Skip to content
EM-Power Europe 2027
SOL Germany · Munich

Exhibition Stand Builder for EM-Power Europe in Munich

Stands for halls B5 and C5 at Messe München, 8–10 June 2027 — built and dry-assembled in our Frankfurt workshop, then driven 390 kilometres south and installed by our own crew. Planned around what an energy-management stand actually does all day: hold conversations, run software that has to stay connected, and send people away with something to take to a procurement committee.

€4,500+From
500+Stands
15 YrsEurope
4.9Trustpilot4.9Google
Browse Designs
SOL Germany exhibition stand with an enclosed meeting room and screen wall at Messe München
8–10 JUN 2027
Halls B5 & C5, Munich
8–10 June 2027Show Dates
Messe München · B5, C5Venue
AnnualCycle
2,600 expectedAlliance Exhibitors
Solar PromotionOrganiser
100,000+ expectedAlliance Visitors
Event Overview

EM-Power Europe 2027 — Everything You Need to Know

EM-Power Europe is the exhibition for energy management, smart grids and integrated energy solutions, and it runs inside The smarter E Europe in the same Munich week as three other shows. Two things follow from that, and both of them change the stand before they change the marketing: your visitor holds a badge that opens all four halls, and almost nothing you sell here can be put on a plinth.

EM-Power Europe 2027 — At a Glance

Dates
8–10 June 2027 (Tuesday to Thursday)
Opening hours
09:00–18:00 Tuesday and Wednesday, 09:00–17:00 Thursday
Venue
Messe München — halls B5 and C5, plus the outdoor area
Conference
EM-Power Europe Conference, 7–8 June 2027 at ICM München — it opens the day before the exhibition
Motto
Empowering Grids and Prosumers
Part of
The smarter E Europe, alongside Intersolar Europe, ees Europe and Power2Drive Europe
Scale
The organiser expects 2,600 exhibitors, 200,000 m² and over 100,000 visitors — stated as the total across all four shows, not EM-Power on its own
Tickets
The ticket shop opens in February 2027

Why Exhibitors Choose SOL Germany for EM-Power Europe

Most of what gets sold in halls B5 and C5 is invisible. Flexibility trading, virtual power plant platforms, distribution-network monitoring, metering and billing infrastructure, energy-as-a-service contracts — none of it photographs, and none of it fits on a display plinth. What actually converts is a seated conversation of fifteen to forty minutes with somebody who cannot sign anything on the day. So we size these stands by seats first and square metres second: how many parallel conversations do you need to run at eleven o'clock on the Wednesday, how many of them have to be out of earshot, and what happens to the eleventh person who walks up while all your tables are full.

The build itself is deliberately unglamorous. Frame, meeting room, screen wall and counter are assembled and inspected on our own floor in Frankfurt, photographed for your approval, then driven roughly 390 kilometres to Munich. Domestic road freight — no border, no customs file, no temporary-import paperwork sitting on the critical path. Our own crew installs it, and the supervisor who signs off the dry build in Frankfurt is the one standing in B5 when the hall opens.

One thing we will tell you before you ask us to design anything: the venue wireless network is not a demonstration platform. If your product is a live dashboard pulling from a cloud instance, the data connection is a stand service with its own order deadline, and it needs to be decided at the same time as the layout — not discovered in the last week. We would rather have that conversation in December than on the Monday of build-up.

What you sign is one quote. There is no second invoice arriving three weeks after the show closes.

From Our Project Managers

What We Have Learned Building in Halls B5 and C5

Six things worth knowing before you brief anyone — operational detail that does not appear on an organiser page.

CD

Count Seats, Not Square Metres

This is the EM-Power-specific one. At a hardware fair the stand is a display and the meeting table is an afterthought. Here it is the reverse. A grid operator or a municipal utility does not walk away with a sample; they walk away with a follow-up date. Every stand we have built for this kind of floor has run out of seats before it ran out of floor, usually mid-morning on the Wednesday. Work out your realistic peak — number of staff who can hold a technical conversation, multiplied by the meetings each can take before they are spent — and then design backwards from that number. A 24 m² stand with three usable seated positions outperforms a 40 m² stand with one table and a lot of graphics.

The Badge Opens All Four Halls, So Most of Your Traffic Is Passing Through

A visitor to The smarter E Europe can walk from Intersolar into B5 without thinking about it, and a large share of the people in front of your stand did exactly that. They did not come for you and they have not read your name. That changes the front two metres of the stand more than anything else: the header has to say what the product does, not what the company is called, and it has to be legible at walking pace from the aisle. Company name plus a category word is not enough here — half the hall is a category word.

Order the Wired Line, and Order It Early

Every year somebody plans a live platform demo over the hall wireless and every year it degrades at exactly the moment the hall fills. A dedicated wired connection is orderable through the venue's technical services, it costs real money, and it has an order deadline that sits well before most exhibitors have finished arguing about the renders. We ask for the demo requirement before we draw the layout, because it also decides where the cable enters the stand and therefore where the meeting room can go. A local cached copy of the demo, running on a machine under the counter, is a sensible second line of defence regardless.

Screens Are a Mounting Problem and a Heat Problem

Screen walls on this floor are large and there tend to be several of them. The weight is manageable; the awkward parts are the fixing detail behind the panel, the cable route that must not cross a walkway, and the heat. Four large panels inside a glazed meeting room with the door closed and five people in it becomes uncomfortable within twenty minutes, and an uncomfortable meeting room ends meetings early. We plan ventilation and panel spacing into the room rather than treating the room as a box we put screens into afterwards.

One Build-Up Window, Four Shows, One Yard

The alliance builds as a single operation. That means the delivery yard, the lifts and the waste routes are shared across four exhibitions at once, and the pinch is not the hall, it is getting into it. Late slots are the ones that go wrong. We book freight to arrive early in the window rather than comfortably inside it, and we build tight enough in Frankfurt that if a slot slips we are still installing a known quantity rather than solving problems on the floor.

Design for the Second Meeting, Not the Signature

Nobody buys a distribution-network platform at a trade fair. What you are actually collecting is qualified follow-ups, and the stand either helps with that or gets in the way. Somewhere to write, a surface that is not sticky, a lead-capture flow your staff will actually use when they are tired on day three, and a quiet corner for the one conversation that turns serious. We have watched good stands lose leads because the only place to sit was the same place the coffee machine was.

Transparent Pricing

EM-Power Europe 2027 Stand Pricing

Real ranges, in euros, for a stand delivered to Messe München and taken away again afterwards. Energy-management stands sit mid-band for their size rather than high — there is less structure and less rigging than a hardware floor needs — but they carry more enclosed room and more screen mounting, and that is where the money goes.

Essential — 9–18 m²

From €4,500
Best for: software and platform vendors attending for the first time, metering and communications suppliers, consultancies testing the floor
  • Modular aluminium system frame
  • Backlit fabric back wall, full height
  • One branded counter with lockable storage
  • Two seated meeting positions
  • Standard LED top-rail lighting
  • Graphics design and print (two revision rounds)
  • Frankfurt → Munich road freight
  • Installation, dismantling and organiser paperwork

Not included: enclosed meeting room, wired data connection, screen hire, three-phase supply.

Premium — 60 m² and above

From €34,000
Best for: utilities and international vendors running a full meeting programme across all three days, or a two-storey stand with a hospitality deck
  • Two or more enclosed meeting rooms, acoustically separated
  • Optional double-decker with meeting deck above
  • Structural drawings and static calculation for organiser approval
  • Large-format screen wall and presentation position
  • Hospitality area and dedicated staff space
  • Bespoke joinery and finished flooring
  • Full lighting and cable-management design
  • Project manager and supervisor on site throughout

Not included: floor rental, venue services, catering, AV hire and staffing.

Recent Builds

Stands We Have Built

Recent stands from our Frankfurt workshop, delivered across German and European venues.

A Practical Guide to Exhibiting at EM-Power Europe 2027

EM-Power Europe is the international exhibition for energy management and integrated energy solutions, running under the motto Empowering Grids and Prosumers. The 2027 edition takes place from Tuesday 8 to Thursday 10 June 2027 at Messe München, in halls B5 and C5 together with the outdoor area. Doors open at 09:00 each day and close at 18:00 on the Tuesday and Wednesday and at 17:00 on the Thursday.

The EM-Power Europe Conference runs on 7 and 8 June at the ICM München, which means it starts the day before the exhibition floor does. If your team is speaking or attending, your stand has to be finished and staffed before your speakers disappear into a conference room. The ticket shop for the exhibition opens in February 2027.

If you exhibited at the 2026 edition, note that it ran from 23 to 25 June. The 2027 dates sit roughly two weeks earlier. Every deadline that hangs off the show date — space application, services orders, freight slots, static approval for anything two-storey — moves with it.

EM-Power Is One Show Inside Four, and the Headline Numbers Are Not Yours

The smarter E Europe is an alliance of four exhibitions held in the same week at Messe München: Intersolar Europe for solar, ees Europe for storage, Power2Drive Europe for charging infrastructure and electric mobility, and EM-Power Europe for energy management and grids. One ticket admits a visitor to all four.

This matters when you read scale figures. The organiser expects around 2,600 exhibitors, 200,000 m² of exhibition space and more than 100,000 visitors — and states plainly that these are totals for The smarter E Europe as a whole. They are not EM-Power Europe's numbers. Sizing a stand or a staffing rota against the alliance total will produce a stand that is too big and a team that spends three days waiting.

You will also see a figure of roughly 2,737 exhibitors and 107,000 visitors circulating on listing sites, attributed to 2025 in some places and 2026 in others. It is alliance-wide in any case and the attribution is not resolvable, so we do not use it and neither should your internal business case.

The Buyer in B5 Is a Utility, Not a Manufacturer

The organiser's own visitor targets for EM-Power are energy suppliers and municipal utilities, grid operators, project developers, electrical installers, energy service providers, power-trading and flexibility specialists, energy consultants and managers, decision-makers from industry, commerce and real estate, and investors and analysts.

That is a procurement audience, not a browsing one. They arrive with a shortlist or a problem, they ask specific questions, and they leave to consult somebody who was not at the show. Almost none of them can commit on the floor. The practical consequence is that stand success at EM-Power is measured in qualified conversations and scheduled follow-ups, not in footfall, and the stand should be built for the first of those rather than the second.

It also means your staffing profile is different. A hardware floor can be covered by sales people with a demo unit. This floor needs at least one person per shift who can answer a question about integration, data models or regulatory compliance without leaving to find someone.

Halls B5 and C5, and What Is Around Them

EM-Power Europe occupies halls B5 and C5 at Messe München, plus space in the outdoor area. The other three exhibitions in the alliance sit in the surrounding halls, which is the single most useful fact about your position: you are on a route, not at a destination.

Traffic behaves accordingly. A meaningful share of the people passing your stand walked in from a neighbouring hall and have no prior intention of stopping. The first two metres of the stand do the qualifying work. A header that states the function — grid monitoring, submetering, flexibility trading, building automation — is worth more than a larger logo, because at walking pace the logo tells a stranger nothing.

Aisle position within the hall is worth paying attention to when you apply for space. Corner and head-of-aisle positions are disproportionately valuable on a pass-through floor because they give you two approach directions instead of one, and they are the first to go.

Designing a Stand for a Product You Cannot Put on a Plinth

Start with the meeting arithmetic. Decide how many simultaneous seated conversations you need at peak, how many of those must be private, and how long each one runs. Three positions at thirty minutes each across a seven-hour day is a theoretical forty-two meetings and a realistic twenty-five once you allow for breaks, overruns and the times when nobody comes. That number is your stand size. Everything else is decoration around it.

Then decide what is actually shown. A screen wall running a looping animation is wallpaper; a screen running a live instance that a visitor can steer is a demonstration. The second one requires a reliable connection, a machine that will not go to sleep, and somebody who can drive it. It also justifies its own position on the stand, usually standing height, near the aisle, separate from the seated area so that a demo does not block a meeting.

Acoustics are the underrated part. Two open meeting tables 1.5 metres apart in a busy hall means neither conversation is comfortable and neither is confidential. If your conversations involve numbers a customer would not say out loud, you need at least one enclosed room, and an enclosed room needs ventilation and a door that closes. Half-height screening looks like privacy in a render and provides none in a hall.

Finally, plan the exit. Every good conversation should end with something happening — a calendar invite, a document sent, a named contact written down. Build the surface and the workflow for that into the stand rather than leaving it to a phone balanced on a counter.

Building in Frankfurt, Showing in Munich

We build in our own workshop in Frankfurt. The structure is assembled and inspected there, photographed for sign-off, then dismantled and loaded. Munich is roughly 390 kilometres by road — domestic freight, no border, no customs documentation, no temporary-import formalities on the critical path. For an exhibitor whose product ships in from outside the EU, that separation is useful: your equipment can have its own timeline without the stand being tied to it.

Build-up for The smarter E Europe is a single shared operation across all four exhibitions, which makes the delivery yard, not the hall, the bottleneck. We book freight into the early part of the window rather than the middle, and we keep the on-floor assembly sequence short by doing as much of the work as possible in Frankfurt.

A normal timeline is about twenty-eight days from an approved design to a stand standing on the floor. Space application and any two-storey static approval sit earlier than that and are organiser deadlines, not ours. If you are considering a meeting deck above the stand, start the conversation at least four months out; the drawing and approval process is the long pole, not the build.

Because EM-Power runs annually and the layout requirement rarely changes much between editions — same meeting count, refreshed messaging — a reusable system frame tends to pay for itself quickly here. The structure stays in our Frankfurt warehouse between editions and the next year costs a graphics refresh and freight rather than a rebuild. Our modular exhibition stands are built for exactly that pattern.

FAQ

EM-Power Europe 2027 — Frequently Asked Questions

Real answers with real numbers. Click any question to expand.

When and where is EM-Power Europe 2027?

EM-Power Europe 2027 runs from Tuesday 8 to Thursday 10 June 2027 at Messe München, in halls B5 and C5 plus the outdoor area. Opening hours are 09:00 to 18:00 on the Tuesday and Wednesday and 09:00 to 17:00 on the Thursday.

Is EM-Power the same event as Intersolar?

No, and this is the question we are asked most. They are two separate exhibitions with separate exhibitor lists and separate exhibition segments, held in the same week at the same venue under a shared platform called The smarter E Europe. Intersolar Europe covers the solar industry — modules, inverters, mounting, project development. EM-Power Europe covers energy management, smart grids, metering, flexibility and integrated energy solutions. One visitor ticket admits you to both, which is why they are so often described as one event, but you apply for space, pay for space and are listed separately.

Can one stand cover both EM-Power and Intersolar?

Not as a single stand — they occupy different halls, so you would be booking a stand in each. What does carry across is the visitor: because the badge is shared, a stand in B5 sees Intersolar visitors and vice versa. If your product genuinely spans both, the practical approach is one properly sized stand in the hall matching your primary buyer, with messaging that a visitor from the other hall can read at walking pace. Two undersized stands in two halls is the more expensive way to do worse.

What is The smarter E Europe?

It is the platform under which four exhibitions run together at Messe München in the same week: Intersolar Europe, ees Europe, Power2Drive Europe and EM-Power Europe. It is organised by Solar Promotion GmbH together with Messe München. Visitors buy one ticket and move freely between all four.

Are the 100,000 visitors all EM-Power visitors?

No. The organiser states 2,600 expected exhibitors, 200,000 m² and more than 100,000 visitors as totals for The smarter E Europe as a whole — all four exhibitions combined. EM-Power Europe is one part of that. Any business case built on the alliance figure as if it were EM-Power's own will overstate the opportunity substantially.

I thought EM-Power was in June 2026 — did I miss it?

The 2026 edition ran from 23 to 25 June 2026 and has passed. The next edition is 8 to 10 June 2027. Some listing sites are still selling the 2026 dates. Note that 2027 sits about two weeks earlier in June than 2026 did, so every deadline that hangs off the show date moves earlier with it.

Which halls does EM-Power Europe use?

Halls B5 and C5 at Messe München, plus space in the outdoor area. The other three exhibitions in the alliance occupy the surrounding halls, which means B5 and C5 carry a lot of walk-through traffic from neighbouring shows.

What does a stand at EM-Power Europe 2027 cost?

From €4,500 for a 9 m² modular stand with a seated position, through roughly €11,500 to €26,000 for a custom stand between 24 and 48 m² with enclosed meeting rooms, to €34,000 and upwards for a premium or two-storey build. The figure depends far more on how many enclosed rooms you need than on the floor area itself.

What is included in that price?

Free 3D design before you sign anything, the build and inspection at our Frankfurt workshop, road freight to Messe München, installation and dismantling by our own crew, an on-site supervisor for the duration, graphics design and print, the organiser paperwork, and a project manager who stays the same person from brief to dismantle.

What is not included?

Floor rental paid to the organiser, services you order directly from Messe München — electricity, water, the data connection, rigging — plus your own travel, accommodation, catering and any AV or furniture hire beyond the specification. We list these separately in the quote rather than folding them in, so you can see what is ours and what is the venue's.

Do I really need a wired data connection?

If your demonstration depends on a live cloud instance, yes. Hall wireless is shared with tens of thousands of devices and degrades exactly when the hall is busiest, which is the only time the demo matters. A wired line is orderable from the venue's technical services and has its own order deadline, which sits earlier than most exhibitors expect. We also recommend a locally cached version of the demo running on a machine under the counter as a fallback.

How many meeting rooms should we have?

Work it backwards from staffing. Count the people on the stand who can hold a technical conversation, decide how many of those conversations must be private, and build that many enclosed positions. For most exhibitors between 24 and 48 m² that is one enclosed room plus two open seated positions. Beyond about 60 m² a second enclosed room usually earns its space, because the failure mode above that size is a queue rather than an empty stand.

Can we run large screens on the stand?

Yes. The considerations are the fixing detail behind the panel, cable routing that does not cross a walkway, and heat — four large panels inside a closed meeting room will make it uncomfortable within about twenty minutes unless ventilation is planned in. We design the room around the screens rather than adding screens to a finished room.

How long does the whole process take?

About twenty-eight days from an approved design to a stand standing on the floor, with the 3D design itself back within 48 hours of your brief. Organiser deadlines sit earlier and are outside our control: space application, and static approval if you want anything two-storey. For a double-decker, start four months out.

Do you build in Munich or ship from Frankfurt?

We build and dry-assemble in our own Frankfurt workshop, photograph it for your approval, then transport it roughly 390 kilometres by road to Munich and install it with our own crew. Nothing is subcontracted to a local builder we have not worked with, and the supervisor who signed off the build in Frankfurt is on the floor in Munich.

Can I reuse the stand at the next edition?

Yes, and for an annual show it is usually the sensible choice. A modular system frame stays in our Frankfurt warehouse between editions; the following year costs new graphics and freight rather than a new build. Bespoke joinery and finished flooring are the parts that do not travel well between editions, which is one reason we tend to put the custom money into the meeting rooms rather than the shell.

Do you handle the organiser paperwork?

Yes — stand construction submissions, the forms Messe München requires and the deadlines that go with them. We do not apply for your floor space, because that is a commercial contract between you and the organiser, but we will tell you what to ask for and when.

Can we have a two-storey stand?

Yes, subject to organiser approval and a static calculation. A meeting deck above the stand is a good fit for this floor specifically because it buys quiet meeting space without buying more floor. It is also the longest lead item on the project — drawings and approval, not construction. Four months minimum.

What size stand do I actually need?

The honest answer for most first-time exhibitors here is smaller than they think, but with more enclosed space. A 24 m² stand with one proper meeting room and two open seats will out-perform a 40 m² open stand with a lot of graphics and one table, because the conversations on this floor are long and semi-private. If we think you are over-buying floor, we will say so before you sign.

Who is on site during the show?

A supervisor from our crew for build-up, the show days and dismantle, plus your project manager reachable throughout. If a panel is damaged in transit or a fixing works loose on day two, it gets dealt with without you making a phone call to Frankfurt.

Ready to Exhibit

Let's plan your EM-Power Europe stand

Send us the floor size you are considering, how many conversations have to happen at once, and what has to run live. You get a 3D design and a single all-inclusive price back within 48 hours.

48hrFree 3D Design
€4,500+All-Inclusive
28 daysTo Show Floor
4.9Trustpilot4.9Google
WhatsApp us
WhatsApp us