Zephyr Project at Embedded World 2026

A 66 m² stand in Nuremberg with a row of partner demo counters, a meeting room and a lit cube hanging above it all.

View Our Work
Zephyr Project exhibition stand at Embedded World 2026 in Nuremberg with the hanging cube and visitors
Zephyr Project
Client
Embedded World 2026
Event
Exhibition Centre Nuremberg
Venue
66 m²
Stand size
Hall 4 · 4-170
Location
4 days
Build-up
The Brief

Custom Counters, All of Them Lockable

What the Zephyr Project asked for

The Zephyr Project's stand at Embedded World carries a row of demo counters, each branded for a different partner. So the brief asked for custom-built counters, every one lockable, plus a meeting room with two extra chairs, two plants at reception and no brochure stand.

What we brought to it

We gave the partners one stage: a row of matching counters, each with its own branding and a demo screen, on a single purple carpet that marks the whole plot. Above them hangs the one thing everyone can see from the aisle.

The project was confirmed on 20 November 2025, specified on 1 December and built from 6 to 9 March.

Partner demo counters on the Zephyr Project stand with visitors during Embedded World 2026
The counter row during the show.
The Showstopper

The Lit Cube

One shape, hung high, so the project is found before the partners are.

The Zephyr Project is shared by many partners, so the stand needed one mark above all of them: a cube hung over the counters, lit from inside, with the logo on each face.

How it would be lit stayed open after the specification meeting, with the client still to decide whether the cube would glow on every side. It does, so it reads the same from every aisle.

During the show the stand kept working around it: more water and more sockets on request, the pantry door repaired on the spot, and one extra logo fitted.

The lit Zephyr Project cube hanging over the stand at Embedded World 2026
The cube over the stand.
The Stand

One Cube, Many Partners

The cube marked the stand from far off. Underneath, each partner had its own counter and screen.

Zephyr Project stand at Embedded World 2026 with a partner counter and the hanging cube 1234
  1. Hanging cube. Lit from inside, with the logo on each face.
  2. Partner counter. Custom-built and lockable, branded for the partner showing on it.
  3. Purple carpet. One colour marks the whole plot.
  4. Demo screens. A screen at each partner position.
The Payoff

Signed Off With Five Stars

The Zephyr Project signed the handover form and rated the stand five stars. Embedded World ran from 10 to 12 March. Our review on 24 April was frank about what to improve: the fit of some printed graphics, and booking audio-visual support only for the days it is needed.