Skip to content
Case Study · Embedded World 2026

RISC-V at Embedded World 2026

A 100 m² stand in Nuremberg with a presentation area, partner kiosks and a hanging rig in blue and yellow.

View Our Work
RISC-V exhibition stand at Embedded World 2026 in Nuremberg with the hanging rig and visitors
RISC-V
Client
Embedded World 2026
Event
Exhibition Centre Nuremberg
Venue
100 m²
Stand size
Hall 5 · 5-119
Location
4 days
Build-up
The Brief

A Stage, a Screen and a Row of Kiosks

What RISC-V asked for

RISC-V came to Embedded World to present, not only to exhibit. The stand needed a podium with a microphone and long HDMI runs, a 75-inch screen on the wall, a backlit counter in the middle, and partner kiosks with power sockets in every one. The cabinets had to lock.

What we brought to it

We split the stand into a stage and a street: the presentation area on one side, the partner kiosks on the other, each with a lit strip, in RISC-V blue and yellow. One early change came from the client: swap the two carpet colours.

The project was confirmed on 19 November 2025 and specified on 1 December. Artwork was due on 15 December and build-up ran from 6 to 9 March.

Presentation area on the RISC-V stand with a wall screen, podium and seating cubes
The presentation area: screen, podium, seating.
The Showstopper

The Rig Over the Stage

Hang it high, then light it right.

The landmark of the stand is its hanging rig: a frame in blue, white and yellow over the presentation area and the kiosks, the first thing visitors see from the aisle.

During installation it became clear that the lights specified for the rig were too few for the stand below. More lighting was added on site, and by the evening of 9 March the rig and the kiosks under it were lit as intended.

The client arrived on opening morning to a stand already checked, with every open point found and a plan for each. That is what the handover form talks about.

Hanging rig above the RISC-V stand in blue, white and yellow
The rig over the stand, 9 March.

The Last Evening of Build-up

RISC-V stand during build-up at Embedded World 2026
9 Mar
The stand on the final evening of build-up
Partner logo wall on the aisle side of the RISC-V stand
9 Mar
Partner logos on the aisle side
Partner kiosks lit along the blue wall of the RISC-V stand
9 Mar
Kiosks lit along the blue wall
The Stand

Kiosks Under the Rig

The rig marked the stand from far off. Below it, the stage drew a crowd and the kiosks gave every partner a place.

Partner kiosks on the RISC-V stand at Embedded World 2026 12345
  1. Partner kiosk. A screen above a lockable cabinet, with power sockets inside.
  2. Light strips. A lit strip down the side of each kiosk.
  3. Two-colour carpet. Blue and yellow, swapped from the first design at the client’s request.
  4. Backlit counter. The lit counter in the middle of the stand.
  5. Wall logos. Vinyl graphics on board, on the blue walls.
The Payoff

Signed Off With Five Stars

RISC-V took the stand over at 10 am on 10 March, the morning Embedded World opened, and rated it five stars. The show ran until 12 March. Our review on 24 April recorded a good finish and good audio-visual support.

Signed handover and feedback form from RISC-V for Embedded World 2026, rated five stars, with the comment that Kushy had identified the issues and had action plans in place
The form itself. Filled in by hand on the stand. Tap to read it.
Ready to Exhibit

Planning Your Next Show? Let's Make It Easy.

Design, build, transport, installation and on-site support, handled by one team. Send us your show, hall and plot size and you get a 3D design and an itemised quote back, at no charge.

WhatsApp us
WhatsApp us
Live now