Skip to content
Case Study · CPHI Milan 2026

GEA at CPHI Milan 2026

A clean white and blue stand in Milan, framed by a square of light hung from the hall rig.

View Our Work
GEA stand at CPHI Milan 2026 on opening day, with the lit square rig band, the counter on the aisle and visitors on the stand
GEA
Client
CPHI Milan 2026
Event
Fiera Milano
Venue
Hall 9 · A66
Location
The Brief

Think Better, Build Better, Run Better

What the stand had to do

GEA came to CPHI in Milan as an engineering partner to pharma, with real equipment to show. The stand needed open floor around the machines, a big screen, a counter on the aisle and a store room tucked behind the graphics.

What we brought to it

GEA’s story is a journey in three steps, so the main wall tells it left to right: Think Better, Build Better, Run Better, in alternating blue and white panels. A tall blue tower closes it with the promise in plain words: enabling sustainable performance, for patients, for pharma, for the future.

Everything else stays quiet: white walls, a wood-fronted counter with a soft glow underneath, and plenty of floor, so the machines are the objects people walk up to.

The blue GEA tower reading Enabling Sustainable Performance during build-up
The tower panel going up, 2 October.
The Showstopper

A Square of Light Overhead

Before anything stood on the floor, the frame was already in the air.

The star of this stand is the frame above it: a square rig band in white and GEA blue, carrying the line “Engineering for a better world” on every side and lit from within, so the stand is framed from any aisle.

The fabric was ready in the workshop on 28 September. On 30 September the crew dressed the rig with it while it hung low, and by that evening the band was lit. On 2 October the walls went up beneath it, and by 3 October the square sat at full height over a stand that was nearly done.

The lit square GEA rig band over the stand on opening day in Hall 9
The square, lit, on opening day.

From Fabric to Frame

Blue and white printed fabric for the GEA rig band laid out in the workshop
28 Sep
The band fabric, ready in the workshop
Crew fitting the GEA band to the rig frame hanging low over the floor
30 Sep
Dressing the rig while it hangs low
The GEA rig band lit, hanging low over the empty stand floor
30 Sep
The band lit for the first time
Crew putting up the Think, Build, Run wall under the GEA rig
2 Oct
Walls going up beneath it
The Stand

Under the Square

The square marked the stand from far off. Underneath, the wall told the story and the floor left room for the machines.

The GEA stand at CPHI Milan 2026 on opening day with the rig band, screen wall, Think Build Run panels and blue tower 123456
  1. Rig band. “Engineering for a better world”, lit, on all four sides.
  2. Big screen. Set into a white wall, facing the open floor.
  3. Journey wall. Think Better, Build Better, Run Better, in blue and white panels.
  4. Blue tower. Enabling sustainable performance: for patients, for pharma, for the future.
  5. Counter. Wood front, white top, a soft light along the floor.
  6. Store room. Behind a door in the graphic wall.
GEA counter with lit base in front of the Think Better, Build Better, Run Better wall, visitors around it
The counter on the aisle, with the journey wall behind
The GEA screen wall with process equipment on the open floor in front of it and visitors around
The screen wall, with the machines in front
The Payoff

Very Happy, on Opening Morning

GEA took the stand over at 10:21 on 6 October, opening day of CPHI, marked five stars and kept the comment short.

Signed handover and feedback form from GEA for CPHI Milan 2026, rated five stars, saying very happy, thanks so much
The form itself. Filled in by hand on the stand. Tap to read it.
Ready to Exhibit

Planning Your Next Show? Let's Make It Easy.

Design, build, transport, installation and on-site support, handled by one team. Send us your show, hall and plot size and you get a 3D design and an itemised quote back, at no charge.

WhatsApp us
WhatsApp us
Live now