases open on the table and territory being argued over. Plan seated capacity as a hard number rather than an afterthought, give the meeting area acoustic separation from the demonstration position, and put lockable storage where samples can go at night. Stands that treat meeting space as overhead run out of it on the first morning.

The Stand Clears No Customs. Your Product Might.

Frankfurt to Paris is an internal EU road movement, so the structure, graphics, lighting and furniture cross no border and need no broker. Exhibitors regularly assume their product rides along with that. It does not, if it is coming from Korea, Brazil, Turkey, the United States or anywhere else outside the union — that is a separate import with its own paperwork, its own timing, and in the case of regulated medical goods its own conditions. Get that moving on your side in parallel with the build on ours. It is the most common reason a stand is ready and the shelves are empty.

Transparent Pricing

What an IMCAS Stand Actually Costs

The cost driver at this congress is finish and light rather than floor area. A 24 m² stand with closed-edge surfaces, a screened consultation corner and a lighting scheme that renders skin honestly costs more to build than a 30 m² stand with a printed back wall and a counter. The brackets below are written that way round on purpose.

Essential — 9–18 m²

From €4,500
Best for: cosmeceutical and skincare lines, single-product launches, distributors attending IMCAS for the first time
  • Modular aluminium system frame
  • Full-height backlit fabric wall, colour-managed for product imagery
  • One branded reception counter with a closed, low-sheen front
  • Neutral-white, high colour-rendering lighting rather than standard top rail
  • Graphics design and print, two revision rounds
  • Frankfurt → Paris road freight, no customs on the stand
  • Installation, dismantling and organiser paperwork

Not included: enclosed or screened consultation room, treatment-demonstration position, floor space from the organiser.

Premium — 60–100 m²+

From €34,000
Best for: market leaders taking an anchor position, brands hosting a launch or a press moment on stand
  • Full architectural design with a hosted arrival sequence
  • Multiple screened consultation rooms
  • Feature lighting designed alongside the structure rather than added to it
  • Content-capture position that works for the hybrid audience
  • Storage, back-of-house and staff area
  • Double-decker where the venue permits it
  • Project manager plus on-site supervision throughout
  • Daily morning finish check before doors

Not included: floor space, organiser services, AV hire, catering.

Recent Builds

Stands We Have Built

Stands delivered across European congresses and trade fairs, including builds at Paris congress venues.

A Guide to Exhibiting at IMCAS World for the First Time

IMCAS World 2027 runs from 28 to 30 January 2027 at the Palais des Congrès de Paris, and it is the January fixture in aesthetic medicine, dermatology and plastic surgery. The organiser bills it as a hybrid congress, Paris and online, and runs INVEST by IMCAS — an executive and investor day — on 27 January, the day before the exhibition opens. Everything on this page refers to the Paris congress specifically.

If you have exhibited at a medical trade fair before, expect this to feel different. The scientific programme, not the opening hours, decides when your stand is busy. The people walking past it can buy without going through a hospital tender. And the standard of finish they expect is closer to a clinic interior than to a trade-fair booth. Those three differences drive most of what follows.

Which IMCAS You Are Actually Exhibiting At

IMCAS is a family of congresses rather than one event, and exhibitors regularly plan against the wrong one. The Paris congress is IMCAS World, held each January. IMCAS Americas takes place in São Paulo — the 2027 edition on 20 to 22 May. IMCAS Asia is in Bangkok, 4 to 6 June 2027. There is also an IMCAS China edition in Shanghai, held 27 to 29 August 2026.

This matters commercially, not just logistically. The Paris congress is the one with the broadest international mix and the one where European distributor relationships are made and unmade. It is also the only one of the four we build for directly from Frankfurt as a road movement. If your plan is to exhibit at more than one edition in a year, the sensible pattern is to buy a structure that lives in our Frankfurt warehouse between shows and travels for the European dates, and to handle the São Paulo or Bangkok stands locally rather than shipping a European build halfway round the world.

Book the Paris space first. It is the hardest of the four to get a good position at, because returning exhibitors hold priority.

Who Walks Onto Your Stand, and What They Can Sign

The visitor profile here is dermatologists, plastic surgeons, aesthetic physicians, clinic owners and their buying staff, alongside distributors and importers looking for territory. The distinguishing feature is that clinical interest and purchasing authority sit in the same person. A dermatologist who runs a practice can decide to buy a device or take on a product line without a committee, a tender, or a six-month procurement cycle.

That changes the stand's job. At a hospital-facing congress the stand exists to start a relationship that concludes elsewhere, so the design optimises for conversation and credibility. Here the stand has to be capable of finishing something. It needs a place to sit down properly, a surface big enough for a sample case and a contract, somewhere to discuss numbers without the next visitor listening, and staff who can answer a pricing question rather than defer it.

It also needs to work at two speeds. Between sessions the floor fills sharply and you want a fast, legible read from the aisle — what you make, for what indication, in three seconds. During sessions the floor thins and the same footprint has to host a forty-minute negotiation. Designing for only one of those two states is the most common structural error we see.

Light, Colour and Finish as Specification

On most trade-fair floors lighting is a comfort question. Here it is a product question. Everything being sold is judged against skin — the tone of a face in a before-and-after, the surface of a treated area on a demonstration head, the colour of a cream in a jar. Light that skews warm, skews green or renders colour poorly makes your own product look worse than a competitor's under better fixtures, and the audience is trained to notice exactly that.

The practical specification is neutral-white fixtures with high colour rendering over any surface carrying product imagery or a demonstration, no coloured wash across those zones, and separate task lighting at any position where a visitor will look closely at something. Coloured light belongs on the structure and the brand wall, away from the product. This is a specification decision made before the design is drawn, not a hire item added at the end.

Finish follows the same logic. Closed edges rather than raw ones, low-sheen surfaces that do not carry fingerprints, and no visible fixings on any face a visitor stands within arm's length of. We build to that standard as default for this congress and we would rather explain the cost than deliver the alternative.

Compliance, Promotion and the Screened Zone

A significant proportion of what is shown at IMCAS is prescription-only medicine or a regulated medical device, and the rules on what may be promoted, to whom, and in what terms are set by French and European law and by your own regulatory affairs function. We do not advise on that and you should be wary of any stand builder who offers to.

What we do is build the physical answer to whatever your regulatory team decides. In practice that means a screened or badge-controlled area with a genuine sightline break rather than a symbolic one, storage that locks, a layout that keeps restricted material off aisle-facing walls, and clear separation between what is visible to any passing visitor and what is only shown to a verified healthcare professional.

The cost consequence is entirely about timing. Designed in at the start, the screened zone is a layout decision worth very little. Added after the design is signed off, it is a rebuild of the largest wall on the stand. Tell us in the brief which content sits behind the line.

Booking, Timeline and What Slips

Work backwards from 28 January 2027. Space is released by the organiser's priority point system, so the first date in your calendar is not one you choose — it is the date you are permitted to book. Get that confirmed and send us the plot dimensions, the open sides and the position on the plan. The organiser also requires proper company documentation at the point of booking, including a VAT number and recent government-issued evidence of your registered company name and address, so gather that before you reach checkout rather than during it.

From a confirmed brief we return a free 3D design inside 48 hours and normally reach a signed design within two weeks of that. Fabrication and finishing take around four weeks, and we hold a week for dry assembly, photography and correction in Frankfurt before anything is loaded. Road freight to Paris is short and predictable. The comfortable booking point is three to four months out; the point at which the design starts making compromises is about eight weeks.

The thing that most often slips is not the stand. It is product arriving from outside the EU, and printed material approved by a regulatory team that is also approving twenty other things in January. Both of those sit on your side, and both are worth starting a month earlier than feels necessary.

Because IMCAS runs annually and the same brands return each January, a reusable system frame usually beats a rebuild — the structure stays in our Frankfurt warehouse between editions and the next congress costs a graphics and finish refresh rather than a new build. Our modular exhibition stands are engineered for exactly that pattern.

FAQ

IMCAS World 2027 — Frequently Asked Questions

Real answers with real numbers. Click any question to expand.

When is the next IMCAS World Congress?

IMCAS World 2027 runs from Thursday 28 to Saturday 30 January 2027 at the Palais des Congrès de Paris. The 2026 edition has already taken place, so 2027 is the next Paris congress. INVEST by IMCAS, the executive and investor day, is held on 27 January, the day before the exhibition opens.

How much does a stand at IMCAS World cost?

From €4,500 to around €48,000 depending on size and finish. A modular 18 m² sits in the €4,800–€10,100 range. A 24 m² custom stand with a screened consultation corner is typically €11,500–€15,000. A 48 m² with two demonstration positions and two meeting spaces runs €19,000–€26,000. Premium and double-decker builds from 80 m² start around €34,000.

Is floor space included in your price?

No. You buy floor space directly from the organiser, and what you pay depends on the position and the number of open sides. Our price covers design, build, graphics, road freight, installation, dismantling and supervision. We say so on the quote rather than leaving it to be discovered.

How do we book exhibition space at IMCAS?

Through the organiser, via a priority point system that sets the date on which you are allowed to book. Returning exhibitors reach that date before newcomers. Have your VAT number and recent government-issued documents confirming your registered company name and address ready before you start, because the booking process asks for them.

Do you handle customs for shipping into France?

There is no customs procedure to handle for the stand. Frankfurt to Paris is a road movement inside the EU single market — no entry declaration, no carnet, no broker and no clearance window that can slip. Your product is a separate question, covered below.

What happens to our product if it ships from outside the EU?

It is an import in its own right, with its own paperwork, its own timing and, for regulated medical goods, its own conditions. It does not travel with our truck and it is not covered by the fact that our freight is intra-EU. That side sits with you or your freight forwarder, and it is the most common reason a stand is ready on time and the shelves are not. Start it a month earlier than feels necessary.

How far in advance should we book the stand build?

Three to four months before the congress is comfortable. That allows two weeks to settle the design, around four weeks for fabrication and finishing, and a week for dry assembly and correction in Frankfurt. From about eight weeks out the design starts making compromises. We have built in less, but the finish standard this congress expects is the first thing that suffers.

What is different about building at the Palais des Congrès?

It is a congress centre rather than a drive-in exhibition hall, so material reaches the exhibition level through lifts and service corridors instead of a hall door. Panels are sized in the workshop to fit those routes, structure comes apart into pieces two people can carry, and assembly is designed to need a driver rather than a saw. On-site cutting inside a congress centre is slow where it is permitted at all.

Can we run live treatment demonstrations on the stand?

What may be demonstrated on an exhibition floor, on whom, and under what supervision is set by the organiser's rules and by French law, and it is not a question a stand builder should answer for you. Confirm it with the organiser first. What we build is the position — a bench at working height, dedicated task lighting, a wipeable surface, power where the device needs it, and enough separation that the demonstration does not spill into the aisle.

How do we handle prescription-only or regulated content on the stand?

Your regulatory affairs team defines what may be shown and to whom. We build the physical separation that decision requires: a screened or badge-controlled area with a real sightline break, lockable storage, and a layout that keeps restricted material off aisle-facing walls. Designed in from the brief it costs almost nothing. Added after sign-off it is a rebuild of the largest wall on the stand.

Why does lighting matter so much at this congress?

Because everything on this floor is judged against skin. A before-and-after image, a treated area on a demonstration head, the colour of a formulation in a jar — all of them look wrong under fixtures that skew warm or render colour poorly, and this audience is professionally trained to see it. We specify neutral-white, high colour-rendering fixtures over any product or demonstration surface, keep coloured wash on the structure rather than the product, and add task lighting at close-viewing positions.

How much of the stand should be meeting or consultation space?

More than you would allocate at a general trade fair. Distributor and clinic-owner conversations here are seated, long and back-to-back, so plan seated capacity as a stated number rather than a leftover. On a 24 m² stand that usually means one screened area plus an open table. On 48 m² it means two enclosed spaces. Stands that treat meeting space as overhead run out of it on the first morning.

Do you build double-decker stands for this venue?

Only where the exhibition level's height allowance and structural rules permit it, which is a venue and organiser question rather than a design one. Confirm the height limit for your plot before you plan a second level. Where it is not permitted, the same footprint gains far more from a screened consultation room than from vertical branding.

What size stand should a first-time exhibitor take?

18 m² is the honest starting point for a first Paris congress, and 24 m² if you expect to run scheduled distributor meetings. Below 18 m² there is no realistic way to hold a private conversation, and on this floor the private conversation is what you came for. We would rather talk you into a smaller footprint finished properly than a larger one finished cheaply.

Can you reuse or refit our existing stand?

Often, yes. Send photographs and the system type and we will tell you honestly whether the structure is worth moving and refitting or whether the freight and labour cost more than a fresh modular build. If it is the second, we say so. We would rather lose the build than sell you a refit that arrives looking tired at a congress judged on finish.

What is included in the price you quote?

Free 3D design before contract, build and dry assembly at our Frankfurt workshop, graphics design and print, the lighting and finish specification, road freight to Paris, installation and dismantling, organiser paperwork, an on-site supervisor and a dedicated project manager. Floor space, organiser services, AV hire and catering are not included, and the quote names them as exclusions.

Do you provide the 3D design before we commit to anything?

Yes. Send the brief with your confirmed plot dimensions and open sides and we return a 3D design within 48 hours at no cost and with no obligation. If you take it elsewhere, that is your decision and there is no charge.

Who is on site during the congress?

Our own installation crew builds and dismantles the stand, and a supervisor stays for the full congress rather than leaving after handover. For this congress the supervisor also walks the stand each morning before doors for a finish check, because three days of visitors leaning on counters shows on a low-sheen surface.

Is IMCAS World the same as IMCAS Americas, Asia or China?

No. They are separate congresses in separate cities. IMCAS World is the Paris congress each January. IMCAS Americas 2027 is in São Paulo on 20 to 22 May, IMCAS Asia 2027 is in Bangkok on 4 to 6 June, and IMCAS China 2026 is in Shanghai on 27 to 29 August 2026. This page covers the Paris congress only, which is the one we build for directly from Frankfurt.

How do we get a quote?

Send your plot size, open sides, whether you need a screened consultation area and a demonstration position, and roughly what you want to spend. You get a 3D design within 48 hours and one itemised, all-inclusive price. No deposit is required to see the design.

Ready to Exhibit

Get Your IMCAS Stand Design in 48 Hours

Free 3D rendering before contract. One all-inclusive quote, road freight from Frankfurt with no customs on the stand, and the lighting and finish specification written into the price rather than assumed.

48hrFree 3D Design
€4,500+All-Inclusive
28 daysTo Show Floor
4.9Trustpilot4.9Google
WhatsApp us
WhatsApp us