Skip to content
BIM World MUNICH 2026
SOL Germany · Munich

BIM World Stand Builder for the ICM, Munich

Stands for the ICM – International Congress Center Messe München, 24–25 November 2026, built in our Frankfurt workshop and installed by our own crew. Planned around the thing most first-time exhibitors miss: BIM World runs inside the congress centre, not in the exhibition halls, and the build rules there are not the same.

€4,500+From
500+Stands
15 YrsEurope
4.9Trustpilot4.9Google
Browse Designs
SOL Germany exhibition stand for a construction software exhibitor at the ICM in Munich
24–25 NOV 2026
ICM Munich, Germany
24–25 November 2026Show Dates
ICM MunichVenue
AnnualCycle
250+Exhibitors
RM Rudolf Müller EventsOrganiser
8,000+Visitors
Event Overview

BIM World MUNICH 2026 — Everything You Need to Know

BIM World MUNICH is where the German-speaking construction, real estate and facility management industries meet their software suppliers. The 2026 edition is the tenth. It is a congress with an exhibition attached rather than an exhibition with a conference bolted on, and that ordering changes how a stand should be designed.

BIM World MUNICH 2026 — At a Glance

Dates
24–25 November 2026, Tuesday and Wednesday, 09:00 to 18:00 on both days
Venue
ICM – International Congress Center Messe München, reached through the West Entrance
Edition
The tenth. Held annually in Munich since 2016
Organiser
RM Rudolf Müller Events GmbH
Exhibitors
Over 250
Visitors
Over 8,000 — architects, engineers, planners, contractors, real estate and facility management professionals, and public-sector clients
Speakers
Over 250. Roughly one speaker for every exhibitor, which is an unusual ratio and it shapes how the floor fills
Programme
A two-day congress running in parallel with the exhibition, integrated open forums, the BIM Town innovation area for startups with pitch sessions, and the Smart Building Smart Construction Innovation World Cup awards
Partner country
Poland is the official partner country for 2026
Other editions
BIM World COPENHAGEN, 16–17 September 2026 at K.B. Hallen in Frederiksberg, and BIM World PARIS, 31 March to 1 April 2027 at Paris Expo Porte de Versailles — separate events, separate organisers, separate floors

Why Exhibitors Choose SOL Germany for BIM World

The venue sets the design brief here, and it is not the venue most exhibitors picture. The ICM is Messe München's congress building. Its exhibition space is foyer and room based rather than open hall, the floors are finished surfaces rather than bare concrete, room heights differ from one area to another inside the same building, and material moves in through delivery docks and lifts rather than through an open hall door you can reverse a truck into. The practical consequence is that panel sizes and structure heights are set by the access route, not by design ambition. We size components to the route before anything is drawn, which is why our stands go up here in one shift instead of being trimmed on site.

Then there is what you are actually exhibiting. At BIM World the product is a screen. Almost nothing weighs anything, almost nothing needs a crate, and the cost driver moves from structure and floor loading to socket count, screen mounting, seating and sound. That last one is underrated: put two hundred and fifty software demos into a carpeted foyer with a lot of glass and you get a room where every conversation competes with the four nearest it. A dense fabric back wall does acoustic work as well as visual work, and on this floor we specify it for both reasons.

Finally, the calendar. Two show days in late November means a compressed build window and, for most stands, a single build shift followed by a same-evening dismantle. It is also the closing stretch of the German show year, when freight capacity and experienced crews are at their tightest. We hold the Munich run in the schedule early rather than sourcing it late, and the stand is pre-assembled and photographed in Frankfurt before it is loaded, because there is no spare afternoon at the ICM in which to solve a problem.

What you sign is one quote. There is no second invoice arriving three weeks after the show closes.

From Our Project Managers

What We've Learned Building in the ICM

Practical notes from the SOL Germany team — the things the exhibitor manual does not spell out.

CD

The ICM Is a Congress Centre, Not an Exhibition Hall

This is the one that catches people, and it catches them at the worst moment — on the loading dock. Exhibitors read 'Messe München' and plan for a hall: drive-in access, generous ceiling, rigging overhead, a build window measured in days. The ICM is a congress building. Exhibition space sits in foyers and rooms, heights vary from one area of the building to another, and your material goes in through docks and lifts rather than a hall door. Everything we build for the ICM is engineered to break down into components that fit the access route, and we confirm the height available at the allocated position rather than assuming a hall figure.

Traffic Arrives in Bursts, Not a Stream

With over 250 speakers against roughly 250 exhibitors, most of your audience is sitting in a session for most of the day. The floor does not fill evenly — it empties, then floods for fifteen or twenty minutes when sessions break, then empties again. Design for the surge. Put a standing demo position where someone walking past can be caught in ten seconds, and keep the seated conversation area deeper in where it will not be blocked when the corridor fills. The single most common layout error here is putting the only screen at the back of the stand.

Sockets, Not Kilowatts, Are the Thing You Under-Order

Nothing on a BIM World stand is heavy, so exhibitors relax about services — and then arrive with six laptops, three large screens, a touch table and a headset rig, all wanting a socket in a specific place. The total power draw is usually modest. The socket count and the socket positions are not, and they are ordered from the venue in advance and are position-dependent. We count devices at briefing stage and order by position, because a power strip trailing across a finished congress-centre floor is both a trip hazard and the first thing a visitor sees.

Acoustics Decide Whether the Demo Lands

A carpeted foyer with hard glass surfaces is a difficult room to talk in once it is full. If your demo needs sound, plan for it: directional speakers aimed into the stand rather than out at the aisle, headphones for anything immersive, and soft material on the back wall and any side panel. We build back walls in tensioned fabric here as a matter of course — it prints better than rigid panel and it absorbs rather than reflects, which on this floor is worth as much as the graphic.

Two Days Means One Build Shift and a Same-Night Dismantle

A two-day show does not get a leisurely build-up. In practice you get one shift to install and you come out the same evening the show closes. That has a design consequence rather than just a scheduling one: anything that needs on-site fabrication, wet finishing or a long cure is the wrong specification for this venue. Every stand is fully assembled and signed off in Frankfurt first, so what happens at the ICM is assembly, not construction.

Public Clients Are in the Room, and They Ask Different Questions

This is not a purely commercial audience. Public-sector building authorities and institutional clients attend in numbers, and their questions run to standards, data handover, interoperability and procurement rather than features and pricing. A stand that states its standards position plainly, at a size readable from the aisle, gets shorter and better conversations — and it saves your team from opening every exchange by answering the same question.

Transparent Pricing

What a BIM World Stand Actually Costs

BIM World is a small-stand show, and pretending otherwise would not help you. Most of this floor sits well under 30 square metres, and for a first edition the honest advice is to buy the smaller stand and put the difference into screens, seating and one extra person on the team. The brackets below are written on that basis.

Essential — 9–18 m²

From €4,500
Best for: startups in the BIM Town area, plug-in and component vendors, consultancies, anyone exhibiting at BIM World for the first time
  • Modular aluminium system frame, sized to the ICM access route
  • Tensioned fabric back wall, full height, acoustically absorbent
  • One branded reception counter
  • Standard LED top-rail lighting
  • One wall-mounted screen position with cable management
  • Graphics design and print, two revision rounds
  • Frankfurt to Munich road freight
  • Installation, dismantling and organiser paperwork

Not included: floor space rental, venue electrical order, screens and hardware, furniture beyond the listed items.

Premium — 60 m² and above

From €34,000
Best for: executive-partner-scale presences and vendors treating BIM World as their principal German date — a small minority of this floor
  • Architectural custom build
  • Multiple enclosed meeting rooms
  • Presentation or theatre position with managed audio
  • Full demo suite with independent supplies to each station
  • Height and rigging confirmed against the ICM technical guidelines for the allocated position
  • Full AV package
  • Technical back-of-house and storage
  • Priority workshop build slot

Not included: floor space rental, rigging fees where the position permits rigging at all, AV hire beyond the package, catering.

Recent Builds

Stands We Have Built

Stands delivered across German and European technical trade fairs, including congress-centre venues where access and height are constrained.

A Guide to BIM World MUNICH for First-Time Exhibitors

BIM World MUNICH is the international platform for the digitalisation of the construction, real estate and facility management industries. The 2026 edition is the tenth and runs 24–25 November at the ICM – International Congress Center Messe München, from 09:00 to 18:00 on both days. It is organised by RM Rudolf Müller Events GmbH and has been held annually in Munich since 2016.

The format matters more than the headline numbers. Over 250 exhibitors share the event with over 250 speakers across a two-day congress, integrated open forums, the BIM Town innovation area for startups, and the Smart Building Smart Construction Innovation World Cup awards. Poland is the official partner country for 2026. Two sister editions exist — Copenhagen in September and Paris the following spring — but they are separate events, and exhibiting at one does not carry over to another.

The ICM Is Not the Messe München Halls — What That Changes

Munich hosts a great many trade fairs, and almost all of them take place in the exhibition halls on the Messe München site. BIM World does not. It runs in the ICM, the congress centre that sits on the same grounds, and for a stand builder the two are different buildings with different rules.

In a hall you get bare concrete, a drive-in door, a ceiling in double figures and rigging points overhead. In the ICM you get a finished congress building: exhibition space arranged around foyers and rooms, floors that have to be protected rather than drilled, available height that changes from one part of the building to another, and material handling through delivery docks and goods lifts. Rigging is not something to assume; where a position permits it at all, it has to be confirmed rather than designed in on faith.

Three design decisions follow directly. First, every component has to fit the access route — which caps panel size and rules out one-piece structures that would be routine in a hall. Second, the available height at your specific position governs the build, so a wall height that works in Hall B of a Messe cannot simply be transplanted. Third, floor protection is a requirement rather than an afterthought, and it belongs in the specification from the start. None of this makes the ICM a difficult venue. It makes it a venue that punishes a stand designed for somewhere else, which is the situation we most often get called in to rescue.

The one instruction worth acting on today: when your position is allocated, ask the organiser for the technical guidelines covering that specific space, and send them to whoever is building your stand before the design is signed off rather than after.

Three BIM World Editions, Three Different Buildings

BIM World is not one show. Three editions run across Europe each year, under different organisers, and — the part that matters to whoever builds your stand — they take place in three completely different types of building. A design that works at one is not automatically buildable at the next.

Munich is the German edition and the one this page is written around: 24–25 November 2026 at the ICM, the congress centre described above, organised by RM Rudolf Müller Events GmbH, with over 250 exhibitors and over 8,000 attendees. Freight is domestic for us — roughly 400 kilometres from the Frankfurt workshop, no customs, no border.

Copenhagen runs 16–17 September 2026 at K.B. Hallen, Peter Bangs Vej 147, in Frederiksberg just outside central Copenhagen, under its own Danish organiser. It is the Nordic edition and the smallest of the three, with more than 70 exhibitors. The venue is an arena — neither a congress centre nor an exhibition hall, so a third set of access rules again. Freight runs roughly 800 kilometres north from Frankfurt, inside the EU, so no customs but a longer crew day and an overnight either side of the build.

Paris runs 31 March and 1 April 2027 at Paris Expo Porte de Versailles, in pavilions 5.2 and 5.3, and carries a digital-twin framing alongside the BIM one. This is the only one of the three held in a conventional exhibition hall, which makes it the only one where the usual hall assumptions — drive-in access, generous height, rigging overhead — are likely to hold. Freight is around 600 kilometres west from Frankfurt, intra-EU, no customs.

We build at all three. If you are exhibiting at more than one within the same twelve months, say so at briefing stage rather than after the first stand has been designed. A structure specified to clear the ICM's goods-lift and dock constraints will travel comfortably to Porte de Versailles and to K.B. Hallen, whereas one designed for the Paris hall may not physically enter Munich. Sequencing the design around the tightest venue first costs nothing. Re-engineering it afterwards does.

Who Exhibits at BIM World and What Visitors Want

Exhibitors are software and technology suppliers to the built environment — modelling and design platforms, common data environments, cost and scheduling tools, facility management systems, reality capture, and a steady flow of startups in the BIM Town area. Executive partners in recent editions have included major international platform vendors alongside German industry bodies.

Visitors are architects, structural and services engineers, planners, contractors, real estate asset managers, facility managers and public-sector building clients. They are not browsing. Most arrive with a live procurement question or an internal transition they are part-way through, and they want to know whether your product fits an existing toolchain rather than whether it is impressive in isolation.

That shapes what belongs on the wall. Interoperability, data handover, standards support and what happens at the boundary between your tool and the three others a practice already runs are the questions that get asked repeatedly. Answering them from the aisle, in large type, is worth more floor-space-per-euro than any rendering of the software interface.

Stand Size: Why Smaller Usually Wins Here

Nine square metres is a real option at BIM World in a way it is not at a large industrial fair. A counter, a full-height back wall and one screen is a complete and credible presence for a startup, a plug-in vendor or a consultancy, and a great many of the exhibitors you will be standing next to are working with exactly that.

Eighteen square metres is the point at which two people can demo simultaneously without talking over each other, and it allows a second screen position at a different height — one standing, one seated. For most vendors attending their first or second edition, this is the size that does the job.

Twenty-four to thirty square metres buys the thing smaller stands cannot offer: a seated conversation set back from the aisle, where a forty-minute discussion with a procurement lead can actually happen while demos continue at the front. If your sales cycle involves long conversations rather than quick captures, this is the threshold worth crossing.

Forty-eight square metres and above supports an enclosed meeting room and a full demo suite. Beyond sixty, you are into the small group of presences that anchor the floor. Given the venue's height and access constraints, additional floor area here buys width and meeting capacity rather than the vertical drama it would buy in a hall — which is worth knowing before you pay for the extra metres.

What a BIM World Stand Costs by Size

Ranges below are all-in for design, fabrication, graphics, domestic road freight, installation and dismantling. They exclude the floor space rental you pay the organiser, and the electrical order placed with the venue.

  • 9 m² modular: €4,100–€8,700
  • 18 m² modular: €4,800–€10,100
  • 24 m² modular with two demo positions: €11,500–€15,000
  • 30 m² custom with a seated meeting corner: €15,000–€19,000
  • 48 m² custom with enclosed meeting room: €19,000–€26,000
  • 60 m² and above, premium: €34,000–€44,000

Common Mistakes, in Order of Frequency

The most common by a distance is designing for an exhibition hall and discovering the ICM at the loading dock — oversized panels, a wall height that will not fit the position, and rigging assumed rather than confirmed. The second is under-ordering sockets: exhibitors count kilowatts, arrive with a dozen devices, and end up running a power strip across a finished floor. The third is putting the only screen at the back of the stand, which works in a steady stream of visitors and fails completely in the burst traffic a congress produces. The fourth is ignoring sound in a hard-surfaced room where two hundred and fifty demos are running at once. The fifth is specifying anything that needs on-site fabrication or a long cure, in a venue that gives you one build shift. Every one of these is settled at design stage or not at all.

Getting Started

Send your stand size, your position number once the organiser has issued it, and a device list — how many screens, at what sizes, standing or seated, and whether anything needs audio. The device list changes the design more than the floor area does. You get a 3D design and an itemised all-in quote, at no charge and with no obligation.

Because BIM World runs annually and because the ICM rewards a structure that breaks down into lift-sized components, a reusable system frame is a particularly sensible purchase at this show — it stores in our Frankfurt warehouse between editions, and the following year costs a graphics refresh rather than a rebuild. Our modular exhibition stands are built for exactly that pattern.

FAQ

BIM World MUNICH 2026 — Frequently Asked Questions

Real answers with real numbers. Click any question to expand.

When and where is BIM World MUNICH 2026?

24–25 November 2026, from 09:00 to 18:00 on both days, at the ICM – International Congress Center Messe München. It is the tenth edition, organised by RM Rudolf Müller Events GmbH, and it has run annually in Munich since 2016.

Is BIM World in the Messe München exhibition halls?

No, and this is the single most useful thing to know before you commission a stand. BIM World takes place in the ICM, the congress centre on the Messe München site — a different building with different rules. Exhibition space is foyer and room based, available height varies by position, floors are finished surfaces that need protecting, and material goes in through delivery docks and goods lifts rather than a drive-in hall door. A stand designed for a hall will not simply drop into the ICM.

How much does a BIM World stand cost?

From €4,500 to around €48,000 depending on size. A modular 9 m² runs €4,100–€8,700 and a modular 18 m² €4,800–€10,100. A 24 m² with two demo positions is typically €5,100–€10,800. A 30 m² custom stand with a seated meeting corner runs €11,500–€16,000, and 48 m² with an enclosed meeting room €19,000–€26,000. Most of this floor sits at the lower end, and that is a sensible place to be for a first edition.

What is not included in the price?

Three things. The floor space rental, which is between you and the organiser. The electrical order placed with the venue. And hardware and extras — screens, computers, AV hire beyond any listed package, furniture beyond the standard set, catering, and staffing during the show.

What size stand should we take for our first BIM World?

Nine to eighteen square metres for most first-time exhibitors, and there is no embarrassment in it — a large share of this floor is at that size. Take 24 to 30 m² if your sales cycle needs a seated conversation set back from the aisle rather than a quick demo capture. Spending the difference on a second screen position and an extra person on the stand usually returns more than the extra floor area would.

How much power will we need, and how is it ordered?

Less than you think in kilowatts, more than you think in sockets. A typical software stand runs several laptops, two or three large screens and sometimes a headset rig — a modest total draw but a lot of individual outlets, each needed in a specific place. The electrical order goes to the venue in advance and is position-dependent. We count the devices at briefing stage and order by position, so nothing ends up on a trailing extension lead.

Can we hang a sign or rig from the ceiling?

Do not assume it. The ICM is a congress building rather than an exhibition hall, and whether rigging is available depends on the specific position you are allocated. We confirm it against the venue's technical guidelines for your space before it goes into a design, and we will tell you if the answer is no rather than designing around a hope.

How tall can the stand be?

It depends on where you are, which is not the answer people expect. Available height genuinely differs between areas of the ICM, so there is no single figure that applies across the building the way a hall limit would. Once your position is allocated we check the guidelines for that space and design to it.

How long is the build-up, and when is dismantling?

A two-day show gets a compressed schedule: in practice one build shift, and dismantling the same evening the show closes. That is why we fully assemble and sign off every stand in our Frankfurt workshop first. What happens at the ICM is assembly, not construction — and nothing that needs wet finishing or a long cure belongs in this specification.

Do you handle the organiser and venue paperwork?

Yes — the electrical order, floor protection, waste removal, crew passes and any rigging permission where the position allows it. We file on the day a contract is signed, because the venue deadlines fall well before build-up and they are the ones that cannot be recovered late.

Is there customs or import duty on the stand?

No. Munich is domestic for us. We build in Frankfurt and drive roughly 400 kilometres south, so there is no customs file and no border on the stand itself. Hardware you ship in from outside the EU is a separate matter and stays with you.

Our demo has audio. Will anyone hear it?

Only if it is planned. The ICM foyer areas are carpeted but carry a lot of hard glass surface, and with over 250 exhibitors running demos at once the room gets loud. Use directional speakers aimed into the stand rather than out at the aisle, headphones for anything immersive, and specify an absorbent back wall. We build in tensioned fabric here partly for that reason.

Why does the floor seem empty and then suddenly full?

Because BIM World is congress-led. With over 250 speakers, most attendees are in a session for much of the day, and the floor fills in bursts of fifteen or twenty minutes when sessions break. Design for it: a standing demo position near the aisle that can catch someone in ten seconds, and the seated area deeper in where it will not be blocked when the corridor fills.

Who actually visits BIM World?

Over 8,000 attendees — architects, structural and building services engineers, planners, contractors, real estate asset managers, facility managers and public-sector building clients. Public clients are a real presence, and their questions run to standards, data handover, interoperability and procurement rather than features.

We are exhibiting in the BIM Town startup area. Do we need a stand builder?

Sometimes not — startup areas are often supplied with a fitted position, in which case the sensible spend is graphics and a screen rather than a structure. Send us what the organiser is providing and we will tell you honestly whether you need us. If a fitted position covers it, we will say so.

Can we reuse the stand at the next BIM World?

Yes, if it is built on a system frame — which is the specification we would recommend here anyway, because components sized for the ICM access route are exactly what stores and rebuilds well. We keep the structure in Frankfurt and refresh the graphics for the next edition.

Is this the same event as BIM World Paris?

No. BIM World MUNICH runs 24–25 November 2026 at the ICM. BIM World PARIS is a separate event with its own organiser, running 31 March and 1 April 2027 at Paris Expo Porte de Versailles in pavilions 5.2 and 5.3, and carrying a digital-twin framing alongside the BIM one. They share a name and a subject, but they are separate events on separate floors, and a booking at one is not a booking at the other.

What about BIM World Copenhagen?

It runs 16–17 September 2026 at K.B. Hallen, Peter Bangs Vej 147 in Frederiksberg, just outside central Copenhagen, under its own Danish organiser. It is the Nordic edition and the smallest of the three, with more than 70 exhibitors, and the venue is an arena rather than a congress centre or an exhibition hall — so it has its own access rules again. We build it, and we quote it separately from Munich.

We are exhibiting at two BIM World editions. Can one stand cover both?

Usually yes, but only if it is designed in the right order. Specify for the tightest venue first — the ICM, whose goods-lift and dock constraints cap component size — and the same structure will travel to Porte de Versailles and to K.B. Hallen without modification. Do it the other way round and a stand built for the Paris hall may not physically enter Munich. Tell us about the second show at briefing stage: sequencing costs nothing, re-engineering does.

How many staff should we plan for?

On 9 m², two — one demoing and one free to catch someone walking past. On 18 m², three. On 24 to 30 m² with a seated area, four, because someone has to stay with a long conversation while the front of the stand keeps working. The burst traffic pattern means a thin team gets overwhelmed for twenty minutes and then stands idle, so plan for the peak rather than the average.

Can I visit the workshop during pre-build?

Yes, and for this venue we encourage it, because the ICM gives you no time to review anything on site. The workshop is about fifteen minutes from Frankfurt Airport. You see the stand fully assembled, check the screen positions and sightlines, and meet the crew who will install it.

What graphics files do you need?

Vector files for logos and any certification or standards marks, and high-resolution raster images at roughly 150 dpi at final print size. Given the international attendance alongside a German-speaking core audience, send the key technical lines in both German and English if you have them.

How do I start?

Send your stand size, your position number if the organiser has issued it, and a device list — how many screens, what sizes, standing or seated, and whether anything needs audio. You get a 3D design and a full itemised quote back.

Ready to Exhibit

Get Your BIM World Stand Design in 48 Hours

Free 3D rendering before contract. One all-inclusive quote with no hidden line items, domestic freight and no customs — engineered to the ICM's access route and confirmed against the height available at your position.

48hrFree 3D Design
€4,500+All-Inclusive
28 daysTo Show Floor
4.9Trustpilot4.9Google
WhatsApp us
WhatsApp us