Skip to content
HomeCustom Exhibition Stands › Over 200 m²
Custom · Over 200 m²

Over 200 m² Custom Exhibition Stands

Above two hundred square metres the commission is temporary architecture. These projects have a programme, a services plan, an engineering package and an approvals process, and they are managed as construction rather than as a stand build.

€60,000–€350,000 typical 10–14 weeks from signed design Designed from a blank plan Installed across Europe
See the designs
Over 200 m² custom exhibition stand built by SOL Germany
No hidden costs, no surprise extras
Free 3D concept with every quote
In-house Frankfurt workshop
Pre-assembly check before it ships
No extra labour or overtime billing
On-site support till handover
Dedicated project manager
A reusable system you own
Free consultation on size and layout
No hidden costs, no surprise extras
Free 3D concept with every quote
In-house Frankfurt workshop
Pre-assembly check before it ships
No extra labour or overtime billing
On-site support till handover
Dedicated project manager
A reusable system you own
Free consultation on size and layout
Designs

Designs we build at Over 200 m²

Open any design to see every angle and send it to us as an enquiry. Nothing here is a catalogue item — each is a completed project shown as a starting point, and a bespoke build is drawn from your brief, your products and your stand number rather than adapted from one of these.

Pricing

What a custom stand costs at Over 200 m²

Projects above two hundred square metres run roughly €60,000 to €350,000, and the upper end reflects genuinely architectural projects — multi-level, fully serviced, with demonstration arenas and a build-up measured in days rather than hours. A large single-level pavilion in clad construction sits near the lower end; a multi-level, fully serviced structure with a demonstration arena and bespoke joinery throughout sits at the top. The bracket is wide because the projects genuinely are.

At this scale we quote in packages rather than as a single figure — structure and engineering, joinery and finishes, graphics, lighting and AV integration, services, freight and logistics, installation crew and site management, each priced separately. It is the only way the trade-offs stay visible, and it is how the budget gets managed during design rather than defended after it.

A country pavilion is a related but distinct commission. Many co-exhibitors under one identity, with shared reception, briefing space and back-of-house, and a co-ordination burden that has more in common with running an event than building a stand. If that is what you are describing, tell us early, because the design process, the approvals and the timeline all differ from a single-brand build of the same area.

Everything in the scope panel is included. Excluded and substantial: floor rental, venue power and full distribution, organiser fees, rigging, crane and forklift access, extended crew and overtime, AV hire, staff, catering, waste and cleaning. For projects at this size we provide a separate budget schedule for the venue-side costs alongside our own quote, because they are large enough that a surprise is not recoverable.

Planning the space

Designing at Over 200 m²

This is a construction project

Above two hundred square metres the work is managed as construction: an engineering package, a services plan, a programme with dependencies, and a site presence throughout build-up. Calling it a stand build understates what has to be co-ordinated.

The programme matters as much as the plan

A stand this size succeeds or fails on how it is run — session times, staffing rotas, appointment scheduling, hospitality service. The exhibitors who get the most from this scale arrive with a run sheet as detailed as the floorplan.

Ten to fourteen weeks

From signed design, and that assumes approvals move at a normal pace. Country pavilions and multi-level structures sit at the long end. This is a size to commission the season before, not the quarter before.

How we work

From brief to handover

STEP 1
Brief — SOL Germany process step 1

Brief

Send the show, hall, stand number and open sides. We confirm height limits and rigging rules before anything is drawn.

STEP 2
3D design — SOL Germany process step 2

3D design

A 3D concept within 48 hours, worked to your products and brand rather than dropped onto a template.

STEP 3
Quotation — SOL Germany process step 3

Quotation

An itemised quote against the approved design — structure, graphics, lighting, furniture, transport and crew, priced separately.

STEP 4
Production — SOL Germany process step 4

Production

Built and test-assembled in our Frankfurt workshop, so faults surface on our floor and not in the hall.

STEP 5
Delivery & installation — SOL Germany process step 5

Delivery & installation

We ship, build inside the organiser’s window with a project manager present, and dismantle afterwards.

Questions

Custom stands at Over 200 m² — common questions

How much does a custom stand over 200 m² cost?

Roughly €60,000–€350,000, about €300–€1000 per square metre. The bracket is wide because the projects are: a large single-level clad pavilion sits near the bottom, a multi-level fully serviced structure with a demonstration arena at the top. We quote in packages rather than as one figure so the trade-offs stay visible.

How is a project this size managed?

As construction. An engineering package, a services plan, a programme with dependencies and a site presence throughout build-up. There is a project manager on the floor from first delivery to handover, and a schedule that other trades and the venue are working to as well.

How long does it take?

Ten to fourteen weeks from signed design, assuming approvals move normally. Multi-level structures and country pavilions sit at the long end. This is a commission to place a season ahead rather than a quarter ahead.

Is a country pavilion the same thing?

Related but distinct. Many co-exhibitors under one identity with shared reception, briefing space and back-of-house — the co-ordination is closer to running an event than building a stand. Tell us early if that is the brief, because the design process, approvals and timeline all differ from a single-brand build of the same area.

Why quote in packages rather than one number?

Because a single figure hides where the money is and makes every budget conversation a negotiation about the total. Structure, joinery, graphics, lighting and AV, services, freight, crew and site management priced separately means the budget is managed during design instead of defended afterwards.

What are the biggest risks at this scale?

Approvals slipping and late artwork, in that order. Both are outside the workshop and neither can be recovered by working faster. We front-load the approvals conversation with the organiser and set artwork deadlines earlier than exhibitors expect, which is not caution — the schedule has nowhere to absorb a delay.

Can any of it be reused?

Freestanding joinery, counters, some rigged elements and occasionally a deck if the next hall’s loading rules match. Facades and engineered structures are built for one floorplan and one hall. We are explicit about this at quotation, because at this budget the reuse question deserves a straight answer rather than an optimistic one.

What is not included?

Floor rental, venue power and full distribution, organiser fees, rigging, crane and forklift access, extended crew and overtime, AV hire, staff, catering, waste and cleaning. For projects this size we supply a separate budget schedule for the venue-side costs alongside our quote — they are large enough that a surprise is not recoverable.

Tell us the show and the stand number

We will come back with a 3D concept for your Over 200 m² space and an itemised quote, usually within 48 hours.

WhatsApp us
WhatsApp us