What Fresenius Kabi asked for
Fresenius Kabi came to CPHI in Milan to talk contract manufacturing. The 280 m² stand needed meeting rooms behind glass doors, a bar, a pantry, a store room with coat hooks along one wall, two round info counters, two touchscreen podiums and a hologram display. Above it all: an LED ring with a backlit circle beneath it.
What we brought to it
We kept the floor open and the colours few: white curves on a blue carpet, so the brand blue does the work. The meeting rooms sit at the back in wood laminate, warm and private. The front belongs to the visitor, with round counters, touchscreens and a hologram that invite people in without anyone having to pitch.
The messages stack by distance. From far away, the lit logo on its blue arch. Closer, the LED ring and the corner LED walls: “Trusted”, “Experienced”, “Dedicated”. At eye level, a white band runs round the stand with the promise in plain words: “Contract Manufacturing • Focused on Your Success”.
This was not our first CPHI with Fresenius Kabi: we built their stand in Milan in 2024 too. Every LED and hologram file was checked with our partner before anything shipped, and the build in Milan ran from 30 September to 5 October.
The Circle of Light
Look up from the lounge, and the ceiling glows.
The star of this stand hangs from the hall roof: a wide ring with a backlit circle inside it, so the lounge below sits under its own soft light. Around it, LED rings carry the messages and a blue arch lifts the lit Fresenius Kabi logo high enough to be seen across the hall.
It travelled in parts. In the workshop the frames were made and packed as a modular set; on 29 September the backlit logos for the rig were checked and packed too. The circle itself was only ever going to be whole once it was up.
On site the rig took patience. On 1 October the rigging technician did not arrive, and the structure came down by 500 mm on the rig. On 2 October the rigging crew came two hours late, so the team painted the round ceiling and stretched the backlit fabric in the meantime. On 3 October the ceiling lights lost power; an electrician had it sorted that night.
On 4 October one of the LED screens showed a pixelated video. We stayed with the LED team until it ran clean, and asked our partner to fix a logo that glowed too yellow. That night the furniture went in under the circle.
From Bare Rig to First Light

The ring hung low over a bare floor

Backlit fabric going into the circle

The circle lit for the first time

LED ring and LED walls going in
How It Played Out
The arch and ring brought people across the hall. The round counters and touchscreens met them at the front, and the lounge under the circle kept them talking.
123456
- Lit logo. Backlit 3D letters on the hanging structure, seen from far down the aisle.
- LED ring. A round screen on the rig, carrying the brand and its messages.
- Corner LED wall. Wraps the corner, so the words “Dedicated” and “Trusted” face both aisles.
- Info counter. Round and white, with the logo on its face, the first stop for visitors.
- Touchscreen podium. One of two, for visitors to explore on their own.
- Backlit graphic. One of the lit graphic boxes inside the stand.



Walked, Adjusted, Five Stars
The client walked the stand on 5 October and asked for two things: a cleaner edge on the LED ring and different meeting-room chairs. The chairs were swapped the same day. Their favourites were the hologram and the side LED walls. On 6 October, opening day, Fresenius Kabi signed the handover and rated the stand five out of five.
Planning Your Next Show? Let's Make It Easy.