Hetero at CPHI Milan 2026
378 m² of Hetero red in Milan, crowned by a canopy hung from the hall roof.
- Hetero
- Client
- CPHI Milan 2026
- Event
- Fiera Milano
- Venue
- 378 m²
- Stand size
- Hall 5P · A1
- Location
- 6 days
- Build-up
One Brand, One Colour, 378 m²
What Hetero asked for
Hetero came to CPHI in Milan with a big space and a long list. Its 378 m² in Hall 5 had to work like an office for three days: reception counters, a bar, meeting rooms behind frosted glass, a private room for the chairman, a pantry with storage and a lounge for longer conversations. All of it in Hetero’s own red.
What we brought to it
A stand this size can easily become a row of rooms. We wanted it to read as one brand from the aisle. So the red runs through everything: chairs, planters, fabric and a glow of light along the floor. The open lounge sits at the front with a live plant wall and trees, so the stand looks busy and welcoming, while the meeting rooms stay private behind frosted glass.
Then the voice. Three LED walls and a screen band let Hetero change its message through the day: its line “Inspiring Human Belief in a Healthier World”, its business areas from API to biosimilars, and its campaigns. The printed walls inside say it more warmly: “Delivering a zillion smiles, one dose at a time.”
Production ran in the workshop from mid-September, and the build in Milan from 30 September to 5 October. Catering got its own 18 kW supply, so a busy coffee machine could never dim the stand.
The Red Canopy
Look up. That was the whole idea.
Hall 5 is wide, high and busy. To be found in it, Hetero needed something above head height, where no other stand could block the view. So we hung it from the roof: a long LED screen band on the hall rig, waves of red fabric underneath, three lit Hetero logo rings and red truss lights washing over the fabric.
It began on a workshop table on 19 September, with the logo letters cut and boxed. Two days later the ribbon fabric was in work. Every logo was lit and checked before sign-off, and the clear acrylic backing stayed on to carry the letters. By 26 September the hanging logos were done.
The whole canopy went on the first truck, so it could be the first thing up in Milan. On 30 September the screen band came together and the three logos rose one by one, while the hall power stayed off for hours. The screen got its first test only after Fiera Milano switched it on that evening.
On 1 October the ribbons went in and were steamed smooth. The truss lights needed a few visits from the rigging crew before every one glowed red. On 3 October the canopy rose to its final height, and the stand had its crown.
From the Workshop to Hall 5

Logo letters cut and boxed in the workshop

Red fabric for the ribbons

Loading starts at the workshop

Screens lit while the floor is still a building site
Under the Canopy
The canopy named the stand from far down the hall. Underneath, the ribbons turned the open lounge into one red room, and on opening day it was full.
123456
- Curved LED wall. Wraps the front corner, so the campaign turns with the visitor. Built in four parts for a quick install.
- Screen band. Runs Hetero’s line and business areas above the aisle.
- Red ribbons. Layered fabric that turns the lounge below into one red room.
- Logo ring. One of three, lit from inside and seen from far down the hall.
- Reception counter. The logo is cut flush into the front, so it reads clean even up close.
- Curved planter. Shaped in the workshop to follow the LED wall, with a red glow along its base.



Handed Over on Opening Morning
Hetero took the stand over at 9 am on 6 October, the morning CPHI opened. The client rated the stand five out of five. The show ran until 8 October.
Planning Your Next Show? Let's Make It Easy.
Design, build, transport, installation and on-site support, handled by one team. Send us your show, hall and plot size and you get a 3D design and an itemised quote back, at no charge.