A Practical Guide to Exhibiting at the ESPE Congress
The ESPE Annual Meeting is the yearly congress of the European Society for Paediatric Endocrinology, the specialist society for clinicians and researchers working on endocrine conditions in children and adolescents, growth, puberty, thyroid, adrenal and paediatric diabetes among them. The 65th meeting runs from Thursday 29 April to Saturday 1 May 2027 at Gothia Towers in Gothenburg, Sweden, the hotel and congress complex beside the Swedish Exhibition & Congress Centre at Korsvägen. It follows the 64th meeting, held from 8 to 10 September 2026 at Marseille Chanot, the Palais des Congrès et des Expositions in Marseille.
This guide is written around the two things that make ESPE genuinely different to plan for: it moves, and it is small. Neither is a criticism. Both are decisions you have to make space for in a budget and a design, and most of the advice written about medical-congress stands assumes the opposite of both.
Where ESPE Is Held, and Why It Moves
ESPE has no permanent home. The recent rotation runs The Hague in September 2023, Liverpool in November 2024, Copenhagen in May 2025, Marseille in September 2026 and Gothenburg in late April 2027. A local organising host is appointed in the host country for each edition: Jovanna Dahlgren and Lars Sävendahl fill that role for Gothenburg, alongside Peter Kühnen as programme organising chair.
The rotation is normal for a European scientific society and it spreads the travel burden across the membership fairly. What it means for an exhibitor is that no venue knowledge carries forward. Ceiling heights, rigging permissions, the loading dock, the electrical order form, the freight forwarder and the language on the paperwork all reset each year. The only things that carry forward are your stand, your graphics and your supplier's memory, which is the argument for keeping all three consistent rather than re-tendering the build annually.
It also means the phrase »the ESPE venue« is meaningless in isolation. If you are reading a supplier page that talks confidently about the hall layout without naming an edition, it is describing a building that ESPE may never return to.
The Eight-Month Year: Marseille 2026 to Gothenburg 2027
This is the single most useful thing on this page. The 64th meeting ended on 10 September 2026 and the 65th opens on 29 April 2027. The interval is under eight months, not the twelve that an annual congress implies and that almost every exhibitor budget assumes.
Look at the month across recent editions and the pattern is that there is no pattern: September, November, May, September, late April. There is no stable slot. An exhibitor who books a stand in the autumn and diarises »next one, same time next year« will find the design freeze for the following edition arriving while the previous stand is still in storage.
The practical response is straightforward once you have seen it coming. Approve the reuse plan at the same meeting where you approve the current artwork. Decide before the first build whether the frame is being kept, who is storing it and who is paying for that storage. Get the graphics files structured so that a panel swap is a print job rather than a redesign. Handled that way the second edition costs a fraction of the first. Handled the usual way, it costs the same as the first because nothing was designed to come back.
Who Exhibits at ESPE and What the Floor Is Actually For
The organiser publishes its industry partners and exhibitor list openly, and it repays a careful read before you decide on space. The sponsor tiers are occupied by endocrinology and rare-disease pharmaceutical companies. The exhibitor list beside them is dominated by a different kind of organisation entirely: scientific societies and international paediatric endocrine groups, European reference networks, patient and family foundations, clinical registries, growth-measurement software, and specialist medical publishers.
That mix tells you what the floor is for. It is an information and meeting environment attached to a scientific programme, not a product marketplace. Delegates come off a session, want to follow up on something specific with someone who knows the answer, and want to leave with material they can read on the train. The stands that work here are built for a seated conversation and a well-organised literature wall. The stands that struggle are built for footfall capture, which is a strategy for a floor with ten times the traffic.
In Marseille the exhibition sat physically apart from the congress halls, in the Palais des Événements within Parc Chanot; in Gothenburg the split between Gothia Towers and the adjoining exhibition centre is for the organiser's floor plan to confirm. Anything that sits apart has to be worth the walk, which is another argument for spending on the quality of the space rather than the quantity of it.
The Figure You Should Not Reuse
One number circulates widely in connection with ESPE and it should not be applied to this meeting. In 2025 ESPE held a one-off joint congress in Copenhagen with the European Society of Endocrinology, and the delegate expectation published for that event covered both societies together, paediatric and adult endocrinology in one hall.
It was a joint figure for a joint congress. It is not a size estimate for a standalone ESPE meeting, and 2026 and 2027 are standalone meetings again. If you size a stand or a staffing rota against it you will over-build and over-staff, and you will have paid for both.
We are not publishing an attendance or exhibitor count on this page in its place. The honest position is that the organiser does not publish a headline figure for the current edition in the way a large commercial trade fair does, and inventing a plausible one is worse than leaving the space empty. If you need a number for an internal business case, ask ESPE directly. The exhibition team will give you the current one, and it will be right.
Compliance, and What It Does to a Stand Design
ESPE states on its own sponsors and exhibitors page that the meeting has been determined compliant with the MedTech Europe Code of Ethical Business Practice and the EFPIA Code of Practice. If you exhibit here, your stand sits inside that determination.
In design terms the effects are concrete. Branded merchandise and giveaways go, and with them the counter you were going to hand them across. Prize draws, competitions and entertainment go. Hospitality is constrained to what the codes permit rather than what the catering menu offers. Anything that could be read as an inducement rather than an exchange of information needs to be justifiable, and the safest test is whether you would be comfortable explaining the item to a compliance officer in writing.
Paediatric specialty adds a layer that is easy to underestimate. Imagery involving children carries genuine sensitivity: consent, dignity, and how a clinical audience will read it. Assume your medical and legal reviewers will want to sign off every image, assume that takes longer than a normal marketing approval, and build that time into the schedule rather than discovering it the week print closes.
None of this makes an ESPE stand harder to design. It makes it a different design. Space that would have gone to merchandising goes to seating and to material. That is where the value was on this floor anyway.
What an ESPE Stand Costs by Size
Below is the indicative European market range for a modular build by size, covering structure, graphics, freight, installation and dismantling. It is a market range rather than a quote, and the position within each band depends on graphic area, lighting, storage and how far the host city is from Frankfurt.
- 9 m² modular: €4,100–€8,700
- 18 m² modular: €4,800–€10,100
- 24 m² modular: €11,500–€15,000
- 30 m² modular: €15,000–€19,000
- 45 m² modular: €18,300–€24,800
- 60 m² modular: €34,000–€44,000
Marseille in 2026 was roughly a thousand kilometres from our Frankfurt workshop; Gothenburg is further again and the route crosses into Scandinavia by ferry or bridge, so freight sits towards the upper part of the range, which is precisely why a frame that travels to two editions rather than one changes the economics so sharply. The second outing carries freight and print. It does not carry a build.
Building Once and Exhibiting Three Times
There is an unusual opportunity in the 2026–2027 calendar for anyone active in this specialty. The 64th meeting was in Marseille in September 2026. The 65th is in Gothenburg at the end of April 2027. And in September 2027 the 12th International Meeting of Pediatric Endocrinology (the global meeting that ESPE co-organises with the American, Australasian, Asia-Pacific, African, Japanese and Latin American societies) takes place at Pacifico Yokohama North in Japan.
For anyone who exhibited in Marseille, that is three appearances in roughly twelve and a half months, across two continents. Handled as three separate projects it is three builds, three design cycles and three sets of artwork. Handled as one programme it is one frame, three graphic sets and three freight movements, of which only the Yokohama leg needs sea or air freight and a different set of customs paperwork.
We are not going to pretend the Japanese leg is a road job. It is not, and if that edition is on your plan it needs its own conversation early. But the European pair is straightforwardly a single project (with the Marseille frame in store, Gothenburg is a graphics and freight job) and treating it as one is the difference between two full budgets and roughly one and a third.
Common Mistakes, in Order of Frequency
Assuming a twelve-month gap. Covered above, and it is the most common by some distance.
Returning the sponsorship paperwork and assuming the venue services are covered. They are separate, they come from a different organisation in a different country, and their deadline is usually earlier than you expect.
Designing a sealed meeting room. Even in a cool Gothenburg spring, screens and a full table make it uncomfortable within an hour and people will leave conversations early.
Sizing to a large-congress benchmark. This is a small specialist floor and a stand built for a device or oncology congress is not read as more serious here.
Leaving imagery approval to the end. Paediatric imagery review takes longer than standard marketing sign-off and it is the item most likely to hold up print.
Building something that cannot come back. If nothing is designed for reuse, the rotation works entirely against you instead of for you.
Getting Started
Send us the edition you are planning for, the space you have been offered or are considering, and what has to happen inside the stand: how many private conversations at once, whether you are running or supporting an industry session, and what printed material you expect to hold. If you are bringing a Marseille stand back for Gothenburg, or weighing Gothenburg and Yokohama together, say so at that point rather than later, because it changes the frame we specify.
You will have a 3D design and a fixed all-inclusive price before you commit to anything. If we think you should take less space than you are considering, we will say so in that first response rather than quote you for the larger stand.
Because ESPE moves city every year, a reusable system frame pays for itself faster here than at a fixed-venue show: the second edition costs graphics and freight instead of a fresh build. Our modular exhibition stands are designed for exactly that pattern of repeat use.












