Skip to content
Food Hotel Tech 2027
SOL Germany · Paris

Hospitality-Tech Stand Builder for Food Hotel Tech in Paris

Stands for Paris Expo Porte de Versailles, Hall 7.1, on 31 March and 1 April 2027 — built in our Frankfurt workshop and installed by our own crew. Designed around what a software demonstration actually needs: seated positions, screens legible from the aisle, and a connection that does not depend on hall wifi.

€4,500+From
500+Stands
15 YrsEurope
4.9Trustpilot4.9Google
Browse Designs
Food Hotel Tech stand builder SOL Germany — hospitality technology demo stand at Paris Expo Porte de Versailles
31 MAR – 1 APR 2027
Paris, France
31 March – 1 April 2027Show Dates
Paris Expo, Hall 7.1Venue
Annual, two daysFormat
230Exhibitors (2026)
EasyfairsOrganiser
8,700Visitors (2026)
Event Overview

Food Hotel Tech 2027 — Everything You Need to Know

Food Hotel Tech is the French hospitality sector's technology and sustainability fair: two days, one hall, and a floor of hotel and restaurant operators who arrived to buy software rather than to walk a machinery aisle. The 2027 edition is the show's tenth.

Food Hotel Tech 2027 — At a Glance

Dates
31 March and 1 April 2027 — Wednesday and Thursday
Hours
09:00–18:00 on the Wednesday, 09:00–17:30 on the Thursday
Venue
Paris Expo Porte de Versailles, Hall 7.1
Format
Annual, two days, a single hall
Edition
The tenth — the show was founded in 2017 by Karen Serfaty
Last edition
The ninth ran 14–15 April 2026 and drew 230 exhibitors, around 8,700 visitors and 36 conference sessions
Organiser
Food Hotel Tech, part of the Easyfairs group since 2026
Audience
Hotel and restaurant operators, groups and franchise networks — buyers rather than specifiers

Why Exhibitors Choose SOL Germany for Food Hotel Tech

This is the shortest show we build in Europe. Two days, roughly sixteen open hours, one hall. That single fact should govern the budget more than the design brief does, because everything you spend on structure is amortised over those sixteen hours unless the structure comes home again. We say so before quoting rather than after: on this floor a system frame you keep and re-skin is usually the better purchase, and a one-off build that ends in a skip on the Thursday evening is difficult to justify unless it is doing a job nothing else can do.

The stand is cut, dry-assembled and photographed on our own floor in Frankfurt, then driven to Paris and installed by our crew. Both ends sit inside the single market, so there is no border formality and no temporary-import file sitting on the critical path — which matters here because your freight is usually not the stand, it is the demo hardware. Panels are sized to reach an upper-level hall through a goods lift rather than sized to a drawing, and nothing is cut on site.

The third thing we do differently at this show is treat the network like a utility rather than an assumption. A wired line is specified, ordered and positioned at the same time as the power, and the demo is built so it still runs if the line drops. On a floor whose entire product category is connected software, that is not a technical footnote — it is the difference between a working stand and two days of apologising.

One quote, itemised. The wired-network order and the power order are in it before you sign, not added after the show.

From Our Project Managers

What We've Learned Building for a Two-Day Software Show in Paris

Practical notes from the SOL Germany team — the things the exhibitor manual does not tell you.

CD

Hall Wifi Is Not a Demonstration Platform

This is the Food Hotel Tech note. Several thousand visitors walk in carrying two connected devices each, every stand around you is streaming something, and the shared wireless in a busy hall degrades from mid-morning on day one — exactly when your best conversations happen. A wired connection is ordered from the venue separately from electrical supply, it is position-dependent, and the deadline falls before build-up, so it cannot be fixed on the Tuesday. We file it with the power order. We also build the demo to survive the line dropping: a local copy or a recorded walkthrough on the machine itself, so a network failure costs you polish rather than the pitch.

Hall 7.1 Is Upstairs, and the Goods Lift Sets Your Panel Size

Pavilion 7 at Porte de Versailles is a multi-level building and 7.1 is not the ground floor. Everything you bring reaches the stand through a goods lift, which means the longest panel in your design is decided by a lift car rather than by the render. We size the crate list to that constraint at drawing stage. The failure mode is familiar and expensive: a beautiful four-metre back wall that has to be cut down in a loading bay while the build window runs out.

Two Days Means the Build Window Is the Project

A short show has a short tenancy at both ends. There is no recovery day, no quiet Monday to finish snagging, and dismantling starts while your team is still shaking hands. We pre-assemble the whole stand in Frankfurt and photograph it for approval, so what happens in Paris is assembly rather than construction. It also changes the packing logic: everything is flight-cased and labelled by build sequence, because on a two-day show the time you lose looking for a part is time you do not get back.

A Screen Is Not a Display Until It Can Be Read From the Aisle

The most common design mistake here is a laptop on a counter. Passing traffic sees a closed lid and a person looking down. What works is a monitor mounted at standing eye level carrying one legible statement of what the product does, with the actual demonstration happening lower down and seated. Hall lighting reflects, so screen angle and brightness are planned against the lighting rather than discovered on site, and the interface has to survive being read at two metres by someone who runs a hotel and has never seen your product.

Half the Floor Is Being Judged on Sustainability, Including Your Stand

Corporate responsibility is not a side theme at this show, it is in its positioning and its awards. That puts an exhibitor selling energy or waste reduction on a single-use build in an awkward position, and buyers here have started asking. A reused system frame, recyclable printed graphics and a straight answer about what happens to the stand afterwards is a positioning argument on this floor, not a virtue signal — and it happens to be the cheaper option over two or three editions.

Day One Does Not End at Six

The tenth-edition programme includes an evening event in Hall 7.1 on the first night, and an anniversary edition tends to attract more of that. Plan for it: stand lighting on a circuit you can leave on, somewhere lockable for laptops and demo hardware, and a rota that does not have your whole team leaving at closing time on the day the floor is busiest. It is also worth asking whether you want your stand near that activity or away from it — both are defensible, but the choice is made at floor-plan stage.

Transparent Pricing

What a Food Hotel Tech Stand Actually Costs

Most of this floor sits in the first two brackets, and that is the right answer rather than a compromise. On a two-day show the useful question is not how much stand you can afford but how much of it you can take home and use again next year.

Essential — 9–18 m²

From €4,500
Best for: start-ups in the innovation village, single-product software vendors, first-time exhibitors testing the French market
  • Modular aluminium system frame
  • Backlit fabric back wall, full height
  • One branded counter with lockable storage
  • Standard LED top-rail lighting
  • One demo position: monitor bracket, concealed cable route and power
  • Graphics design and print (two revision rounds)
  • Frankfurt → Paris road freight
  • Installation, dismantling and organiser paperwork

Not included: floor space rental, venue electrical and wired-network orders, monitors and demo hardware, furniture beyond the listed items.

Premium — 60 m² and above

From €34,000
Best for: hospitality suites, groups exhibiting several brands under one identity, exhibitors hosting part of the evening programme
  • Architectural custom build
  • Multiple enclosed meeting rooms
  • Full AV package and a presentation position
  • Hospitality and bar area built to venue rules
  • Independent lighting circuit for evening opening
  • Hanging sign where the hall permits
  • Technical back-of-house and storage
  • Priority workshop build slot

Not included: floor space rental, rigging fees, catering and beverage licences, AV hire beyond the package.

Recent Builds

Stands We Have Built

Stands delivered across French and German trade fairs, including repeat builds at Paris Expo Porte de Versailles.

A Guide to Food Hotel Tech for First-Time Exhibitors

Food Hotel Tech is the technology and corporate-responsibility fair for the French hotel and restaurant sector, and the 2027 edition runs on 31 March and 1 April at Paris Expo Porte de Versailles, Hall 7.1. It opens 09:00–18:00 on the Wednesday and 09:00–17:30 on the Thursday. The show was founded in 2017 and 2027 is its tenth edition.

One change is worth knowing before you plan. The show joined the Easyfairs group in 2026, announced at the ninth edition, which ran on 14–15 April 2026 and drew 230 exhibitors, around 8,700 visitors and 36 conference sessions. New ownership usually means a revised exhibitor manual, and sometimes a revised stand-package structure. Read the 2027 manual rather than working from what a colleague remembers of 2025.

Who Exhibits and What the Visitor Came to Do

The floor covers property-management and booking systems, point-of-sale and payment, kitchen technology and robotics, staff scheduling and human-resources tools, data and artificial intelligence, and the energy, waste and sourcing side of corporate responsibility. Alongside the established vendors there is a start-up village, which is a real part of the show's character rather than a corner of it.

The visitor is an operator: someone who runs one hotel, a small group, a restaurant chain or a franchise network, and who signs for software rather than specifying it for someone else. That shortens the sales conversation and changes what it needs. They will not ask for an architecture diagram. They will ask what it costs per room or per cover, how long installation takes, what happens to their existing system, and whether their staff can use it without a week of training. A stand that answers those four questions before anyone speaks does more qualifying work than any amount of styling.

Designing a Stand for a Product Nobody Can Touch

A software product has no shelf presence. There is no machine humming, no sample to hand over, nothing that stops someone at three metres. What stops people is a single legible statement of what the product does for a hotel or a restaurant, written large enough to read while walking, and then a way to sit down and be shown it.

That gives the stand two zones rather than one. The aisle-facing zone is a headline and a mounted screen at standing eye level, running a short loop rather than a live session — a live demonstration on a high screen is unreadable and unrepeatable. The interior zone is seated: a surface at the right height, two chairs, a monitor angled for two people rather than an audience, power and cable management under the surface, and enough acoustic separation that a fifteen-minute conversation is possible while the aisle is loud. Four seated positions on a 48 m² stand will out-perform a stage on the same footprint at this show, because nobody buys a property-management system from a presentation.

Two practical constraints sit underneath all of that. Hall lighting will reflect off any screen you mount without planning the angle, and a demonstration that depends on shared hall wireless will fail at the worst moment. Both are solved at design stage — one with screen positioning, one with a wired line ordered from the venue and an offline fallback built into the demo itself.

Stand Size: 9, 18, 24 and 48 Square Metres on a Two-Day Floor

Nine square metres works for a single-product vendor or a start-up. You get a back wall, a counter and one demo position, and conversations happen standing. It is genuinely enough to launch a product here, which is not true at most of the shows we build.

Eighteen square metres is the point at which you can have a seated demonstration and a second person still working the aisle, and it is the size most established software vendors should be looking at first. Twenty-four adds a semi-private corner, which matters if your conversation involves a customer's actual numbers.

Forty-eight square metres supports three or four seated positions plus a meeting area, and suits a group showing several products or anyone demonstrating physical kitchen equipment alongside software. From 60 m² upward you are building a hospitality suite rather than a stand, which some exhibitors do here deliberately — but on a two-day floor that decision should be made on meeting capacity, not on presence.

What a Food Hotel Tech Stand Costs by Size

Ranges below are all-in for design, fabrication, graphics, road freight from Frankfurt, installation and dismantling. They exclude the floor space rental you pay the organiser, and the electrical and network orders placed with the venue.

  • 9 m² modular: €4,100–€8,700
  • 18 m² modular: €4,800–€10,100
  • 24 m² custom with two seated demo positions: €11,500–€15,000
  • 30 m² custom with semi-private meeting corner: €15,000–€19,000
  • 48 m² custom with four demo positions: €19,000–€26,000
  • 60 m² and above, premium build: €34,000–€44,000

Common Mistakes, in Order of Frequency

The most common is a laptop on a counter, which shows passing traffic a closed lid instead of a proposition. The second is assuming hall wireless will carry a live demonstration, which it will not by the middle of the first morning. The third is designing panels for the render rather than for the goods lift that serves an upper-level hall, which turns into cutting in a loading bay. The fourth is spending on a single-use structure for sixteen hours of floor time when a reusable frame costs less across two editions. The fifth is treating the corporate-responsibility theme as someone else's topic while exhibiting on a stand that will be scrapped on Thursday evening. Every one of them is settled at design stage or not at all.

Getting Started

Send your stand size, your hall position if the organiser has issued it, and a short description of what you are demonstrating — how many people need to sit down at once, whether any physical equipment is coming, and whether the demo can run without a live connection. Those three answers shape the design more than any styling preference. You get a 3D design and an itemised all-in quote, at no charge and with no obligation.

A two-day show is the strongest argument we know for a frame you keep. The structure comes back to our Frankfurt warehouse afterwards, and the next edition costs a graphics refresh rather than a rebuild — which also answers the sustainability question this particular floor will ask you. Our modular exhibition stands are built for exactly that pattern.

FAQ

Food Hotel Tech 2027 — Frequently Asked Questions

Real answers with real numbers. Click any question to expand.

When and where is Food Hotel Tech 2027?

Food Hotel Tech 2027 runs on 31 March and 1 April 2027 at Paris Expo Porte de Versailles, Hall 7.1. It opens 09:00–18:00 on the Wednesday and 09:00–17:30 on the Thursday. This is the tenth edition; the show is annual and runs over two days.

How much does a Food Hotel Tech stand cost?

From €4,500 to around €48,000 depending on size. A modular 18 m² sits in the €4,800–€10,100 range. A 24 m² custom stand with two seated demo positions is typically €11,500–€15,000. A 48 m² with four positions runs €19,000–€26,000. Premium builds from 60 m² start around €34,000. Most stands at this show sit in the first two brackets.

What is not included in the price?

Three things. The floor space rental, which is between you and the organiser. Venue orders — electrical supply, the wired network connection, rigging and waste. And hardware and extras: monitors, demo devices, AV beyond the listed mounts, catering and staffing during the show.

How do you design a stand for software when there is nothing physical to display?

By splitting the stand into two zones. The aisle-facing zone carries one legible statement of what the product does plus a mounted screen at standing eye level running a short loop. The interior zone is seated: a surface at the right height, two chairs, a monitor angled for two people, power and cable management underneath, and enough acoustic separation to hold a fifteen-minute conversation. Seated positions, not a stage, are what convert on this floor.

Do I need a wired internet connection, or is the hall wifi enough?

Order the wired line. Shared hall wireless degrades from mid-morning on the first day, and that is when your best conversations happen. The connection is ordered from the venue separately from electrical supply, it is position-dependent, and the deadline falls before build-up. We file it alongside the power order and build the demonstration so it still runs if the line drops.

Can you build a stand for a connected-kitchen or robotics demonstration?

Yes. Anything that moves, heats or carries weight changes the floor build, so we need the crated weight, the dimensions, the power draw and whether it needs water or extraction. Send that at briefing stage — it shapes the plinth, the access route and the services order more than the design does.

Is there customs to pay on the stand?

No. Frankfurt to Paris is a single-market road journey — no border formality, no carnet, no customs broker on the stand itself. Hardware you ship in from outside the EU is a separate matter and stays with you, though we will tell you what it needs.

Hall 7.1 is upstairs. Does that change the build?

It changes the panel sizes. Everything reaches the stand by goods lift, so the longest element in the design is limited by a lift car rather than by the drawing. We plan the crate list around that constraint before the design is signed off, which avoids the standard failure of cutting a back wall down in a loading bay while the build window runs out.

Do you handle the organiser paperwork?

Yes — electrical and network orders, rigging permissions where the hall allows them, waste removal, daily cleaning and crew passes. We file on the day a contract is signed, because the venue services deadlines fall well before build-up and are the ones that cannot be recovered late.

How long does install take?

A 9–18 m² stand goes up in one shift. A 24–48 m² custom stand takes a day plus commissioning time for screens and connectivity. The show is two days long, so tenancy is short at both ends — every stand is fully pre-assembled at our Frankfurt workshop first, and nothing is cut on site.

When do I need to lock the design?

For a show at the end of March, mid-January is comfortable. But the venue services orders bind earlier than the design does, so if your stand needs a wired line, three-phase power or anything for physical equipment, we need those details well before the visuals are final.

The show is only two days. Is a custom stand worth it?

Sometimes, and we will say when it is not. Sixteen open hours is a short amortisation window for a single-use structure. If you exhibit here annually, a system frame you keep and re-skin costs less across two editions and answers the sustainability question the floor will ask you. A one-off build has to be doing something a reusable frame genuinely cannot.

Can I reuse the stand next year?

Yes, if it is built on a system frame. We store the structure in Frankfurt and refresh the graphics for the next edition. In this sector the messaging usually needs updating anyway — the product moves faster than the stand does.

The show promotes sustainability. Can the stand support that claim?

It can, and buyers here do ask. A reused frame, recyclable printed graphics rather than laminated composites, LED lighting and a stand that returns to our warehouse instead of a skip are all things we can put in writing for you. We will not certify anything we cannot document.

What about the evening event on the first day?

The tenth-edition programme includes an evening event in Hall 7.1 on the first night. If you want to be part of it, plan stand lighting on a circuit you can leave running, somewhere lockable for laptops, and a staffing rota that does not empty the stand at closing time on the busiest day.

Can you handle a rush build?

Usually, for the structure — we control our own workshop. What cannot be rushed is the venue services order. Power and network connections have fixed deadlines and no builder can move them, which is the one reason to start earlier than the design timeline suggests.

Can I visit during pre-build?

Yes, and for a demo-led stand we recommend it. The workshop is about fifteen minutes from Frankfurt Airport. You see the stand assembled, sit at the demo position to check the screen height and the sightline, and meet the crew who will install it.

What graphics files do you need?

Vector files for logos and any certification marks, and high-resolution raster images at roughly 150 dpi at final print size. Send French copy as well as English if you have it — this is a domestic French audience, and a wall that reads only in English costs you conversations at the aisle.

How many staff should I plan for?

On 9–18 m², two: one demonstrating, one working the aisle. On 24 m², three. At 48 m² with four seated positions, five or six, because a seated demonstration occupies one person for fifteen minutes at a time. Build the rota around the seats, not around the floor area.

How do I start?

Send your stand size, hall position if you have it, how many people need to sit down at once, and whether any physical equipment is coming. You get a 3D design and a full itemised quote back.

Ready to Exhibit

Get Your Food Hotel Tech Stand Design in 48 Hours

Free 3D rendering before contract. One all-inclusive quote with no hidden line items, single-market road freight and no customs — with the demo positions, the screen sightlines and the wired connection planned before the design is drawn.

48hrFree 3D Design
€4,500+All-Inclusive
28 daysTo Show Floor
4.9Trustpilot4.9Google
WhatsApp us
WhatsApp us