Skip to content
E-Waste World Expo 2027
SOL Germany · Frankfurt

Recycling and ITAD Stand Builder for the E-Waste World Expo in Frankfurt

Stands for Hall 3 at Messe Frankfurt, 12–13 May 2027 — built twenty minutes from the halls and installed by our own crew. Planned around what a two-day show with sorting machinery on the floor actually demands: load-bearing plinths, a short build window and messaging that reads from the aisle.

€4,500+From
500+Stands
15 YrsEurope
4.9Trustpilot4.9Google
Browse Designs
SOL Germany exhibition stand for an electronics recycling exhibitor in Hall 3 at Messe Frankfurt
12–13 MAY 2027
Messe Frankfurt, Hall 3
12–13 May 2027Show Dates
Messe Frankfurt, Hall 3Venue
AnnualCycle
400+Exhibitors
Trans-World EventsOrganiser
Two daysDuration
Event Overview

E-Waste World Expo 2027 — Everything You Need to Know

Four co-located expos share one hall, one badge and one two-day window at Messe Frankfurt. That combination — short, dense and mixed — decides almost everything about how a stand here should be built.

E-Waste World Expo 2027 — At a Glance

Dates
12–13 May 2027 (Wednesday and Thursday) — two days only
Venue
Messe Frankfurt, Hall 3
Cycle
Annual, at Messe Frankfurt, since the 2019 debut
Format
Four co-located expos on one floor: E-Waste World, Battery Recycling, Metal Recycling, and ITAD & Circular Electronics
Admission
Free to attend; one registration covers all four exhibitions and all four conference tracks
Exhibitors
The organiser projects over 400 companies across the four shows for 2027
Visitors
The organiser projects over 5,000 across the four shows; earlier editions are quoted in the four-to-four-and-a-half-thousand range
Conference
Four parallel tracks with, by the organiser's count, more than 180 speakers — held inside the same hall as the exhibition
Organiser
Trans-World Events Ltd, Guildford, United Kingdom
Slot change
The 2026 edition ran 17–18 June; 2027 moves roughly five weeks earlier, to 12–13 May

Why Exhibitors Choose SOL Germany for E-Waste World Expo

Our workshop sits on Hanauer Landstraße in the east of Frankfurt, about twenty minutes from the exhibition grounds. On a five-day fair that proximity is a convenience. On a two-day show it changes the arithmetic. Freight out, freight back, crew accommodation and travel are fixed costs — they do not shrink because the doors are only open for forty-eight hours. On a short show those fixed costs land on a much smaller return, which is why a stand trucked in from four hundred kilometres away can cost meaningfully more here than the same stand at a week-long fair, for the same square metres of finished wall.

The second consequence of a two-day show is the build window. Everything has to be right the first time, because there is no third morning in which to fix it. We pre-assemble every structure on our own floor first and photograph it for sign-off, so what arrives in Hall 3 has already stood up once. If a graphic panel is damaged in transit, it is reprinted in Frankfurt overnight rather than becoming a gap in your back wall.

The third is what this particular floor carries. Shredders, granulators, optical sorters, battery modules and pallets of feedstock are not display objects — they are loads, and they set the floor build before any styling decision is made. We ask for crated weight, footprint and lifting requirements at briefing stage, not after the design is approved, because on a two-day build there is no room to discover a plinth problem on site.

What you sign is one quote. There is no second invoice arriving three weeks after the show closes.

From Our Project Managers

What We've Learned Building on the Messe Frankfurt Floor

Practical notes from the SOL Germany team — the things the exhibitor manual does not tell you.

CD

Two Days Is the Whole Planning Constraint

Almost every mistake we see here traces back to planning a two-day show as if it were a normal one. Build-up and breakdown are compressed, the crew has one shift rather than three to solve problems, and your team is on the floor for a total of roughly sixteen open hours. That last number is the one to design against: everything on the stand has to earn its place within sixteen hours. A large meeting room that would pay for itself over five days often does not here, and the floor it consumes is worth more as open aisle frontage.

Four Shows Share One Hall — Know Which Neighbours You Get

E-Waste World, Battery Recycling, Metal Recycling and ITAD & Circular Electronics run side by side on one floor under one badge, and a visitor walks all four without noticing a boundary. The practical effect is that your immediate neighbours may be from a different part of the chain entirely — a battery reprocessor next to an ITAD data-erasure specialist next to a shredder manufacturer. Ask which zone your stand number falls in before the design is drawn. It changes what your back wall has to say in its first three words, because half the people reading it did not come for your sector.

The Date Moved Five Weeks Earlier — Your Old Calendar Is Wrong

The 2026 edition ran in mid-June. The 2027 edition runs 12–13 May. That is roughly five weeks earlier, and every dependent deadline moves with it: venue services orders, freight booking, graphics sign-off, print. Exhibitors working from last year's internal timeline are the ones who call us in March having lost a month they thought they had. If you exhibited in 2026, rebuild the schedule from the 2027 date rather than shifting last year's plan sideways.

Weigh the Machine Before You Draw the Stand

A granulator or an optical sorting unit weighs several times what a display cabinet weighs, and it usually arrives crated with a specified lifting point rather than on castors. We need the crated weight, the footprint, the lifting requirement and the power draw at briefing stage, because those four numbers determine the floor build, the access route and the order in which the stand goes up. On a compressed build window the equipment normally has to land before the structure closes around it — get that sequence wrong and the unit does not go in at all.

Battery Samples Are a Permissions Question, Not a Packing Question

Lithium cells, modules and packs brought as exhibits sit under transport and venue rules that are separate from anything to do with your stand, and they are decided well before build-up rather than at the door. Tell us at briefing stage if you intend to display live cells or damaged-cell examples, so the declaration goes in with the venue orders rather than becoming a conversation on the loading bay. It is the single item on this floor most likely to be discovered late.

The Conference Empties the Aisles, Then Refills Them

Four parallel conference tracks run inside the same hall across the two days, with a speaker list the organiser puts above 180. In practice that means footfall is not steady — it thins during sessions and arrives in a wave when they break. Design for the wave. Wide open frontage, a headline readable at four or five metres, and enough standing room to absorb six people at once beats a considered layout that only works one conversation at a time. The stands that struggle here are the ones built for a slow browse.

Transparent Pricing

What an E-Waste World Stand Actually Costs

On a two-day show the fixed costs — freight, crew, install and dismantle — are a larger share of the total than they are at a week-long fair. Building locally is how that share comes down, and it is the honest reason the brackets below sit where they do.

Essential — 9–18 m²

From €4,500
Best for: consultancies, compliance and data-erasure specialists, material traders, first-time exhibitors testing the show
  • Modular aluminium system frame
  • Backlit fabric back wall, full height
  • One branded reception counter
  • Standard LED top-rail lighting
  • Headline sized to read from across the aisle
  • Graphics design and print (two revision rounds)
  • Frankfurt workshop to Hall 3 — a twenty-minute run, no long-haul freight
  • Installation, dismantling and organiser paperwork

Not Included (Optional): floor space rental, venue services orders, reinforced equipment plinth, enclosed meeting room.

Premium — 50–100+ m²

From €34,000
Best for: full-line plant manufacturers, groups exhibiting across more than one of the four co-located shows, brands treating Frankfurt as their flagship
  • Architectural custom build, optional double-decker
  • Multiple enclosed meeting rooms
  • Heavy-load flooring engineered for running plant
  • Several independently serviced equipment positions
  • Hanging sign where Hall 3 permits
  • Full AV package and demonstration stations
  • Technical back-of-house and storage
  • Priority workshop build slot

Not Included (Optional): floor space rental, rigging fees, AV hire beyond the package, catering.

Recent Builds

Stands We Have Built

Stands delivered across German and European industrial trade fairs, including repeat builds in the Messe Frankfurt halls.

A Guide to E-Waste World Expo for First-Time Exhibitors

E-Waste World Expo runs 12–13 May 2027 at Messe Frankfurt, in Hall 3. It is organised by Trans-World Events and has been held annually since its 2019 debut. What is sold as one event is really four: E-Waste World Expo, Battery Recycling Expo, Metal Recycling Expo, and ITAD & Circular Electronics Expo occupy the same hall, and a single free registration admits a visitor to all of them and to all four conference tracks.

Two facts about the 2027 edition should shape your planning before anything else. The first is the length: two days, roughly sixteen open hours in total. The second is the date itself. The 2026 edition ran 17–18 June; 2027 sits five weeks earlier, on 12–13 May. If you exhibited last year and are working from last year's timeline, every deadline in it is now wrong.

Who Exhibits Here and What Visitors Actually Want

The floor covers collection and take-back, sorting and shredding technology, urban mining and raw-material recovery, secure data erasure and IT asset disposition, refurbishment and reuse, battery recycling, and the recovery of metals and critical raw materials. Exhibitors range from consultancies and compliance advisers with nothing physical to show, through technology vendors, up to manufacturers of complete processing lines.

The visitor is a recycler, a plant operator, an ITAD provider, a producer-responsibility organisation, a materials buyer or a manufacturer trying to work out what happens to their product at end of life. They arrive with a specific commercial question far more often than with general curiosity — what your line throughputs, what purity it achieves, what it costs to run, whether your data-erasure process carries a certificate their auditor will accept. Answer the first of those questions on the wall and you shorten every conversation that follows.

Regulation is the other constant. WEEE obligations, battery regulation, critical raw material policy and extended producer responsibility all carry dates attached, and where your offer sits against them is qualifying information. It belongs at readable size on the stand, not in a folder on the counter.

Four Shows, One Badge — the Thing First-Time Exhibitors Miss

Because the four expos share a hall and a registration, the person standing in front of your stand may well have come to see something else. Someone walking the battery zone passes the shredder manufacturers on the way, and the ITAD visitor crosses the metals floor without a door in between. This is an advantage — your addressable audience is larger than the show you booked — but only if your stand is legible to a stranger.

In practice that means the first line on your back wall should say what you do rather than who you are. A company name and a tagline works at a single-sector fair where everyone in the hall already knows the category. Here it does not. It also means the choice of which of the four shows to book under matters less than exhibitors expect: the badge is shared, the hall is shared, and stand position within the hall does more for your traffic than the label on your booking. Ask the organiser which zone your stand number sits in, and tell us, because it changes what we design.

Stand Size: Choosing Between 9, 18, 24 and 48 Square Metres

Nine square metres works for consultancies, compliance specialists, certification bodies, materials traders and software vendors — anyone whose product is a service or a specification rather than a machine. You get a counter, a back wall and standing conversations. What you cannot do at this size is show equipment with any circulation around it.

Eighteen square metres is the practical size for a technology vendor with a component, a sample rack or a screen-based demonstration, and it is the largest footprint we would attempt without a load-rated plinth.

Twenty-four is where a real machine becomes possible: enough floor for the plinth, the power run and a route for visitors to walk around the unit rather than past it. If you intend to bring a granulator, a sorter or a working cell-testing rig, treat 24 m² as the working minimum.

At 48 m² you can run a demonstration and still hold a private conversation, which matters when a plant operator wants to discuss a project rather than a product. From 80 m² upward a double-decker adds meeting capacity without eating the ground-floor area that heavy equipment needs — though on a two-day show it is worth asking honestly how many meetings a raised deck will actually host in sixteen open hours.

What an E-Waste World Stand Costs by Size

Ranges below are all-in for design, fabrication, graphics, local delivery, install and dismantle. They exclude the floor space rental you pay to the organiser, and the electrical, rigging and cleaning orders placed with Messe Frankfurt.

  • 9 m² modular: €4,100–€8,700
  • 18 m² modular: €4,800–€10,100
  • 24 m² custom with one load-rated equipment position: €11,500–€15,000
  • 30 m² custom with enclosed meeting room: €15,000–€19,000
  • 48 m² custom with demonstration area and meeting room: €19,000–€26,000
  • 80 m² premium or double-decker: €34,000–€48,000

Common Mistakes, in Order of Frequency

The most common is planning a two-day show on a five-day mental model — over-building meeting space, under-building aisle frontage, and budgeting freight as if it were amortised across a week. The second is shifting last year's timeline sideways instead of rebuilding it from the new May date. The third is giving us equipment weights after the design is approved rather than before, which forces a floor rebuild on a build window that has no slack in it. The fourth is a back wall that names the company but not the capability, on a floor where most passers-by came for one of the other three shows. The fifth is treating lithium samples as a packing detail rather than a permission that has to be filed in advance. All five are settled at briefing stage or not at all.

Getting Started

Send your stand size, your stand number and zone if the organiser has issued them, and an equipment list — crated weight, footprint, lifting requirement, power draw, and whether anything you are bringing contains cells. That last line changes the paperwork more than anything else you can tell us. You get a 3D design and an itemised all-in quote, at no charge and with no obligation.

Because this show is annual, in one hall, and only two days long, a reusable system frame is an unusually easy case to make here — the structure stays in our Frankfurt warehouse between editions, travels twenty minutes rather than four hundred kilometres, and the next edition costs a graphics refresh rather than a rebuild. Our modular exhibition stands are built for exactly that pattern.

FAQ

E-Waste World Expo 2027 — Frequently Asked Questions

Real answers with real numbers. Click any question to expand.

When and where is E-Waste World Expo 2027?

12–13 May 2027 at Messe Frankfurt, in Hall 3. It is organised by Trans-World Events and runs annually. Note that the 2026 edition was held in mid-June, so the 2027 slot is roughly five weeks earlier than the one you may remember.

There are four shows here. Which one do I actually book?

E-Waste World, Battery Recycling, Metal Recycling, and ITAD & Circular Electronics all run in the same hall, and one free visitor registration admits people to all four plus every conference track. So the label you book under matters less than exhibitors expect. Book under the show that matches your sector for the exhibitor listing and the conference programme, then focus your effort on stand position within the hall — that does far more for your traffic than the badge on your booking.

How much does a stand cost?

From €4,500 to around €48,000 depending on size and what you are bringing. A modular 18 m² sits in the €4,800–€10,100 range. A 24 m² custom stand with one load-rated equipment position is typically €11,500–€15,000. A 48 m² with a demonstration area and a meeting room runs €19,000–€26,000. Premium and double-decker builds from 80 m² start around €34,000.

What is not included in the price?

Three things. The floor space rental, which is between you and the organiser. Venue orders placed with Messe Frankfurt — electrical supply, rigging, waste removal, daily cleaning. And specialty add-ons: AV beyond the listed package, furniture beyond the standard set, catering, and staffing during the show.

Does a two-day show change how the stand should be designed?

Substantially. Your team is on the floor for roughly sixteen open hours in total, so every square metre has to earn its place inside that window. We usually recommend trading enclosed meeting space for open aisle frontage at the smaller sizes, and sizing the headline to read from four or five metres rather than from the counter. The stands that underperform here are the ones designed for a slow browse.

Can the stand carry a shredder, granulator or sorting unit?

Yes, and it is the normal case at 24 m² and above. We engineer the plinth to the machine's real crated weight, plan the access route so the unit lands before the structure closes around it, and design the three-phase distribution into the build. Send us the crated weight, footprint, lifting requirement and power draw at briefing stage.

We want to display lithium cells or battery modules. Is that a problem?

It is a permissions question rather than a stand question, and it is decided in advance rather than at the loading bay. Transport rules and venue rules both apply, and damaged-cell examples are treated differently from new cells. Tell us at briefing stage and the declaration goes in alongside the venue orders. This is the item most often discovered too late on this floor.

Is there customs to pay on the stand?

No. Messe Frankfurt is our home venue. We build the stand in our own workshop on Hanauer Landstraße and drive it about twenty minutes to Hall 3 — no long-haul freight, no border, no customs file on the stand itself. Equipment you import from outside the EU is a separate matter and stays with you.

Why does building locally matter more at this show than at others?

Because the show is short. Freight out, freight back, crew travel and accommodation are fixed costs that do not shrink when the doors are only open for two days, so they land on a much smaller return than they would at a week-long fair. On a two-day show that fixed block is a visibly larger share of the total, which is why a stand trucked in from several hundred kilometres away can cost noticeably more here for the same finished square metres.

Which hall and zone will I be in?

Hall 3 is the exhibition hall. Zone and stand allocation are set by the organiser. Ask which of the four co-located shows your stand number falls within and tell us, because your immediate neighbours may be from a different part of the chain and that affects what the back wall needs to say.

Do you handle the organiser and venue paperwork?

Yes — electrical orders, rigging permissions, waste removal, daily cleaning, crew passes and build-up access. We file on the day a contract is signed. On a two-day tenancy the build-up window is short and the services deadlines fall well before it, so filing late is the one error that cannot be recovered.

How long does install take?

A modular 9–18 m² stand goes up in one shift. A 24–48 m² custom stand with equipment takes a day plus positioning and commissioning time for the machine. Premium builds use the full window. Every stand is pre-assembled at our workshop first, which matters more here than usual — a two-day show gives you no spare morning to solve a problem discovered on site.

When do I need to lock the design?

For a mid-May show, early March is comfortable. But equipment details bind earlier than the design does: if you are bringing a machine or anything containing cells, we need those specifications well before the visual design is final, because they determine the floor build and the paperwork.

How many staff should I plan for?

On 18 m², two to three. On 24 m² with a machine running, three to four — someone has to stay with the equipment while another person works the aisle. At 48 m² and above, five or more. Add one person if you have a speaker in the conference programme, because footfall spikes when sessions break and that is exactly when your presenter is walking people over.

Someone from our team is speaking in the conference. Does that change anything?

It changes the timing rather than the build. The conference tracks run inside the same hall across both days, so your presenter is sending people to the stand minutes after they finish rather than an hour later. We schedule the build so the stand is finished and staffed before the first session block on day one.

Can I reuse the stand at the next edition?

Yes, if it is built on a system frame. We store the structure in Frankfurt between editions and refresh the graphics. Because the show is annual and in the same city, the reuse case here is stronger than at almost any other show we build — there is no long-haul freight either way and no year-long storage gap to justify.

Can you handle a rush build?

Usually, for the structure. What cannot be rushed is the venue services order and, if cells are involved, the declarations. Those have fixed deadlines that no builder can move. Given the compressed build-up on a two-day tenancy, this is the show to start earlier than you think you need to.

Can I visit during pre-build?

Yes, and we encourage it, particularly if equipment is involved. The workshop is on Hanauer Landstraße, about fifteen minutes from Frankfurt Airport and twenty from the exhibition grounds. You see the stand assembled, check the plinth and access route against your machine, and meet the crew who will install it.

What graphics files do you need?

Vector files for logos and certification marks, and high-resolution raster images at roughly 150 dpi at final print size. Because much of this audience is international and reading in a second language, send short factual technical copy rather than idiomatic marketing lines — it prints better and it reads faster from the aisle.

Do you build at other Frankfurt shows?

Yes — Formnext, Fi Europe, Eurobike, Chemspec and the Tech Show halls among others. Same workshop, same crew, same twenty-minute run. If you exhibit at more than one Frankfurt show in a year we plan them together and reuse the frame between them.

How do I start?

Send your stand size, your stand number and zone if you have them, and the equipment list including anything containing cells. You get a 3D design and a full itemised quote back.

Ready to Exhibit

Get Your E-Waste World Stand Design in 48 Hours

Free 3D rendering before contract. One all-inclusive quote with no hidden line items, a twenty-minute run to Hall 3 instead of long-haul freight — with the floor loading, access route and services orders settled before the design is drawn.

48hrFree 3D Design
€4,500+All-Inclusive
28 daysTo Show Floor
4.9Trustpilot4.9Google
WhatsApp us
WhatsApp us