Skip to content
HomeCustom Exhibition Stands › 100–120 m²
Custom · 100–120 m²

100–120 m² Custom Exhibition Stands

Past a hundred square metres a stand behaves like a small building. It has a facade, an interior that is not visible from outside, services running through it, and an approvals process to match. The design questions become architectural ones.

€30,000–€120,000 typical 6–9 weeks from signed design Designed from a blank plan Installed across Europe
See the designs
100–120 m² custom exhibition stand built by SOL Germany
No hidden costs, no surprise extras
Free 3D concept with every quote
In-house Frankfurt workshop
Pre-assembly check before it ships
No extra labour or overtime billing
On-site support till handover
Dedicated project manager
A reusable system you own
Free consultation on size and layout
No hidden costs, no surprise extras
Free 3D concept with every quote
In-house Frankfurt workshop
Pre-assembly check before it ships
No extra labour or overtime billing
On-site support till handover
Dedicated project manager
A reusable system you own
Free consultation on size and layout
Designs

Designs we build at 100–120 m²

Open any design to see every angle and send it to us as an enquiry. Nothing here is a catalogue item — each is a completed project shown as a starting point, and a bespoke build is drawn from your brief, your products and your stand number rather than adapted from one of these.

Pricing

What a custom stand costs at 100–120 m²

A bespoke build at a hundred to a hundred and twenty square metres runs roughly €30,000 to €120,000, and at this scale the bracket is driven by construction depth — how much is genuinely built rather than clad — more than by any other single factor. A clad structure over a system frame sits near the bottom of that bracket; a genuinely built stand in solid materials with a deck and an atrium sits near the top.

The distinction between built and clad is the honest one to make at this scale. Both can look identical in a render. One is a structure fabricated in joinery and steel; the other is a system frame with a bespoke skin over it. The second costs substantially less, installs faster and is the right answer more often than exhibitors expect — but it does not survive close inspection in the way the first does, and if visitors will be touching surfaces or standing under them, that matters.

Services planning is the part that quietly determines whether the build-up goes well. Power distribution, data, lighting circuits and hospitality water have to be routed through the structure at drawing stage. Discovering on the show floor that a cable has to cross a finished joinery wall is the sort of problem that costs a day, and days are not available at this scale.

Design, engineering, fabrication, graphics, lighting, Frankfurt pre-assembly, venue paperwork, freight, installation and dismantling are inside the bracket. Outside it: floor rental — which at this footprint is itself a five-figure line at a major German show — venue power, organiser fees, rigging charges, crane access, AV hire, staff, catering and cleaning.

Planning the space

Designing at 100–120 m²

It has a facade now

Above a hundred square metres visitors see an exterior before they see a stand. What faces the main aisle is a composed elevation rather than the outside of whatever is inside, and treating it as such is most of the difference between a large stand and a big one.

Services run through it

Power distribution, data, lighting circuits, water for hospitality and air movement all have to be planned into the structure rather than added to it. Retrofitting a cable route through built joinery on the show floor is the kind of problem that costs a build-up day.

Six to nine weeks, approvals-led

From signed design. At this size the venue approvals process is frequently the critical path rather than fabrication, particularly where a deck or suspended structure is involved.

How we work

From brief to handover

STEP 1
Brief — SOL Germany process step 1

Brief

Send the show, hall, stand number and open sides. We confirm height limits and rigging rules before anything is drawn.

STEP 2
3D design — SOL Germany process step 2

3D design

A 3D concept within 48 hours, worked to your products and brand rather than dropped onto a template.

STEP 3
Quotation — SOL Germany process step 3

Quotation

An itemised quote against the approved design — structure, graphics, lighting, furniture, transport and crew, priced separately.

STEP 4
Production — SOL Germany process step 4

Production

Built and test-assembled in our Frankfurt workshop, so faults surface on our floor and not in the hall.

STEP 5
Delivery & installation — SOL Germany process step 5

Delivery & installation

We ship, build inside the organiser’s window with a project manager present, and dismantle afterwards.

Questions

Custom stands at 100–120 m² — common questions

How much does a custom stand between 100 and 120 m² cost?

Roughly €30,000–€120,000, about €300–€1000 per square metre. What sets the position inside that bracket is construction depth: a system frame with a bespoke skin against a genuinely built structure in joinery and steel is most of the difference between the two ends.

Built or clad — which do I need?

Clad more often than exhibitors expect. It costs substantially less, installs faster, and in a render the two are indistinguishable. Built matters where visitors will touch surfaces, stand under them, or spend time close enough to read the detail. We will tell you which your brief actually needs.

What is different about a stand this size?

It has a facade and an interior. Visitors see an exterior elevation before they see a stand, and much of the floor is not visible from outside. That changes the design problem from arranging elements to composing a building, including how people are drawn from the aisle into a space they cannot fully see.

Why do services matter so much here?

Because they cannot be added later. Power distribution, data, lighting circuits and hospitality water have to be routed through the structure at drawing stage. Finding on the show floor that a cable must cross a finished joinery wall costs a build-up day, and at this size there is no spare day.

How long is the lead time?

Six to nine weeks from signed design, and venue approvals are frequently the critical path rather than fabrication — particularly with a deck or suspended structure. We start the approvals conversation with the organiser as soon as the concept is agreed rather than when it is finished.

Should I be considering a double-decker?

It is a fair question at this footprint. A second storey adds around sixty per cent more usable area on the same rented floor. Whether that beats a larger single level depends on the floor rental at your show against the engineering and build-up cost of the deck, and we will run that comparison rather than assume.

Can it be reused?

Partially, and less than at smaller sizes. Freestanding joinery, counters and rigged elements travel; a facade and a room plan built to one floorplan do not. At this scale the stand should be understood as a single deliberate appearance, and we say so at quotation rather than afterwards.

What is not included?

Floor space rental — itself a five-figure line at a major German show for this footprint — plus venue power, organiser fees, rigging charges, crane access, AV hire, staff, catering and daily cleaning.

Tell us the show and the stand number

We will come back with a 3D concept for your 100–120 m² space and an itemised quote, usually within 48 hours.

WhatsApp us
WhatsApp us