Skip to content
Case Study · Chemspec Europe 2026

ASTEC at Chemspec Europe 2026

A 54 m² stand in Cologne for ASTEC LifeSciences, with a lounge, a meeting room and a pantry. Confirmed five weeks before opening and finished ahead of time.

View Our Work
ASTEC LifeSciences exhibition stand at Chemspec Europe 2026 in Cologne with the hanging banner
ASTEC
Client
Chemspec Europe 2026
Event
Koelnmesse
Venue
54 m²
Stand size
Hall 8
Location
3 days
Build-up
The Brief

Hospitality First, in Five Weeks

What ASTEC asked for

ASTEC came to Chemspec Europe to host. The brief read like a guest list: a meeting room with cushioned chairs, a two-seater sofa with a coffee table, a pantry stocked with 100 bottles of water and juice, a small fridge, and fish bowls and chocolates on the counters. The screens were to sit in casings.

What we brought to it

We gave the hosting room to breathe: a lounge at the front, a teal meeting room behind, a stocked pantry and a curved reception counter on the aisle, with a fabric ring carrying the company name overhead.

The order was confirmed on 30 March 2026, five weeks before the show. The structure was built and painted in the factory, and the build in Cologne took three days, from 3 to 5 May.

ASTEC stand at Chemspec Europe 2026 in the early morning before opening
The stand early on opening morning.
The Showstopper

The Slat Wall and Its 3D Logo

Warm timber, and a logo that stands out from it.

The centre of ASTEC’s stand is its logo wall: vertical timber slats with the ASTEC mark standing out in 3D foam above the lounge sofas, and the company’s three words below it: trust, transparency, agility.

With five weeks from order to opening, it had to be right first time. Artwork arrived on 1 April, the print files were ready on 21 April, and the wall was made and finished in the factory, so in Cologne it only had to go up.

By the morning of 5 May the wall stood lit over the lounge. By the afternoon the whole stand was finished, ahead of time.

Timber slat wall with the 3D ASTEC logo and lounge seating on the ASTEC stand
The 3D logo on timber slats, 5 May.

The Last Day and the First Morning

The finished ASTEC stand on the afternoon of the last build-up day
5 May
Finished by the afternoon, ahead of time
The ASTEC stand with its hanging banner early on opening morning
6 May
Opening morning, banner lit
The stocked pantry on the ASTEC stand on opening morning
6 May
The pantry, stocked for two days
The Stand

A Stand Built to Host

The fabric ring marked the stand across the hall. Below it, the lounge, the meeting room and the counter did the hosting.

ASTEC stand at Chemspec Europe 2026 seen from the front aisle 12345
  1. Hanging banner. A fabric ring carrying the company name above the stand.
  2. Screen in a casing. Set into a teal frame on the wall.
  3. Reception counter. Curved, with vinyl logos on the front.
  4. Slat wall. Timber slats with the logo in 3D foam.
  5. Backlit panels. Lit graphics at the corners of the stand.
ASTEC stand with visitors on the opening day of Chemspec Europe 2026
Opening day
Meeting room on the ASTEC stand with a table, chairs and a wall screen
The meeting room
ASTEC stand at Chemspec Europe 2026 seen from the corner aisle
From the corner aisle
The Payoff

Signed Off With Five Stars

ASTEC signed the handover form and rated the stand five stars. Chemspec Europe ran on 6 and 7 May. Our review on 12 May logged the build as error-free.

Ready to Exhibit

Planning Your Next Show? Let's Make It Easy.

Design, build, transport, installation and on-site support, handled by one team. Send us your show, hall and plot size and you get a 3D design and an itemised quote back, at no charge.

WhatsApp us
WhatsApp us
Live now