Skip to content
CIRSE 2027
SOL Germany · Milan

CIRSE Stand Builder in Milan, Italy

Stands for the CIRSE annual congress in Milan, 25–29 September 2027 — built and pre-assembled in our Frankfurt workshop, then driven south across the Alps by our own crew. CIRSE moves city every year, so we quote the structure once and the freight per edition.

€4,500+From
500+Stands
15 YrsEurope
4.9★Trustpilot4.9★Google
Browse Designs
SOL Germany exhibition stand for an interventional radiology exhibitor at a European medical congress
25–29 SEP 2027
Milan, Italy
25–29 September 2027Congress Dates
Milan, ItalyVenue
Annual, rotating cityCycle
7,000+Participants
CIRSEOrganiser
400+Lectures
Event Overview

CIRSE 2027 — Everything You Need to Know

CIRSE is the annual congress of the Cardiovascular and Interventional Radiological Society of Europe, and the society describes its technical exhibition as the largest interventional radiology exhibition anywhere. It has no permanent home: the congress has moved between European host cities for over forty years, which makes the delivery plan the part of the quote that changes edition to edition.

CIRSE 2027 — At a Glance

Dates
25–29 September 2027, Saturday to Wednesday
Venue
Milan, Italy, as announced on the CIRSE congress website
Getting there
Milan is served by Malpensa and Linate airports and by high-speed rail into Milano Centrale, with the city metro for onward travel
Cycle
Annual, held in September, with the host city rotating between European cities
Recent hosts
Copenhagen 2026, Barcelona 2025, Lisbon 2024, Copenhagen 2023 — Copenhagen also hosted in 2017 and 2008
Participants
The society reports more than 7,000 onsite and online participants
Programme
Over 400 lectures, plus hands-on device training, a simulation programme, the IDEAS aortic programme and a dedicated radiation protection pavilion
Organiser
The society itself — CIRSE, based in Vienna — rather than an exhibition company

Why Interventional Radiology Exhibitors Choose SOL Germany for CIRSE

CIRSE is a congress, not a trade fair, and the difference shows up in every design decision. Delegates are practising interventional radiologists working through a dense session programme. The exhibition is not busy all day — it empties during lectures and fills in a rush at the coffee and lunch breaks. A stand that works here handles a twenty-five minute surge and then goes quiet, which argues for more standing conversation positions, a demonstration that can restart every few minutes, and fewer seats than a trade-fair layout of the same size would carry.

The second thing that shapes a CIRSE build is that the congress moves. Milan in 2027, Copenhagen in 2026, Barcelona the year before. The structure we build for you does not change with the city; the road distance from our Frankfurt workshop very much does, and it is the single line in the quote that is genuinely edition-dependent. We set it out separately rather than folding it into a headline figure, so that when the host city is announced for the following year you can see immediately what moves and what does not.

The third is the product itself. An IR exhibition floor is unusual in that it runs at two extremes at once: catheters, guidewires, stents, embolic agents and closure devices that are physically tiny, sterile-packed and high in value, alongside imaging systems that are among the heaviest objects on any medical congress floor. Those two need opposite things from a stand — secure, well-lit, close-focus display for one; engineered floor loading, power and an access route for the other. Most exhibitors need some of both, and getting the balance right at design stage is most of the job.

What you sign is one quote, with the freight line shown separately and named. There is no second invoice after the congress closes.

From Our Project Managers

What We've Learned Building at Rotating Medical Congresses

Practical notes from the SOL Germany team — the things the exhibitor manual does not tell you.

CD

The Host City Changes the Delivery, Not the Stand

This is the CIRSE-specific one. From our workshop, Milan is roughly 700 kilometres by the direct motorway route through Basel and the Gotthard — one long driving day, inside a single driver's regulated hours with the mandatory break, but with an Alpine crossing and a non-EU country on the way. Barcelona is around 1,300 kilometres and realistically two driving days each way. Lisbon, which has hosted four times in the last fifteen years, is closer to 2,500 kilometres and three days each way, so the same physical stand occupies six days of truck time on the round trip rather than two. None of that changes the structure you are buying. All of it changes the delivery line, which is why we quote it separately.

Italy Is in the Euro, but the Direct Route Leaves the EU

There is no duty on a stand driven from Frankfurt to Milan — Italy is inside the single market and inside the euro, so venue and organiser services arrive in the same currency as our quote. What does differ is the road. The direct route runs through Switzerland, which is outside the EU customs union: the truck travels under a transit declaration, pays the Swiss heavy-vehicle charge, and has to respect the Swiss night-time and Sunday driving bans for heavy goods vehicles. The alternative through Austria and the Brenner stays inside the EU but adds distance. We choose per load and name the route in the freight line.

The Congress Opens on a Saturday

CIRSE 2027 runs Saturday to Wednesday. That pushes build-up into the preceding Thursday and Friday and puts the crew in Milan across a weekend, in one of the more expensive accommodation markets in Italy. It also means the final day is a Wednesday, which is typically quiet, and dismantling cannot start early just because the aisles have emptied. We plan the crew rotation and the accommodation around that shape from the outset rather than discovering it when hotel rates are quoted.

Hands-On Stations Need Working Height, Not Display Height

Hands-on device training and simulation are a formal part of the CIRSE programme, and many exhibitors run their own phantom or simulator station on the stand. A station like that is a workbench, not a plinth: it wants a genuine working height, task lighting from above rather than ambient wash, room for two people either side and a third watching over a shoulder, and a cable route that does not cross the floor where people stand. Designed as display furniture it looks correct and functions badly.

Your Most Valuable Product Is the Smallest Object on the Stand

A single-use device in a sterile pouch is easy to pick up and easy to lose, and on an open congress floor that matters. Lockable close-focus vitrines, a defined position for sample stock, and lighting aimed at the product rather than at the wall behind it do more for a device brand here than an extra square metre of graphics. We ask for the sample list at briefing stage, because the number of items and their real dimensions determine the cabinet layout, and cabinets are not something to resolve on site.

Compliance Sets the Hospitality Ceiling Before the Design Starts

Medtech exhibitors at European clinical congresses work under the MedTech Europe code, which constrains what a company may offer healthcare professionals on and around a stand. In stand terms the practical consequence is narrow but firm: a professional meeting space is fine, an entertainment-led hospitality area is not. Tell us where your compliance team draws the line before we draw the plan, because retrofitting a stand from a lounge concept to a meeting concept wastes a design round.

Client Testimonials

What our clients say

Warm and welcoming booth design

Creative stand design, flawless execution

A booth that elevates brand presence at CPHI Worldwide

Transparent Pricing

What a CIRSE Stand Actually Costs

Two figures make up a CIRSE quote: the stand, which is priced the way it would be at any European build, and the delivery, which depends on where the congress is that year. We keep them visibly separate so you can carry the first one forward when the host city changes.

Essential — 9–18 m²

From €4,500
Best for: single-product device companies, distributors, software and imaging-analysis vendors attending CIRSE for the first time
  • Modular aluminium system frame
  • Backlit fabric back wall, full height
  • One branded reception counter
  • Standard LED top-rail lighting
  • One lockable close-focus display vitrine
  • Graphics design and print (two revision rounds)
  • Road freight from Frankfurt, quoted per host city
  • Installation, dismantling and organiser paperwork

Not included: floor space rental, venue electrical orders, enclosed meeting room, hands-on station.

Premium — 50–100+ m²

From €34,000
Best for: imaging OEMs, full-range interventional portfolios, exhibitors treating CIRSE as their principal European congress
  • Architectural custom build, optional double-decker
  • Multiple enclosed meeting rooms
  • Engineered floor loading for imaging equipment
  • Several independently serviced demonstration positions
  • Hanging sign where the venue permits
  • Full AV package and demonstration stations
  • Technical back-of-house and storage
  • Priority workshop build slot

Not included: floor space rental, rigging fees, AV hire beyond the package, catering.

Recent Builds

Stands We Have Built

Stands delivered across European medical congresses and technical trade fairs, including builds outside Germany where the whole structure travels by road.

A Guide to CIRSE for First-Time Exhibitors

CIRSE is the annual congress of the Cardiovascular and Interventional Radiological Society of Europe. The 2027 edition runs from 25 to 29 September in Milan, Italy, and the organiser is the society itself rather than an exhibition company — which is worth knowing, because a society-run congress treats the exhibition as part of an educational event rather than as the main product.

The scale is substantial: the society reports more than 7,000 onsite and online participants and over 400 lectures, alongside hands-on device training, a simulation programme, the IDEAS aortic programme and a radiation protection pavilion. The technical exhibition is described by CIRSE as the largest interventional radiology exhibition in the world.

Where Is CIRSE Held? The Rotation, and Why It Matters to Your Budget

CIRSE has no permanent venue. Reading the society's own record of past congresses, the last fifteen years have effectively cycled between three cities — Barcelona in 2025, 2022, 2019, 2016 and 2013; Lisbon in 2024, 2018, 2015 and 2012; Copenhagen in 2026, 2023 and 2017 — with Glasgow in 2014 and Munich in 2011 as the exceptions, and 2027 steps outside the pattern again with Milan. Before that the congress ranged much more widely, from Vienna and Berlin in the 1980s through Prague, Maastricht, Gothenburg, Antalya and Athens.

For an exhibitor commissioning a stand in Europe, that rotation is the whole planning problem. The stand you buy is the same object wherever the congress lands. What changes is how far it travels, how many driving days that takes, whether a border or a currency comes into it, and what your crew's accommodation costs in that city that week. A quote you accepted for last year's congress does not transfer intact to this year's, and any builder who tells you it does is quietly averaging.

Our approach is to price the structure once and the delivery per edition. Milan, the 2027 host, is a similar road distance from our Frankfurt workshop to Copenhagen, the shortest of the three regular hosts, although the direct route crosses Switzerland; Lisbon is by a wide margin the longest. Once CIRSE announces the following year's host, the delivery line is the only part of your quote that needs revisiting.

Who Exhibits at CIRSE and What Delegates Are Looking For

The exhibition is dominated by interventional device manufacturers — catheters, guidewires, stents and stent grafts, embolic agents, ablation systems, biopsy and drainage devices, vascular closure — together with imaging manufacturers, contrast media suppliers, radiation protection specialists and, increasingly, image-analysis and AI software vendors.

The delegate is a practising interventional radiologist or a trainee, and the questions are clinical rather than commercial. They will ask about trafficability, deliverability, sizing ranges, what the device does in a tortuous anatomy, and what the evidence base looks like. That is a different conversation from a trade fair, and it changes the stand: clinical clarity beats brand volume, a physician wants to handle the device rather than watch a video about it, and the person standing on your stand needs to be someone who can answer a procedural question.

Stand Size: Choosing Between 9, 18, 24 and 48 Square Metres

Nine square metres works for a single-product device company, a distributor covering a region, or a software vendor whose product is a screen. You get a counter, a back wall, one or two vitrines and standing conversations. What you cannot do at this size is run a hands-on station with anyone watching.

Eighteen square metres is the practical minimum for a portfolio rather than a product, and it is the largest size we would attempt without dedicated demonstration space.

Twenty-four square metres is the threshold at which a phantom or simulator station becomes workable: enough floor for a real workbench, room for two people either side and an observer, and circulation that does not force the queue into the aisle. If hands-on training is part of your plan at CIRSE, treat 24 m² as the working minimum.

At 48 m² you can run a hands-on station and still hold a scheduled clinical meeting in a semi-private space at the same time, which is what most mid-size device companies actually need here. From 80 m² upward, a double-decker adds meeting capacity without eating the ground floor — and on a congress floor where the surges are short and intense, ground-floor circulation is worth protecting.

What a CIRSE Stand Costs by Size

The ranges below are for design, fabrication, graphics, installation and dismantling, and they hold wherever the congress is. They exclude the floor space rental you pay to CIRSE, the electrical and rigging orders placed with the venue, and the road freight, which we quote against the announced host city rather than averaging across the rotation.

  • 9 m² modular: €4,100–€8,700
  • 18 m² modular: €4,800–€10,100
  • 24 m² custom with a hands-on station: €11,500–€15,000
  • 30 m² custom with enclosed meeting room: €15,000–€19,000
  • 48 m² custom, hands-on station plus meeting space: €19,000–€26,000
  • 80 m² premium or double-decker: €34,000–€48,000

Common Mistakes, in Order of Frequency

The most common is designing for steady traffic. The congress floor is empty during sessions and overwhelmed at the breaks, and a layout built for a constant trickle jams at exactly the moment it matters. The second is building the hands-on station as display furniture, at display height, lit from the ceiling — it photographs well and nobody can work at it. The third is treating last year's quote as this year's, when the host city has moved 1,500 kilometres. The fourth is leaving sample security to chance on an open floor where the highest-value item on the stand fits in a pocket. The fifth is designing a hospitality area that the compliance team then has to dismantle. All five are settled at design stage or not at all.

Getting Started

Send your stand size, your stand number if CIRSE has issued it, and three things about the product: the sample list with real dimensions, whether you intend to run a hands-on or simulator station, and whether any imaging equipment is coming and at what crated weight. Those three answers determine the design more than any styling preference. You get a 3D design and an itemised all-in quote, at no charge and with no obligation.

Because CIRSE moves host city every year, a reusable system frame is a more sensible purchase here than at a show with a fixed home — the structure comes back to our Frankfurt warehouse after each edition, and the next congress costs a graphics refresh and a new freight leg rather than a rebuild. Our modular exhibition stands are built for exactly that pattern.

FAQ

CIRSE 2027 — Frequently Asked Questions

Real answers with real numbers. Click any question to expand.

Where is CIRSE held? Does it move every year?

It moves. CIRSE has no permanent venue and the host city rotates. CIRSE 2027 is in Milan, Italy, from 25 to 29 September. The society's own record of past congresses shows Copenhagen in 2026, Barcelona in 2025 and Lisbon in 2024, with the same three cities recurring through the last fifteen years and Glasgow and Munich as exceptions. Be careful with third-party event listings on this show — we have seen more than one give the wrong host city for 2027. The congress website is the only source worth trusting.

When and where is CIRSE 2027?

25 to 29 September 2027, Saturday to Wednesday, in Milan, Italy, as announced on the congress website. Milan is served by Malpensa and Linate airports and by high-speed rail into Milano Centrale; the congress website is the place to check the venue and its transport links.

How much does a CIRSE stand cost?

From €4,500 to roughly €48,000 depending on size. A modular 18 m² sits in the €4,800–€10,100 range. A 24 m² custom stand with a hands-on station is typically €11,500–€15,000. A 48 m² with a hands-on station and meeting space runs €19,000–€26,000. Premium and double-decker builds from 80 m² start around €34,000. Road freight is quoted separately against the host city.

Why is freight quoted separately rather than included?

Because it is the one line that genuinely changes when the congress moves. From our Frankfurt workshop, Milan is roughly 700 kilometres and one driving day, through Switzerland; Barcelona is around 1,300 and two; Lisbon is closer to 2,500 and three. Folding that into a single headline figure would mean averaging, which overcharges you in a Milan year and undercharges us in a Lisbon one. We would rather you could see it.

What is not included in the price?

Three things. The floor space rental, which is between you and CIRSE. The electrical, rigging and waste orders placed with the venue. And specialty add-ons — AV beyond the listed package, furniture beyond the standard set, catering, and staffing during the congress.

Is there customs to pay on a stand going to Milan?

No duty. Italy is in the single market and in Schengen, so nothing is declared at the Italian end. The direct route does cross Switzerland, which is outside the EU customs union, so the truck travels under a transit declaration, or we take the longer Brenner route through Austria and stay inside the EU. Note that this is a property of the host city, not of the congress — a CIRSE edition outside the EU customs union would need an ATA carnet, which is a different exercise and a longer lead time.

Italy uses the euro. Does that simplify my quote?

Yes. Our quote is in euros, and so is the venue and organiser side — electrical orders, rigging, cleaning — so your finance team sees one currency on the whole project. The one line the route touches is freight: the direct road through Switzerland carries the Swiss heavy-vehicle charge, and we state which route we have priced.

Can you build a hands-on or simulator station on the stand?

Yes, and at CIRSE it is a common request. The thing to get right is that it is a workbench rather than a plinth: true working height, task lighting from above, room for two people either side plus an observer, a cable route away from where people stand, and a wipe-clean surface. Tell us at briefing stage, because a hands-on station changes the floor plan rather than being added to it.

How do you handle security for small, high-value devices?

Lockable close-focus vitrines, a defined and lockable position for sample stock behind the back wall, and lighting aimed at the product rather than the wall. Send the sample list with real dimensions at briefing stage — the number and size of items determines the cabinet layout, and cabinets cannot be reworked on site.

Does the MedTech Europe code affect the stand design?

In one narrow but firm way. A professional meeting space is fine; an entertainment-led hospitality area is not. We are not your compliance advisers and will not pretend to be, but it saves a design round if you tell us where your compliance team draws the line before we draw the plan.

The congress opens on a Saturday. Does that change anything?

It changes crew logistics and cost. Build-up falls on the preceding Thursday and Friday, which puts the team in Milan over a weekend in an expensive accommodation market, and the closing Wednesday tends to be quiet without dismantling being allowed to start early. We plan the rotation around that shape rather than discovering it at booking time.

How long does installation take?

A modular 9–18 m² stand goes up in one shift. A 24–48 m² custom stand with a hands-on station takes one to two days. Premium builds use the full window. Every stand is pre-assembled and inspected at our workshop first, which matters more than usual when the build is on the far side of the Alps from the tools that made it.

When do I need to lock the design?

For a late-September congress, the first half of July is comfortable, and earlier if imaging equipment or a hands-on station is involved. Note the honest limit: at six weeks out we can still deliver a modular build to Milan, but a full custom build is no longer realistic, and some venue ordering deadlines will already have passed. If you are reading this close to the congress, tell us and we will say plainly which of the two you are choosing between.

Can I reuse the stand at next year's CIRSE?

Yes, if it is built on a system frame, and the rotation is a good argument for doing exactly that. The structure returns to our warehouse in Frankfurt after the congress, and the following edition costs a graphics refresh plus a freight leg to wherever CIRSE has gone. Given the congress has moved between the same handful of cities for years, that pattern tends to pay back quickly.

Do you know where CIRSE 2028 will be?

Not from a source we would repeat. The host city for the next edition is announced by CIRSE and we would rather tell you nothing than tell you a guess dressed as a fact — this is a show where third-party listings get the city wrong. Check the congress website, or send us your plan and we will price it as soon as the host is published.

Do you handle the organiser paperwork?

Yes — electrical orders, rigging permissions, waste removal, cleaning and crew passes. We file on the day a contract is signed. Deadlines at congresses are often earlier relative to the event than at trade fairs, and they are not recoverable once missed.

Can I visit during pre-build?

Yes, and for a congress build we recommend it. The workshop is about fifteen minutes from Frankfurt Airport. You see the stand assembled, check the vitrines against your actual samples and the hands-on station against your actual working height, and meet the crew who will be in Milan.

What graphics files do you need?

Vector files for logos, product marks and regulatory symbols, and high-resolution raster images at roughly 150 dpi at final print size. Clinical imagery needs to arrive with its usage rights already cleared — that is one we cannot resolve for you.

How many staff should I plan for?

On 18 m², two to three. On 24 m² with a hands-on station, four — someone has to stay with the station while the others work the aisle. At 48 m² and above, five or more. Remember the break-time surge: staffing for the average across the day leaves you short at precisely the twenty-five minutes that produce the leads.

Do you build at other European medical congresses?

Yes, across the clinical congress calendar as well as at pharmaceutical and packaging shows. Several of those congresses rotate host cities in the same way CIRSE does, which is why the split between structure cost and delivery cost is how we quote as a matter of routine rather than as a special case.

How do I start?

Send your stand size, your stand number if you have it, the sample list, and whether a hands-on station or imaging equipment is part of the plan. You get a 3D design and a full itemised quote back.

Ready to Exhibit

Get Your CIRSE Stand Design in 48 Hours

Free 3D rendering before contract. One itemised all-in quote with the freight line named rather than hidden — so that when the congress moves next year, you can see exactly which number changes.

48hrFree 3D Design
€4,500+All-Inclusive
28 daysTo Show Floor
4.9★Trustpilot4.9★Google
WhatsApp us
WhatsApp us
Live now