Skip to content
embedded world 2027
SOL Germany · Nuremberg

Embedded Systems Stand Builder for Embedded World 2027 in Nuremberg

Stands for Exhibition Centre Nuremberg, 16–18 March 2027 — built and dry-assembled in our Frankfurt workshop, then driven down and installed by our own crew. Planned around how many demo positions have to work at once, not around how much wall there is to brand.

€4,500+From
500+Stands
15 YrsEurope
4.9Trustpilot4.9Google
Browse Designs
SOL Germany exhibition stand with demonstration benches for an electronics exhibitor at Exhibition Centre Nuremberg
16–18 MAR 2027
Nuremberg, Germany
16–18 March 2027Show Dates
Exhibition Centre NurembergVenue
AnnualCycle
1,200+ in 2026Exhibitors
NürnbergMesseOrganiser
3 DaysDuration
Event Overview

embedded world 2027 — Everything You Need to Know

embedded world Exhibition&Conference is the global meeting point for the embedded systems industry, and it runs at Exhibition Centre Nuremberg from Tuesday 16 to Thursday 18 March 2027. It started in 2003 with two halls and around 350 exhibitors. The 2026 edition drew over 1,200 exhibitors and more than 36,000 visitors. One thing to put in your calendar carefully: the 2027 edition falls on exactly the same three days as ITB Berlin, which is a one-time change on ITB's side.

embedded world 2027 — At a Glance

Dates
16–18 March 2027 (Tuesday to Thursday)
Opening hours
09:00–18:00 on Tuesday and Wednesday, 09:00–17:00 on Thursday
Venue
Exhibition Centre Nuremberg, Messezentrum 1 — around 13 km from Nuremberg Airport
Organiser
NürnbergMesse GmbH
Cycle
Annual — but the slot moves: 9–11 April in 2024, 11–13 March in 2025, 10–12 March in 2026, 16–18 March in 2027
Scale
The 2026 edition drew over 1,200 exhibitors and more than 36,000 visitors, on the organiser's own figures
Conferences
The embedded world Conference and the electronic displays Conference run in parallel with the exhibition
Same three days
ITB Berlin 2027 also runs 16–18 March. ITB states this is a one-time move; in 2026 it ran 3–5 March

Why Exhibitors Choose SOL Germany for embedded world

An embedded world stand is a bench problem before it is a design problem. Almost nobody here is showing one hero object. They are showing eight development boards, four screens, a couple of robot arms and a rack, and every one of those needs a flat surface at working height, its own socket, somewhere for the cable to go and an engineer standing beside it who can answer a question about interrupt latency. We design from the demo list backwards. Tell us how many positions have to run simultaneously and we will tell you what size of stand actually works, which is not always the size you were about to book.

We build in Nuremberg repeatedly across the year and know how the venue's ordering routine behaves under deadline. The stand is built and dry-assembled on our own floor in Frankfurt, photographed for approval, then driven roughly 220 kilometres south. Domestic road freight, no customs file, no border, and a crew who have worked these halls before.

The March 2027 date needs planning attention rather than worry. embedded world and ITB Berlin land on the same three days that week, which tightens crew and haulage availability across Germany. We allocate crews for that week when the space is booked, not when the design is signed off.

What you sign is one quote. There is no second invoice arriving three weeks after the show closes.

From Our Project Managers

What We Have Learned Building in Nuremberg

Six practical notes from the SOL Germany team — the things the exhibitor manual does not tell you.

CD

Count Sockets, Not Kilowatts

This is the embedded world one. At most industrial shows the electrical question is how much power you need. Here the total draw is often modest — a hall full of development boards, single-board computers and monitors does not add up to much in kilowatts — and yet the electrical order is still the thing that goes wrong. The reason is distribution. Twelve demo positions need twelve independent, reachable, individually switchable supplies, and they need them where the benches are rather than where the supply happens to enter the stand. We plan socket positions onto the layout drawing at the same time as the benches, and we build the cable route into the furniture instead of taping it down on the morning of day one. If a demo has to be power-cycled during the show, and one always does, an engineer should be able to do it without crawling.

The Radio Spectrum Is the Scarcest Thing in the Hall

Put thirty-six thousand people and a thousand-plus exhibitors demonstrating wireless protocols into the same halls and the 2.4 GHz band becomes effectively unusable by mid-morning on day one. Bluetooth pairing fails, Wi-Fi demos stall, mesh networking demonstrations that ran perfectly in the lab do nothing at all in front of a customer. This catches first-time exhibitors every year and it is not a fault in their product. Plan a wired fallback for anything you would be embarrassed to see fail: a hard Ethernet drop to the stand, cabling to each position, and where a demo genuinely has to be wireless, a shielded enclosure or a short-range low-power configuration rather than an open broadcast. We route the network cabling at the same time as the power for exactly this reason.

A Shared Stand Is Several Stands Wearing One Fascia

The multi-occupant stand is unusually common at this show. The pattern is well documented — the Zephyr Project has taken a single stand in Hall 4 with a dozen or more ecosystem member companies each running their own live demo on it, and distributors run partner-demo stands on the same principle. It is an efficient way to exhibit and a genuinely different build. Each occupant wants their own identifiable position, their own power, their own network, their own literature and somewhere to put a laptop bag. One organisation has to own the organiser paperwork and the health-and-safety declarations for the whole footprint. If you are planning a stand like this, tell us the occupant count at the briefing stage and not after the design is drawn — it changes the layout completely, and it changes the graphics schedule more than anything else.

Screens Are Weight, and Weight Goes on the Frame

This show puts more monitors per square metre on the floor than almost anything else we build. Electronic displays are a core topic in their own right and the conference programme carries a dedicated displays track, so exhibitors bring large panels and they bring several. A 55-inch panel on a VESA arm is a cantilever load, and a fabric-faced wall that looks solid will not carry it. We specify the mounting positions into the frame at design stage, reinforce those bays, and run the cabling inside the wall rather than behind it. It costs a little at the drawing stage and it saves an argument on build-up morning when someone arrives with a bigger screen than the brief said.

In 2027 We Are in Nuremberg and Berlin in the Same 72 Hours

ITB Berlin has moved its 2027 edition to 16–18 March so that Muslim exhibitors and visitors can observe Eid al-Fitr and then attend all three days. That is a considered decision on their part and a one-time one — but it puts two very large German exhibitions on identical dates. For anyone building stands in Germany that week, crew, trucks and hotel stock all tighten at once, and they tighten early. It has no effect on your stand if it is planned for; it has a significant effect on price and availability if you come to us in January. We hold crew for that week from the moment the space is confirmed.

The Numbers You Read Will Not Agree With Each Other

The organiser puts the 2026 edition at over 1,200 exhibitors and more than 36,000 visitors. Trade newswires covering the same three days reported more than 30,000 visitors. That is a twenty percent spread on a headline figure for an event that finished four months ago, and it matters if you are sizing a staffing rota or setting a lead target off it. Take the organiser's number, take it as an upper bound, and remember that visitors to this show are distributed very unevenly — the component halls are dense from opening and the software and services halls fill up after the morning conference sessions end.

Transparent Pricing

embedded world 2027 Stand Pricing

Real ranges, in euros, for a stand delivered to Exhibition Centre Nuremberg and taken away again afterwards. At this show the number that moves the price is not floor area on its own — it is how many demo positions have to be serviced with power, network and working-height surface. Domestic freight sits inside every bracket and there is no customs line at all.

Essential — 9–18 m²

From €4,500
Best for: component distributors, tool and software vendors, start-ups showing two or three boards
  • Modular aluminium system frame
  • Full-height fabric back wall with printed graphics
  • One branded reception counter
  • Two demonstration positions at working height
  • Standard LED top-rail lighting
  • Single-phase power, distributed to the bench positions
  • Graphics design and print (two revision rounds)
  • Frankfurt → Nuremberg road freight
  • Installation, dismantling and organiser paperwork

Not included: wired network drop, screen mounts above 43 inches, enclosed meeting room.

Premium — 50–100+ m²

From €34,000
Best for: platform vendors, multi-occupant ecosystem stands, exhibitors running a meeting programme alongside the demo floor
  • Large-format or two-storey structure
  • Ten or more independently serviced demonstration positions
  • Multiple enclosed meeting rooms for roadmap discussions
  • Dedicated occupant zones with individual identity
  • Integrated display walls and structural screen mounting
  • Three-phase distribution where the equipment needs it
  • Storage, staff area and secure overnight lock-up
  • Structural calculations and hall approval where two-storey
  • Dedicated project manager and full-time on-site supervisor

Not included: floor rental, hall services, AV hire, rigging, catering.

Recent Builds

Stands We Have Built

Recent stands from our Frankfurt workshop, delivered across German and European venues.

A Practical Guide to Exhibiting at embedded world

embedded world Exhibition&Conference is the global platform for the embedded systems community, covering hardware, systems, distribution, tools, application software, electronic displays, embedded vision, safety and security, IC and IP design, and start-ups. The 2027 edition runs from Tuesday 16 to Thursday 18 March at Exhibition Centre Nuremberg, with the halls open 09:00 to 18:00 on the Tuesday and Wednesday and 09:00 to 17:00 on the Thursday.

It is a young show that grew quickly. NürnbergMesse launched it in 2003 with two halls and roughly 350 exhibitors. The 2026 edition drew over 1,200 exhibitors and more than 36,000 visitors. Alongside the exhibition, the embedded world Conference and the electronic displays Conference run in parallel, which pulls a substantial share of the audience out of the halls during session hours and puts them back in afterwards.

An Engineering Audience Changes What a Stand Has to Do

The people walking this show are developers, system architects, hardware engineers and technical product managers. They are not there to be impressed by a brand environment and they are unusually resistant to one. They are there to put their hands on something, ask a specific question and find out whether your part solves their problem. That has direct consequences for the build.

The first is density. A stand here typically carries several times more demonstrable objects per square metre than a stand at a machinery or packaging show, and each one needs bench space at working height, power, often network, and room for two people to stand at it without blocking the aisle. The second is that seated conversation matters more than it looks like it should. A stand with nowhere to sit down loses the long conversations, and the long conversations are where the design wins are. The third is storage: engineers travel with spare boards, cables, adapters and power supplies, and all of it has to live somewhere lockable.

The Shared-Stand Model Is Unusually Common Here

One pattern is far more common at embedded world than at most European trade fairs: a single stand occupied by many organisations at once. The Zephyr Project, for example, has taken one stand in Hall 4 shared by more than a dozen ecosystem member companies, each running its own live demonstration on the same floor. Distributors run the same model with supplier partners. It is an efficient way to reach an audience that cares about ecosystems rather than individual vendors.

It is also a distinct build, and it is worth being explicit about what changes. Each occupant needs a position that is recognisably theirs, with its own power, its own network and its own literature. The graphics programme multiplies, because every occupant has brand guidelines and most of them will send artwork late. One organisation has to hold the organiser contract, the paperwork and the safety declarations for the whole footprint, and that should be decided before the design starts rather than after. Occupant count is the single most useful number you can give a stand builder for this kind of project, and the earlier it arrives the cheaper the stand gets.

March 2027: embedded world and ITB Berlin Fall on the Same Three Days

This is specific to 2027 and worth knowing early. ITB Berlin — one of the largest exhibitions held in Germany — has moved its 2027 edition to 16 to 18 March, which is exactly when embedded world runs in Nuremberg. ITB has stated that the change is a one-time adjustment made so that Muslim exhibitors and visitors can observe Eid al-Fitr at the end of Ramadan and then attend all three days of the show. In 2026 ITB ran from 3 to 5 March, well clear of embedded world.

For a visitor the two events barely interact; they are different industries in different cities. For anyone building a stand it is a capacity question. Two very large exhibitions running simultaneously pull hard on the same pool of installation crews, hauliers and hotel rooms across Germany during the same seventy-two hours, and that pool tightens months in advance rather than in the final weeks. The practical response is simple and it is entirely about timing: confirm the stand early for that edition, and let your builder allocate crew and freight as soon as the space is confirmed rather than when the design is approved.

The Date Slot Has Not Been Stable

embedded world is annual, but it does not sit in a fixed week and it has moved more than most German fairs. The 2024 edition ran 9 to 11 April. The 2025 edition ran 11 to 13 March. The 2026 edition ran 10 to 12 March. The 2027 edition runs 16 to 18 March. That is a swing of roughly a month across four years.

The practical consequence is that every internal deadline shifts with it — organiser ordering cut-offs, graphics sign-off, freight booking and, where a two-storey stand is involved, the structural approval submission. None of those are safe to copy from last year's project file. Check the current edition's dates on the organiser's own page rather than an aggregator; several listing sites were still showing superseded dates for both this show and ITB Berlin at the time this page was written.

Building From Frankfurt, Showing in Nuremberg

Our workshop is in Frankfurt and Exhibition Centre Nuremberg is around 220 kilometres away by road — a domestic run with no border and no customs file. We build and dry-assemble the complete structure on our own floor first, photograph it for your approval, then break it down and drive it south. You see the actual stand before it goes anywhere near the show.

That also means a problem is recoverable. If a graphic panel is damaged in transit we reprint it in Frankfurt and it goes down on the next run rather than becoming a hole in your back wall for three days. Nuremberg is one of our most frequent destinations across the year, and the crew who install your stand have worked these halls before.

Getting Started

Send us your stand size, your hall and stand number if NürnbergMesse has issued it, and — most importantly for this show — your demo list. How many positions have to run at once, what each one draws, whether any of them need a wired network connection, and how many screens are coming and how big they are. That list shapes the design more than any other information you can give us. You get a 3D design and an itemised all-in quote, at no charge and with no obligation.

embedded world is annual and most exhibitors here also attend one or two other European electronics or automation events, so a reusable system frame usually beats a one-off build — the structure stays in our Frankfurt warehouse and each show costs a graphics refresh rather than a rebuild. Our modular exhibition stands are built for exactly that pattern.

FAQ

embedded world 2027 — Questions and Answers

Real answers with real numbers. Click any question to expand.

When and where is embedded world 2027?

embedded world Exhibition&Conference 2027 runs from Tuesday 16 to Thursday 18 March 2027 at Exhibition Centre Nuremberg, Messezentrum 1. The halls open 09:00 to 18:00 on the Tuesday and Wednesday and 09:00 to 17:00 on the Thursday. The organiser is NürnbergMesse GmbH.

I thought embedded world was in March 2026 — did I miss it?

The 2026 edition ran from 10 to 12 March 2026 and has already taken place. The next edition is 16 to 18 March 2027. Because this show has moved its slot repeatedly — April in 2024, early March in 2025 and 2026, mid-March in 2027 — it is worth checking the year and the dates on the organiser's own page rather than on a listing site.

Is embedded world really on the same days as ITB Berlin in 2027?

Yes. ITB Berlin has moved its 2027 edition to 16 to 18 March, which is exactly when embedded world runs. ITB has said this is a one-time change so that Muslim exhibitors and visitors can observe Eid al-Fitr and then attend all three days. In 2026 ITB ran 3 to 5 March. The two shows are in different cities and different industries, so as a visitor you are unlikely to be choosing between them — but it does tighten crew, freight and hotel availability across Germany that week, which is a reason to book a stand early for that edition.

Can you run electronics demos at scale?

Yes, and it is the part of this show we plan first. A typical stand here needs anywhere from two to more than a dozen demonstration positions running simultaneously, each with bench space at working height, its own switchable socket, cable management that is built in rather than taped down, and in many cases a wired network connection. We take your demo list at the briefing stage and design the layout, the power distribution and the cable routing around it. Tell us how many positions have to run at once and what each one draws, and we will tell you what size of stand actually works.

Our stand hosts several partner companies — can you plan it that way?

Yes, and it is common at this show. A multi-occupant stand needs each occupant to have a recognisably separate position with its own power, network, literature space and branding, while the whole footprint runs on one organiser contract and one set of safety declarations. The number that matters most is the occupant count, and we need it before the design starts rather than after — it changes the layout completely and it drives the graphics schedule, which is usually the thing that runs late on projects like this.

Will Wi-Fi work on our stand?

Plan as though it will not. With more than a thousand exhibitors and tens of thousands of visitors, many of them demonstrating wireless protocols, the 2.4 GHz band in these halls is heavily congested from the first morning. Bluetooth pairing and mesh demonstrations that work reliably in a lab frequently fail on the show floor. We run wired network cabling to each demonstration position at the same time as the power, so anything critical has a hard connection, and we recommend a shielded enclosure or a short-range low-power configuration for demos that genuinely have to be over the air.

How much does a stand at embedded world cost?

Our brackets start at €4,500 for a 9 to 18 m² modular stand, €11,500 for a 24 to 48 m² custom build, and €34,000 for 50 m² and above. Those are all-inclusive build prices covering design, manufacture, graphics, road freight from Frankfurt, installation, dismantling and on-site supervision. They do not include the floor rental you pay NürnbergMesse, hall services ordered from the organiser, AV hire, rigging or catering.

What is not included in the price?

Floor space rental, which you contract directly with NürnbergMesse; hall services ordered through the organiser such as power connection fees, water where applicable, waste and cleaning; AV and screen hire if you are not bringing your own; rigging from the hall roof; catering; and your own travel and accommodation. Everything we build, transport, install and remove is inside the quoted figure.

Is there customs paperwork for a Nuremberg show?

Not for the stand. Our workshop is in Frankfurt and Nuremberg is a domestic road run of around 220 kilometres, so there is no border, no customs file and no clearance risk on the build itself. If your demonstration hardware is being shipped in from outside the EU that is a separate matter for your own freight forwarder, and it is worth starting early — prototype hardware attracts more questions at the border than finished product does.

How long does installation take?

For a modular stand up to about 18 m², one build-up day is normally enough. A 24 to 48 m² custom stand with multiple serviced demonstration positions usually needs two, mainly because power and network distribution have to be run and tested before the furniture goes in. Larger or two-storey builds need three or more. We work to the build-up window in the exhibitor manual for the edition and confirm it in writing once the schedule is issued.

How far in advance should we book?

Three to four months is comfortable for a custom stand in a normal year. For the 2027 edition specifically we would say earlier, because embedded world and ITB Berlin fall on the same three days and installation crews, hauliers and hotel rooms across Germany are all under pressure that week. If you are considering a two-storey stand, start sooner still — structural calculations and hall approval have fixed submission deadlines months ahead of build-up.

Do you handle the organiser paperwork?

Yes. Stand design approval, technical submissions, and the health-and-safety and structural declarations NürnbergMesse requires are handled by us as part of the build. On a multi-occupant stand we agree at the outset which organisation holds the exhibitor contract, because the paperwork follows that contract rather than following the individual occupants.

Can we reuse the stand at another show?

That is what the modular system is designed for. The aluminium frame comes back to our Frankfurt warehouse, is inspected and stored, and goes out again for the next event with reprinted graphics. Most exhibitors at this show also attend one or two other European events across the year, and over two or three shows a reusable frame is usually cheaper than a sequence of one-off builds.

Do you provide screens, or do we bring our own?

Either. Many exhibitors at this show bring their own panels because the demo hardware needs to be driven in a specific way, and we mount them — but we need the sizes and weights at design stage, because a large panel is a cantilever load and the mounting bays have to be reinforced in the frame. If you would rather we supply the screens, that is quoted as a separate line and is not inside the bracket prices above.

Can you build a two-storey stand at Exhibition Centre Nuremberg?

Yes, subject to hall-specific approval. Two-storey builds need static calculations submitted to NürnbergMesse by a fixed deadline well ahead of build-up, and approval is not automatic. Because the 2027 edition sits later in March than the 2026 one did, do not assume the deadline is in the same place relative to the show as it was last year. If a two-storey stand is even a possibility, we start the structural drawings at the same time as the design.

Do you have a crew on site during the show?

Yes. An on-site supervisor is included in every bracket and is present through build-up, the show days and the dismantle. For a stand with many demonstration positions that matters more than it does elsewhere, because the failures on this kind of stand are electrical and network failures and they need someone who knows how the stand was wired.

What happens to the stand after the show?

We dismantle it and remove it within the organiser's breakdown window. Modular frames return to the Frankfurt warehouse for reuse. Custom elements can be stored, reworked for the next event, or disposed of responsibly — we will tell you honestly which of those is worth paying for in your case.

Do you work with exhibitors who are not based in Germany?

Yes, and a majority of the stands we build at Nuremberg shows are for exhibitors headquartered somewhere else. The design conversation runs remotely, the approval is on photographs of the real dry-assembled stand rather than renders alone, and you meet the crew on site. If you are shipping demonstration hardware in from outside the EU, tell us early so the delivery window and the stand build sequence line up.

Which halls does embedded world use?

The footprint has grown over the years and it varies by edition, so we work from the current hall plan rather than from memory. One practical note: stand numbers at this show are hall-prefixed, so a code like 4A-633 tells you the hall before it tells you the position. Confirm your own hall and stand number with NürnbergMesse before anyone starts designing, because hall geometry and the position of the supply points affect the layout.

How do we start?

Send us the stand size, the hall and stand number if you have it, and your demonstration list — how many positions, what each draws, which need a network connection, and the screen sizes. You will have a 3D design and an itemised all-in quote back, free and with no obligation.

Ready to Exhibit

Let's plan your embedded world stand

Send us the show, the space and the demo list. You will have a 3D design and an all-inclusive quote back, with no obligation and nothing hidden below the line.

48hrFree 3D Design
€4,500+All-Inclusive
28 daysTo Show Floor
4.9Trustpilot4.9Google
WhatsApp us
WhatsApp us